1、09-10 26 05 41 - 1 SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION SPEC WRITER NOTE: Delete /_/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. Insert additional provisions as required for this project. PART 1 - GE
2、NERAL 1.1 DESCRIPTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts to form a complete underground raceway system. B. “Duct” and “conduit,” and “rigid metal conduit” and “rigid steel conduit” are used interchangeably in this speci
3、fication. 1.2 RELATED WORK A. Section 07 92 00, JOINT SEALANTS: Sealing of conduit penetrations. B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirements and items that are common to more than one section of Division 26. C. Section 26 05 26, GROUNDING AND BONDI
4、NG FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents. D. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits, fittings and boxes for raceway systems. E. /Section 31 20 00, EARTH MOVING/ /Section 31 20 11,
5、 EARTH MOVING (SHORT FORM)/: Trenching, backfill and compaction. 1.3 QUALITY ASSURANCE A. Refer to Paragraph, QUALIFICATIONS, in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. B. Coordinate layout and installation of ducts, manholes, pullboxes, and pull-boxes with final arrangement of
6、other utilities, site grading, and surface features, as determined in the field. 1.4 SUBMITTALS A. Submit in accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. B. Shop Drawings: 1. Clearly present sufficient information to determine compliance with drawings and specificatio
7、ns. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 05 41 - 2 2. Include manholes, pullboxes, duct materials, and hardware. Submit plan and elevation drawings, showing openings, pulling irons, cable supports, cover, ladder, sump, and other a
8、ccessories and details. 3. Proposed deviations from details on the drawings shall be clearly marked on the submittals. If it is necessary to locate manholes or pullboxes at locations other than shown on the drawings, show the proposed locations accurately on scaled site drawings, and submit four cop
9、ies to the /Resident Engineer/ /COTR/ for approval prior to construction. C. Certifications: Two weeks prior to the final inspection, submit four copies of the following certifications to the /Resident Engineer/ /COTR/: 1. Certification by the manufacturer that the materials conform to the requireme
10、nts of the drawings and specifications. 2. Certification by the contractor that the materials have been properly installed, connected, and tested. 1.5 APPLICABLE PUBLICATIONS A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specific
11、ation to the extent referenced. Publications are referenced in the text by designation only. B. American Concrete Institute (ACI): Building Code Requirements for Structural Concrete 318/318M-05 Building Code Requirements for Structural Concrete & Commentary SP-66-04 . ACI Detailing Manual C. America
12、n National Standards Institute (ANSI): 77-07 Underground Enclosure Integrity D. American Society for Testing and Materials (ASTM): C478-09 Standard Specification for Precast Reinforced Concrete Manhole Sections C858-09 Underground Precast Concrete Utility Structures C990-09 Standard Specification fo
13、r Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants. E. Institute of Electrical and Electronic Engineers (IEEE): C2-07 National Electrical Safety Code Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-0
14、9-10 26 05 41 - 3 F. National Electrical Manufacturers Association (NEMA): TC 2-03 Electrical Polyvinyl Chloride (PVC) Tubing And Conduit TC 3-2004 PVC Fittings for Use With Rigid PVC Conduit And Tubing TC 6 & 8 2003 PVC Plastic Utilities Duct For Underground Installations TC 9-2004 Fittings For PVC
15、 Plastic Utilities Duct For Underground Installation G. National Fire Protection Association (NFPA): 70-08 National Electrical Code (NEC) H. Underwriters Laboratories, Inc. (UL): 6-07 . Electrical Rigid Metal Conduit-Steel 467-07 . Grounding and Bonding Equipment 651-05 . Schedule 40 and 80 Rigid PV
16、C Conduit and Fittings 651A-00 Type EB and A Rigid PVC Conduit and HDPE Conduit 651B-07 Continuous Length HDPE Conduit I. U.S. General Services Administration (GSA): A-A-60005-1998 . Frames, Covers, Gratings, Steps, Sump and Catch Basin, Manhole 1.6 STORAGE Lift and support pre-cast concrete structu
17、res only at designated lifting or supporting points. PART 2 - PRODUCTS SPEC WRITER NOTES: 1. Make material requirements agree with applicable requirements specified in the referenced Applicable Publications. Update and specify only that which applies to the project. 2. This specification is intended
18、 to be used in concert with VA manhole and pullbox Standard Details. Include details on plans and edit details as necessary to fit project needs. 2.1 PRE-CAST CONCRETE MANHOLES AND HARDWARE A. Structure: Factory-fabricated, reinforced-concrete, monolithically-poured walls and bottom. Frame and cover
19、 shall form top of manhole. Comply with ASTM C 858. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 05 41 - 4 B. Cable Supports: 1. Cable stanchions shall be hot-rolled, heavy duty, hot-dipped galvanized “T“ section steel, 2.25 in 56 mm x 0.
20、25 in 6 mm in size, and punched with 14 holes on 1.5 in 38 mm centers for attaching cable arms. 2. Cable arms shall be 0.1875 in 5 mm gauge, hot-rolled, hot-dipped galvanized sheet steel, pressed to channel shape. Arms shall be approximately 2.5 in 63 mm wide x 14 in 350 mm long. 3. Insulators for c
21、able supports shall be high-glazed, wet process porcelain, and shall completely encircle the cable. 4. Equip each cable stanchion with two spare cable arms and six spare insulators for future use. SPEC WRITER NOTE: Edit paragraph below to conform to project requirements. C. Ladder: /Aluminum/ /Fiber
22、glass/ with 16 in 400 mm rung spacing. Provide securely-mounted ladder for every manhole over 4 ft 1.2 M deep. D. Ground Rod Sleeve: Provide a 3 in 75 mm PVC sleeve in manhole floors so that a driven ground rod may be installed. E. Sump: Provide 12 in x 12 in 305 mm x 305 mm covered sump frame and c
23、over. 2.2 PULLBOXES SPEC WRITER NOTE: Edit paragraphs below to conform to project requirements. A. General: Size as indicated on drawings. Provide pullboxes with weatherproof, non-skid covers with recessed hook eyes, secured with corrosion- and tamper-resistant hardware. Cover material shall be iden
24、tical to pullbox material. Covers shall have molded lettering, ELECTRIC or SIGNAL as applicable. Pullboxes shall comply with the requirements of ANSI/SCTE 77 /Tier 5/ /Tier 8/ /Tier 15/ /Tier 22/ loading. Provide pulling irons, 0.875 in 22 mm diameter galvanized steel bar with exposed triangular-sha
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2605412010UNDERGROUNDELECTRICALCONSTRUCTIONPDF

链接地址:http://www.mydoc123.com/p-1074948.html