1、04-11 23 82 16 - 1 SECTION 23 82 16 AIR COILS SPEC WRITER NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION Heating and cooling coils for air handling unit and duc
2、t applications 1.2 RELATED WORK A. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION. B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC. C. Section 23 31 00, HVAC DUCTS AND CASINGS D. Section 23 36 00, AIR TERMINAL UNITS: Reheat coils for VAV/CV terminals. E. Section 23 73
3、00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS. F. Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS G. Section 23 82 00, CONVECTION HEATING AND COOLING UNITS H. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and tr
4、aining. I. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS 1.3 QUALITY ASSURANCE A. Refer to paragraph, QUALITY ASSURANCE, Section 23 05 11, COMMON WORK RESULTS FOR HVAC, /Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION/. B. Unless specifically exempted by these spec
5、ifications, heating and cooling coils shall be tested, rated, and certified in accordance with AHRI Standard 4l0 and shall bear the AHRI certification label. 1.4 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Manufacturers Literature and Data f
6、or Heating and Cooling Coils: Submit type, size, arrangements and performance details. Present application ratings in the form of tables, charts or curves. C. Provide installation, operating and maintenance instructions. D. Certification Compliance: Evidence of listing in current ARI Directory of Ce
7、rtified Applied Air Conditioning Products. E. Coils may be submitted with Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS, Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS, Section 23 36 00, AIR TERMINAL UNITS, or Section 23 82 00, CONVECTION HEATING AND COOLING UN
8、ITS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 82 16 - 2 F. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion
9、, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS. 1.5 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. B. Air Conditio
10、ning and Refrigeration Institute (AHRI): Directory of Certified Applied Air Conditioning Products AHRI 4l0-01 Forced-Circulation Air-Cooling and Air-Heating Coils C. American Society for Testing and Materials (ASTM): B75/75M-02 . Standard Specifications for Seamless Copper Tube D. National Fire Prot
11、ection Association (NFPA): 70-11 National Electric Code E. National Electric Manufacturers Association (NEMA): 250-11 . Enclosures for Electrical Equipment (1,000 Volts Maximum) F. Underwriters Laboratories, Inc. (UL): 1996-09 Electric Duct Heaters PART 2 - PRODUCTS 2.1 HEATING AND COOLING COILS A.
12、Conform to ASTM B75 and AHRI 410. B. Surgical Suites All Locations: All coils installed in the air handling units serving surgical suites, duct-mounted reheat coils, and air terminal unit-mounted reheat coils shall be equipped with copper fins. SPEC WRITER NOTE: Provide corrosion protection for all
13、coils located in the air-handling unit coils in high-humidity locations (VA HVAC Design Manual Chapter 7) and as determined by the designer for a specific location. Coating should not be used for the chemically corrosive locations where the pH values are not within 3 to 12. C. High Humidity Location
14、s: For air-handling unit mounted coils provide the following corrosion treatment: 1. Epoxy Immersion Coating Electrically Deposited: The multi-stage corrosion-resistant coating application comprises of cleaning (heated alkaline immersion bath) and reverse-osmosis immersion rinse prior to the start o
15、f the coating process. The coating thickness shall be Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 82 16 - 3 maintained between 0.6-mil and 1.2-mil. Before the coils are subjected to high-temperature oven cure, they are treated to permeat
16、e immersion rinse and spray. Where the coils are subject to UV exposure, UV protection spray treatment comprising of UV-resistant urethane mastic topcoat shall be applied. Provide complete coating process traceability for each coil and minimum five years of limited warranty. 2. The coating process s
17、hall such that uniform coating thickness is maintained at the fin edges. The quality control shall be maintained by ensuring compliance to the applicable ASTM Standards for the following: a. Salt Spray Resistance (Minimum 6,000 Hours) b. Humidity Resistance (Minimum 1,000 Hours) c. Water Immersion (
18、Minimum 260 Hours) d. Cross-Hatch Adhesion (Minimum 4B-5B Rating) e. Impact Resistance (Up to 160 Inch/Pound) D. Tubes: Minimum 16 mm (0.625 inch) tube diameter; Seamless copper tubing. E. Fins: 0.1397 mm (0.0055 inch) aluminum or 0.1143 mm (0.0045 inch) copper mechanically bonded or soldered or hel
19、ically wound around tubing. F. Headers: Copper, welded steel or cast iron. Provide seamless copper tubing or resistance welded steel tube for volatile refrigerant coils. G. “U“ Bends, Where Used: Machine die-formed, silver brazed to tube ends. H. Coil Casing: 1.6 mm (l6 gage) galvanized steel with t
20、ube supports at 1200 mm (48 inch) maximum spacing. Construct casing to eliminate air bypass and moisture carry-over. Provide duct connection flanges. I. Pressures kPa (PSIG): Pressure Water Coil Steam Coil Refrigerant Coil Test 2070 (300) 1725 (250) 2070 (300) Working 1380 (200) 520 (75) 1725 (250)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2382162011AIRCOILSPDF