1、4-09 26 32 53 - 1 SECTION 26 32 53 CENTRAL UNINTERRUPTIBLE POWER SUPPLY SPEC WRITER NOTE: Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable to the section and renumber the paragraphs. This specification is typically used for large multi-module
2、central UPS systems. It can be edited for smaller single-module UPS systems. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the central uninterruptible power supply (UPS). The UPS system shall consist of UPS module, battery system, static bypa
3、ss transfer switch, controls and monitoring. 1.2 RELATED WORK /A. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Requirement for Seismic Restraint for Nonstructural Components./ B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requir
4、ements and items that are common to more than one section of Division 26. C. Section 26 05 21, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW): Cables and Wiring. D. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to prov
5、ide a low impedance path for possible fault currents. E. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduct and outlet boxes. F. Section 26 26 00, POWER DISTRIBUTION UNITS FOR UNINTERRUPTIBLE POWER SYSTEMS: Power distribution units connected to the output of a UPS. 1.3 QUALITY ASSUR
6、ANCE Refer to Paragraph, QUALIFICATIONS, in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 1.4 FACTORY TESTS A. Uninterruptible power supplies shall be thoroughly tested at the factory to assure that there are no electrical or mechanical defects. Provided by IHSNot for ResaleNo reprodu
7、ction or networking permitted without license from IHS-,-,-4-09 26 32 53 - 2 B. The UPS system shall be factory full-load tested to meet the requirements specified using a test battery (not the battery to be supplied with the system) with ac input power and with battery power for a minimum of 8 hour
8、s, with meter readings taken every 30 minutes. Should a malfunction occur, the problem shall be corrected and the test shall be repeated. The tests shall encompass all aspects of operation, such as module failure, static bypass operation, battery failure, input power failure and overload ratings. C.
9、 Furnish four (4) copies of certified manufacturers factory test reports to the Resident Engineer prior to shipment of the UPS equipment to ensure that the UPS equipment has been successfully tested as specified. D. Provide IEEE Std 450 battery installation certification. /E. The Resident Engineer s
10、hall have an option to witness factory tests. The Resident Engineer shall be notified in writing at least 2 weeks before testing. All expenses of the Resident Engineers trip to witness the testing will be paid by the Government./ 1.5 SUBMITTALS Submit in accordance with Section 26 05 11, REQUIREMENT
11、S FOR ELECTRICAL INSTALLATIONS: A. Shop Drawings: 1. Sufficient information, clearly presented, shall be included to determine compliance with drawings and specifications. 2. Include electrical ratings, dimensions, mounting details, materials, required clearances, terminations, weight, wiring and co
12、nnection diagrams, plan, front, side, and rear elevations, accessories, and device nameplate data. B. Manuals: 1. Submit, simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals including technical data sheets, wiring diagrams, and information for orderi
13、ng replacement parts. a. Wiring diagrams shall have their terminals identified to facilitate installation, maintenance, and operation. b. Wiring diagrams shall indicate internal wiring for each item of equipment and the interconnection between the items of equipment. c. Provide a clear and concise d
14、escription of operation, which gives, in detail, the information required to properly operate the equipment. d. Approvals will be based on complete submissions of manuals together with shop drawings. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4-
15、09 26 32 53 - 3 2. Two weeks prior to final inspection, deliver four copies of the final updated maintenance and operating manuals to the Resident Engineer. a. The manuals shall be updated to include any information necessitated by shop drawing approval. b. Complete “As Installed“ wiring and schemat
16、ic diagrams shall be included which show all items of equipment and their interconnecting wiring. c. Show all terminal identification. d. Include information for testing, repair, trouble shooting, assembly, disassembly, and recommended maintenance intervals. e. Provide a replacement parts list with
17、current prices. Include a list of recommended spare parts, tools, and instruments for testing and maintenance purposes. f. Furnish manuals in loose-leaf binder or manufacturers standard binder. C. Certifications: 1. Two weeks prior to final inspection, submit four copies of the following to the Resi
18、dent Engineer: a. Certification by the Contractor that the assemblies have been properly installed, adjusted and tested. b. Certified copies of all of the factory design and production tests, field test data sheets and reports for the assemblies. 1.6 APPLICABLE PUBLICATIONS A. Publications listed be
19、low (including amendments, addenda, revisions, supplements, and errata), form a part of this specification to the extent referenced. Publications are referenced in the text by basic designation only. B. Institute of Engineering and Electronic Engineers (IEEE): C57.110.(1998; R 2004) Recommended Prac
20、tice for Establishing Transformer Capability When Supplying Nonsinusoidal Load Currents C62.41.1(2002) IEEE Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits C62.41.2(2002) IEEE Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Po
21、wer Circuits Std 450.(2002; Errata 2004) Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications Std 485.(1997; R 2003) Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications Provided by IHSNot for ResaleNo rep
22、roduction or networking permitted without license from IHS-,-,-4-09 26 32 53 - 4 C. National Electrical Manufacturers Association (NEMA): PE 1.(2003; R 2003) Uninterruptible Power Systems - Specification and Performance Verification D. National Fire Protection Association (NFPA): 70-02.National Elec
23、trical Code (NEC). 1.7 DELIVERY, STORAGE, AND HANDLING Store UPS indoors in clean dry space with uniform temperature to prevent condensation. Protect UPS from exposure to dirt, fumes, water, corrosive substances, and physical damage. PART 2 - PRODUCTS 2.1 RATINGS A. System Capacity: Unless stated ot
24、herwise, the parameters listed are under full output load at /0.8/ /0.9/ power factor, with batteries fully charged and floating on the dc bus and with nominal input voltage. Overall / /kVA, / /kW, /non/ /N+1/ redundant, at 40 degrees C. B. Battery Capacity: Discharge time to end voltage: /15/ /240/
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2632532009CENTRALUNINTERRUPTIBLEPOWERSUPPLYPDF

链接地址:http://www.mydoc123.com/p-1074970.html