1、09-10 26 32 13 - 1 SECTION 26 32 13 ENGINE-GENERATORS SPEC WRITER NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the furnishing, insta
2、llation, and testing of the /low-voltage/ /medium-voltage/ engine-generator system. This includes, but is not limited to: air filtration, starting system, generator controls, /paralleling switchgear, /instrumentation, lubrication, fuel system, cooling system, and exhaust system. B. The engine-genera
3、tor system shall be fully automatic and shall constitute a unified and coordinated system ready for operation. 1.2 RELATED WORK /A. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Seismic requirements for non-structural equipment./ B. Section 23 05 41, NOISE AND VIBRA
4、TION CONTROL FOR HVAC PIPING AND EQUIPMENT: Requirements for pipe and equipment support and noise control. C. Section 23 07 11, HVAC, PLUMBING, AND BOILER PLANT INSULATION: Requirements for hot piping and equipment insulation. D. Section 23 10 00, FACILITY FUEL SYSTEMS: Fuel supply and storage requi
5、rements. E. Section 25 10 10, ADVANCED UTILITY METERING: Requirements for electrical metering. F. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirements and items common to more than one section of Division 26. G. Section 26 05 21, LOW-VOLTAGE ELECTRICAL POWER C
6、ONDUCTORS AND CABLES (600 VOLTS AND BELOW): Low voltage conductors. H. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents. I. Section 26 05 71, ELECTRICAL SYSTEM PROTECTIVE DEVICE ST
7、UDY: Requirements for protective coordination of a standby and/or essential electrical system. /J. Section 26 13 00, MEDIUM-VOLTAGE SWITCHGEAR: Requirements for medium-voltage switchgear for use with medium-voltage generators./ Provided by IHSNot for ResaleNo reproduction or networking permitted wit
8、hout license from IHS-,-,-09-10 26 32 13 - 2 /K. Section 26 13 13, GENERATOR PARALLELING CONTROLS: Requirements for generator paralleling./ /L. Section 26 23 00, LOW-VOLTAGE SWITCHGEAR: Requirements for secondary distribution switchgear./ /M. Section 26 24 11, DISTRIBUTION SWITCHBOARDS: Requirements
9、 for secondary distribution switchboards./ N. Section 26 36 23, AUTOMATIC TRANSFER SWITCHES: Requirements for automatic transfer switches for use with engine-generators. 1.3 QUALITY ASSURANCE Refer to Paragraph, QUALIFICATIONS, in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 1.4 QUAL
10、ITY ASSURANCE A. The supplier of the engine-generator shall be responsible for satisfactory total operation of the system and its certification. This supplier shall have had experience with three or more installations of systems of comparable size and complexity. Each of these installations shall ha
11、ve been in successful operation for three or more years. Prior to review of submittals, the Government reserves the right to: 1. Have the manufacturer submit a list of locations with similar installations. 2. Inspect any of these installations and question the user concerning the installations witho
12、ut the presence of the supplier. SPEC WRITER NOTE: Edit the paragraph below to match local maintenance and support availability. B. A factory-authorized representative shall be capable of providing emergency maintenance and repairs at the project site within /2/ / / hours maximum of notification. SP
13、EC WRITER NOTE: Determine if witness testing is a VA requirement. Edit or remove paragraph to conform to project requirements. /C. Factory Test: The Government shall have the option of witnessing the following tests at the factory. The tests shall be performed on the specific engine-generator(s) bei
14、ng manufactured for this project. The Government will pay all expenses for the Government representatives trip to witness these tests. The contractor shall notify the /Resident Engineer/ /COTR/ 15 days prior to date of testing. The manufacturer shall furnish load banks, testing instruments, and all
15、other equipment necessary to perform these tests. 1. Load Test: Shall include six hours of continuous operation; four hours while the engine-generator is delivering 100% of the specified Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 32 13
16、- 3 kW and two hours while delivering 110% of the specified kW. During this test record, the following data at 20-minute intervals: Time Engine RPM Oil Temperature Out kW Water Temperature In Fuel Pressure Voltage Water Temperature Out Oil Pressure Amperes Oil Temperature In Ambient Temperature 2. Q
17、uick Start Test: Record time required for the engine-generator to develop specified voltage, frequency, and kW load from a standstill condition./ 1.5 SUBMITTALS A. In accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, submit the following: B. Shop Drawings: Scaled drawings,
18、 showing plan views, side views, elevations, and cross-sections. C. Diagrams: Control system diagrams, elementary diagrams, control sequence diagrams or tables, wiring diagrams, interconnections diagrams (between local control cubicles, remote annunciator panels, remote derangement panels, remote mo
19、nitoring panels, remote exercising panel, automatic transfer switches, paralleling switchgear, and fuel storage tanks, as applicable), illustrative diagrams, flow diagrams, and other like items. D. Technical Data: 1. Published ratings, catalog cuts, pictures, and manufacturers specifications for eng
20、ine-generator, governor, voltage regulator, radiator, muffler, dampers, day tank, pumps, fuel tank, batteries and charger, jacket heaters, torsional vibration, and control and supervisory equipment. 2. Description of operation. 3. Short-circuit current capacity and subtransient reactance. 4. Sound p
21、ower level data. SPEC WRITER NOTE: Edit or include the paragraph below to conform with project requirements. /5. Vibration isolation system performance data from no-load to full-load. This must include seismic qualification of the engine-generator mounting, base, and vibration isolation./ E. Calcula
22、tions: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 32 13 - 4 Detailed engineering calculations with all equations, graphs, assumptions, and approximations shown and data sources referenced. Include any calculated performance derations ap
23、propriate to installed environment. F. Manuals: 1. When submitting the shop drawings, submit complete maintenance and operating manuals of the engine-generator and auxiliaries, including technical data sheets, wiring diagrams, and information for ordering replacement parts. 2. Two weeks prior to the
24、 final inspection, submit four copies of the updated maintenance and operating manual to the /Resident Engineer/ /COTR/: a. Include complete “As Installed“ diagrams, which indicate all items of equipment and their interconnecting wiring. b. Include complete diagrams of the internal wiring for each o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2632132010ENGINEGENERATORSPDF