1、09-10 26 05 13 - 1 SECTION 26 05 13 MEDIUM VOLTAGE CABLES SPEC WRITER NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, inst
2、allation, and connection of medium voltage cables, splices, and terminations. 1.2 RELATED WORK A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirement and items that are common to more than one section of Division 26. B. Section 26 05 26, GROUNDING AND BONDING
3、FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents. C. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits for medium voltage cables. D. Section 26 05 41, UNDERGROUND ELECTRICAL CONSTRUCTION: Manholes and
4、ducts for medium voltage cables. E. Section 31 20 00, EARTH MOVING: Bedding of conduits. 1.3 QUALITY ASSURANCE Refer to Paragraph, QUALIFICATIONS, in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 1.4 FACTORY TESTS Medium voltage cables shall be thoroughly tested at the factory per NEM
5、A WC 74 to ensure that there are no electrical defects. Factory tests shall be certified. 1.5 SUBMITTALS A. In accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, submit the following: B. Shop Drawings: 1. Clearly present sufficient information to determine compliance with d
6、rawings and specifications. 2. Include product and installation information for cables, splices, terminations, and fireproofing tape. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 05 13 - 2 C. Samples: After approval and prior to installat
7、ion, furnish the /Resident Engineer/ /COTR/ with a minimum 12 in 300 mm length of each type and size of cable, along with the tag from the reel from which the sample was taken. The sample shall contain the manufacturers markings, showing all cable jacket information. D. Certifications: 1. Factory Te
8、st Reports: Prior to installation of the cables, deliver four copies of the manufacturers certified NEMA WC 71 or WC 74 standard factory test reports to the /Resident Engineer/ /COTR/. Certified copies of test data shall show conformance with the referenced standards and shall be approved prior to d
9、elivery of cable. 2. Compatibility: Provide certification from the cable manufacturer that the splices and terminations are approved for use with the cable. 3. Field Test Reports: Test reports shall comply with the paragraph entitled “Acceptance Checks and Tests.” After testing, submit four certifie
10、d copies to the /Resident Engineer/ /COTR/ of each of the graphs specified under field testing. 4. After splices and terminations have been installed and tested, deliver four copies of a certificate by the contractor to the /Resident Engineer/ /COTR/ which includes the following: a. A statement that
11、 the materials, detail drawings, and printed instructions used are those contained in the kits approved for this contract. b. A statement that each splice and each termination was completely installed in a single continuous work period by a single qualified worker without any overnight interruption.
12、 c. A statement that field-made splices and terminations conform to the following requirements: 1) Pencil the cable insulation precisely. 2) Connector installations: a) Use tools that are designed for the connectors being installed. b) Round and smooth the installed connectors to minimize localized
13、voltage stressing of the insulating materials. 3) Remove contaminants from all surfaces within the splices and terminations before installing the insulating materials. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 05 13 - 3 4) Solder block
14、 throughout stranded grounding wires that might penetrate the splicing and terminating materials. 5) Use mirrors to observe the installation of materials on the backsides of the splices and terminations. 6) Eliminate air voids throughout the splices and terminations. 7) Stretch each layer of tape pr
15、operly during installation. d. List all the materials purchased and installed for the splices and terminations for this contract, including the material descriptions, manufacturers names, catalog numbers, and total quantities. E. Installer Approval: 1. Employees who install splices and terminations
16、and test the cables shall have not fewer than five years of experience splicing and terminating cables equivalent to those being spliced and terminated, including experience with the materials in the kits. 2. Furnish satisfactory proof of such experience for each employee who splices or terminates t
17、he cables. SPEC WRITER NOTE: The A/E shall confirm with the serving utility company as to which entity specifies, purchases, furnishes, installs, inspects, and approves service entrance cabling. /F. Power Company Approval: Prior to construction, obtain written approval from the power company supplyi
18、ng electrical service for the following items: 1. Service entrance cables. Obtain the power companys written approval on the submittal papers for the cables before submitting them for /Resident Engineer/ /COTR/ approval. 2. A list of employees who will splice and terminate the service entrance cable
19、s./ 1.6 APPLICABLE PUBLICATIONS A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only: American Society for Testing and Materials (ASTM):
20、 B3-01 (R2007) Standard Specification for Soft or Annealed Copper Wire B. Institute of Electrical and Electronics Engineers, Inc. (IEEE): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 05 13 - 4 386-95 (R2001) . Separable Insulated Connecto
21、r Systems for Power Distribution Systems above 600 V 400-01 . Guide for Field Testing and Evaluation of the Insulation of Shielded Power Cable Systems 400.2-05 . Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF) 400.3-06 . Guide for Partial Discharge Testing of S
22、hielded Power Cable Systems in a Field Environment 404-00 . Extruded and Laminated Dielectric Shielded Cable Joints Rated 2500-500,000 Volts C. National Electrical Manufacturers Association (NEMA): WC 71-99 . Standard for Non-Shielded Cables Rated 2001-5000 Volts for Use in the Distribution of Elect
23、rical Energy (ICEA S-96-659) WC 74-06 . 5-46 KV Shielded Power Cable for Use in the Transmission and Distribution of Electrical Energy (ICEA S-93-969) D. National Fire Protection Association (NFPA): 70-08 National Electrical Code (NEC) E. Underwriters Laboratories (UL): 1072-06 . Medium-Voltage Powe
24、r Cables 1.7 SHIPMENT AND STORAGE A. Cable shall be shipped on reels such that it is protected from mechanical injury. Each end of each length of cable shall be hermetically sealed with manufacturers end caps and securely attached to the reel. B. Cable stored and/or cut on site shall have the ends t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2605132010MEDIUMVOLTAGECABLESPDF