VA FED H-08-1 SEC 15764-2003 ROOF TOP AIR HANDLNG UNITS《空气处理机组的顶盖》.pdf
《VA FED H-08-1 SEC 15764-2003 ROOF TOP AIR HANDLNG UNITS《空气处理机组的顶盖》.pdf》由会员分享,可在线阅读,更多相关《VA FED H-08-1 SEC 15764-2003 ROOF TOP AIR HANDLNG UNITS《空气处理机组的顶盖》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、04-03M15764-1SECTION 15764ROOF TOP AIR HANDLING UNITSSPEC WRITER NOTE:1. Delete between / - / if notapplicable to project. Also delete anyother item or paragraph not applicablein the section and renumber theparagraphs.2. References to pressure in this sectionare gage pressure unless otherwisenoted.3
2、. DESIGNER NOTE: Following is a list ofVA Standard Details. Coordinate workwith the applicable details.4. 15763.1 DWG, Air Handling UnitSchedule.5. 15763.2 DWG, Access Door Swing Detailfor Air Handling Units.6. 15673.3 DWG, Make-up Air Heating andVentilating Unit Schedule.PART 1 - GENERAL1.1 DESCRIP
3、TIONA. Roof top air handling units including integral components specifiedherein.B. Definitions: Roof Top Air Handling Unit(Roof Top Units, RTU): A factoryfabricated assembly consisting of fan, coils, filters, and othernecessary equipment to perform one or more of the following functions ofcirculati
4、ng, cleaning, heating, cooling, humidifying, dehumidifying, andmixing of air. Design capacities of units shall be as scheduled on thedrawings.1.2 RELATED WORK/A. Seismic restraints for equipment: Section 13081, SEISMIC RESTRAINTSREQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. /B. General mechanical requ
5、irements and items, which are common to more thanone section of Division 15: Section 15050, BASIC METHODS ANDREQUIREMENTS (MECHANICAL).C. Sound and vibration requirements: Section 15200, NOISE AND VIBRATIONCONTROL.D. Piping and duct insulation: Section 15250, INSULATION.E. Piping and valves: Section
6、 15705, HVAC PIPING AND SYSTEMS.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-03M15764-2F. Heating and cooling coils and pressure requirements: Section 15750,HEATING AND COOLING COILS.G. Return and exhaust fans: Section 15822, FANS.H. Requiremen
7、ts for flexible duct connectors, sound attenuators and soundabsorbing duct lining: Section 15840, DUCTWORK AND ACCESSORIES.I. Air filters and filters efficiency: Section 15885, AIR FILTERS.J. HVAC controls: Section 15902, DDC CONTROLS AND INSTRUMENTATION.K. Testing, adjusting and balancing of air an
8、d water flows: Section 15980,TESTING ADJUSTING AND BALANCING.L. Types of motors: Section 16150, MOTORS.M. Types of motor starters: Section 16155, MOTOR STARTERS.1.3 QUALITY ASSURANCEA. Refer to Article, Quality Assurance, in Section 15050, BASIC METHODS ANDREQUIREMENTS (MECHANICAL).B. Certification:
9、 Certify roof top air-handling units in accordance withARI 430.C. Heating, Cooling, and Air Handling Capacity and Performance Standards:ARI 430, ARI 410, ASHRAE 51, and AMCA 210.D. Performance Criteria:1. The fan schedule indicates design cubic meter per minute (cubic feetper minute) and design stat
10、ic pressure. Scheduled fan motors, 375watts (1/2 horsepower) and larger, are sized for the maximum ofpresent or future design cubic meter per minute (cubic feet perminute) at 110 percent design static pressure, but not to exceed 187Pa (3/4 inch water gage) additional pressure.2. Fans and motors shal
11、l be capable of stable operation at designconditions cubic meters per minute (cubic feet per minute) and 110percent pressure as stated above.3. Lower than design pressure drop of approved individual components mayallow use of a smaller fan motor and still provide the safety factor.When submitted as
12、a deviation, a smaller motor may be approved in theinterest of energy conservation. Such a deviation shall not qualifyfor any value engineering incentive claim or reward.4. Select fan operating point to right hand side of peak static pressurepoint and near the peak of static efficiency.5. Operating
13、Limits: AMCA 99.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-03M15764-3E. Units shall be constructed by a manufacturer who has been manufacturingroof top units for at least five (5) years.F. Units shall be shipped in one (1) piece where possibl
14、e and in shrinkwrapping to protect the unit from dirt, moisture and /or road salt.Shipping splits can be provided as required for installation. Liftinglugs will be supplied on each side of the split to facilitate riggingand joining of segments.SPEC WRITERS NOTE: For larger projectsinvolving more tha
15、n five roof top units,the A/E shall select a few typical RTUs,in different configurations, for aninitial submission. The suggesteddifferent configurations are:1. 100 percent outside air RTUs with orwithout heat recovery coils.2. Recirculating type of variable airvolume RTUs with minimum outside aira
16、nd economizer cycle features. Theremaining submission shall be receivedonly after the initial submission isapproved with satisfactory resolutionof all comments made during the reviewand approval process.1.4. SUBMITTALS:A. The contractor shall, in accordance with Section 01340, SAMPLE AND SHOPDRAWING
17、S, furnish a complete submission for all roof top units coveredin the project. The submission shall include all information listedbelow. Partial and incomplete submissions shall be rejected withoutreviews.B. Manufacturers Literature and Data:1. Submittals for RTUs shall include fans, drives, motors,
18、 coils, /humidifiers, / sound attenuators /, mixing box with outside/returnair dampers, filter housings, and all other related accessories. Thecontractor shall provide custom drawings showing total air handlingunit assembly including dimensions, operating weight, accesssections, / diffusion plates /
19、, flexible connections, door swings,controls penetrations, electrical disconnect, lights, duplexreceptacles, switches, wiring, utility connection points, unitsupport system, vibration isolators, drain pan, pressure dropsthrough each component (filter, coil etc) and rigging points.Submittal drawings
20、of section or component only, will not beProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-03M15764-4acceptable. Contractor shall also submit performance data includingperformance test results, charts, curves or certified computerselection data; dat
21、a sheets; fabrication and insulation details; andthe number of pieces that each unit will have to be broken into tomeet shipping and job site rigging requirements. This data shall besubmitted in hard copies and in electronic version compatible toAutoCAD version used by the VA at the time of submissi
22、on.2. Submit sound power levels in each octave band for fan and at entranceand discharge of RTUs at scheduled conditions. Include soundattenuator capacities and itemized internal component attenuation.Internal lining of supply air ductwork with sound absorbing materialis not permitted. In absence of
23、 sound power ratings refer to Section15200, NOISE AND VIBRATION CONTROL.3. Provide fan curves showing cubic meters per minute (cubic feet perminute), static pressure, efficiency, and horsepower for design pointof operation and at maximum design cubic meters per minute (cubicfeet per minute) and 110
24、percent of design static pressure.4. Submit total fan static pressure, external static pressure, for RTUincluding total, inlet and discharge pressures, and itemizedspecified internal losses and unspecified internal losses. Refer toair handling unit schedule on drawings.C. Maintenance and operating m
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VAFEDH081SEC157642003ROOFTOPAIRHANDLNGUNITS 空气 处理 机组 顶盖 PDF

链接地址:http://www.mydoc123.com/p-1075042.html