VA 23 84 00-2011 HUMIDITY CONTROL EQUIPMENT.pdf
《VA 23 84 00-2011 HUMIDITY CONTROL EQUIPMENT.pdf》由会员分享,可在线阅读,更多相关《VA 23 84 00-2011 HUMIDITY CONTROL EQUIPMENT.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、05-11 23 84 00 - 1 SECTION 23 84 00 HUMIDITY CONTROL EQUIPMENT SPEC WRITER NOTE: Delete between /_/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies /desiccant /deh
2、umidifier units for /preconditioning of existing or new air conditioning systems/and/stand-alone units use for dehumidifying air/ and/ packaged mechanical dehumidification units for /therapeutic/ pools/. 1.2 RELATED WORK A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipme
3、nt. B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Seismic requirements for non-structural equipment. C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC: General mechanical requirements and items, which are common to more than one section of Division 23. D. Section
4、 23 23 00, REFRIGERANT PIPING: Requirements for field refrigerant piping. E. Section 23 21 13, HYDRONIC PIPING: Requirements for field hot water piping. F. Section 23 22 13, STEAM AND CONDENSATE HEATING PIPING: Requirements for field steam and condensate piping. G. Section 23 82 16, AIR COILS: Requi
5、rements for run-around system coils. H. Section 23 31 00, HVAC DUCTS AND CASINGS: Requirements for sheet metal ducts and fittings. I. Section 23 40 00, HVAC AIR CLEANING DEVICES: Requirements for filters including efficiency. J. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: Requirements
6、for controls and instrumentation. K. Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC: Requirements for testing, adjusting and balancing of HVAC system. L. Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT: Requirements for HVAC motors. Provided by IHSN
7、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 84 00 - 2 M. Section 26 29 11, LOW-VOLTAGE MOTOR STARTERS: Requirements for motor starters. N. Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and
8、training. 0. 01 91 00, GENERAL COMMISSIONING REQUIREMENTS 1.3 QUALITY ASSURANCE A. Refer to the GENERAL CONDITIONS. B. Refer to specification Section 01 00 00, GENERAL REQUIREMENTS for performance tests and instructions to VA personnel. C. Refer to paragraph, QUALITY ASSURANCE, in specification Sect
9、ion 23 05 11, COMMON WORK RESULTS FOR HVAC. D. Unit(s) shall be provided by a manufacturer who has been manufacturing desiccant dehumidifiers and have been in satisfactory service for at least three (3) years. 1.4 SUBMITTALS A. Submit in accordance with specification Section 01 33 23, SHOP DRAWINGS,
10、 PRODUCT DATA, and SAMPLES. B. Manufacturers Literature and Data: 1. Technical data on design operating inlet and outlet conditions, air flows with diagram showing air volumes and conditions throughout the system, dehumidification capacity, filtration and fan motor and electrical power data. 2. A ge
11、neral arrangement diagram with overall dimensions showing all major components with overall dimensions, utility and duct work connections, bolting arrangement, operating weight and required service and equipment removal clearances. 3. Control diagrams for / preconditioning of existing and / or new a
12、ir conditioning system / stand alone use for dehumidifying air, / electric circuits interface all control set points. C. Shop drawings shall indicate assembly, unit dimensions, weight loading, required clearances, construction details, and field connection details. D. Submit fan curves with specifie
13、d operating point clearly plotted and sound power levels for both fan outlet and casing radiation at rated capacity. E. Submit unit control system documentation required for interface with BACnet protocol DDC control system. Submit BACnet compliant Protocol Implementation Conformance Statement (PICS
14、) for all controllers. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 84 00 - 3 F. Submit electrical requirements for power supply wiring including wiring diagrams for interlock and control wiring, clearly indicating factory-installed and f
15、ield-installed wiring. G. Certificate: Evidence of satisfactory performance on three similar installations. H. Provide installation, operating and maintenance instructions, in accordance with Article, INSTRUCTIONS, in specification Section 01 00 00, GENERAL REQUIREMENTS. I. Performance test report:
16、In accordance with PART 3. J. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS. 1.5 AP
17、PLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. B. Air-conditioning, Heating and Refrigeration Institute (AHRI) 410-01 . ForcedCirculation Air-Cooling and Air
18、-Heating Coils C. Air Movement and Control Association (AMCA): 99-10 Standards Handbook 210-07 . Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (ANSI) 301-06 . Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (ANSI) D. American Society of Heating, Refriger
19、ating and Air-Conditioning Engineers (ASHRAE) 52.2-07 METHOD OF TESTING General Ventilation Air Cleaning Devices for Removal Efficiency by Particle Size (ANSI) 62.1-10 Ventilation for Acceptable Indoor Air Quality (ANSI) E. American Bearing Manufacturers Association (ABMA) 9-1990 (R2008) . Load Rati
20、ngs and Fatigue Life for Ball Bearings (ANSI) F. National Fire Protection Association (NFPA) 90A-09 . Standard for the Installation of Air-Conditioning and Ventilating Systems 70-0511 National Electrical Code Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
21、HS-,-,-05-11 23 84 00 - 4 1.6 QUALITY ASSURANCE A. Fan Performance Ratings: Conform to AMCA 210 and bear the AMCA Certified Rating Seal. B. Sound Ratings: AMCA 301; tested to AMCA 300 and bear AMCA Certified Sound Rating Seal. C. Fabrication: Conform to AMCA 99. D. Air Coils: Certify capacities, pre
22、ssure drops, and selection procedures in accordance with AHRI 410. E. Product of manufacturer regularly engaged in production of pool dehumidification equipment who issues complete catalog data on total product. 1.7 DELIVERY, STORAGE, AND HANDLING A. Accept products on site in factory-fabricated pro
23、tective containers, with factory-installed shipping skids and lifting lugs. Inspect for damage. B. Store in clean dry place and protect from weather and construction traffic. Handle carefully to avoid damage to components, enclosures and finish. C. Comply with manufacturers rigging and installation
24、instructions. 1.8 PROJECT CONDITIONS Do not operate units for any purpose, temporary or permanent, until ductwork is clean, filters are in place, bearings lubricated, fan has been test run, all piping is connected and energized and all wiring complete and tested. 1.9 ADDITIONAL REQUIREMENTS A. Provi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2384002011HUMIDITYCONTROLEQUIPMENTPDF
