VA 23 81 23-2011 COMPUTER-ROOM AIR-CONDITIONERS.pdf
《VA 23 81 23-2011 COMPUTER-ROOM AIR-CONDITIONERS.pdf》由会员分享,可在线阅读,更多相关《VA 23 81 23-2011 COMPUTER-ROOM AIR-CONDITIONERS.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、04-11 23 81 23 - 1 SECTION 23 81 23 COMPUTER-ROOM AIR-CONDITIONERS SPEC WRITER NOTES: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. The spec writer shall review the Physical Security Design Ma
2、nual for VA Facilities to determine and include any Mission Critical or Life Safety requirements called out. PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies process cooling split systems air conditioning unit. B. Definitions: 1. Energy Efficiency Ratio (EER): A ratio calculated by dividin
3、g the cooling capacity in Btuh by the power input in watts at any given set of rating conditions, expressed in Watts (Btu/h) per watt. 2. Coefficient of Performance (COP): A ratio calculated by dividing the change in heating or cooling capacity (Btu/h) to the energy consumed by the system (kW), expr
4、essed in Btu/kWh. 3. Unitary (AHRI): Consists of one or more factory-made assemblies, which normally include an evaporator or cooling coil, a compressor and condenser combination, and may include a heating function. 4. CRAC Units: Computer Room Air Conditioning Units. 1.2 RELATED WORK A. Section 01
5、00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment. /B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Seismic requirements for non-structural equipment./ C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC: General mechanical requirements and items, w
6、hich are common to more than one section of Division 23. D. Section 23 21 23, HYDRONIC PUMPS and Section 23 22 23, STEAM CONDENSATE PUMPS: Requirements for pumping equipment. E. Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT: Requirements for vibration isolators and room
7、 noise level. F. Section 23 07 11, HVAC, PLUMBING, and BOILER PLANT INSULATION: Requirements and for ducts and piping insulation. G. Section 23 23 00, REFRIGERANT PIPING: Requirements for field refrigerant piping. Provided by IHSNot for ResaleNo reproduction or networking permitted without license f
8、rom IHS-,-,-04-11 23 81 23 - 2 H. Section 23 21 13, HYDRONIC PIPING and Section 23 22 13, STEAM and CONDENSATE HEATING PIPING: Requirements for condensate piping and fittings / and steam piping /. I. Section 23 31 00, HVAC DUCTS and CASINGS: Requirements for sheet metal ducts and fittings. J. Sectio
9、n 23 40 00, HVAC AIR CLEANING DEVICES: Requirements for filters including efficiency. K. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: Requirements for controls and instrumentation. L. Section 23 05 93: TESTING, ADJUSTING, and BALANCING FOR HVAC: Requirements for testing, adjusting and b
10、alancing of HVAC system. M. Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training. 1.3 QUALITY ASSURANCE Refer to specification Section 23 05 11, COMMON WORK RESULTS FOR HVAC. 1.4 SUBMITTALS A. Submit in accordance with specificati
11、on Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Manufacturers Literature and Data, rated capacities (at design indoor and outdoor conditions), EER/COP, operating characteristics, required specialties and accessories. Submit published catalog selection data showing equipment ratings
12、 and compliance with required sensible ratio. 1. Indoor Air Conditioning Unit 2. Glycol Pump Package 3. Dry Cooler 4. Air Cooled Condensing Unit C. Submit detailed equipment assemblies with dimensions, operating weights, required clearances. D. Submit wiring diagrams for power, alarm and controls. E
13、. Certification: Submit, simultaneously with shop drawings, a proof of certification: F. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirement
14、s of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS. 1.5 GUARANTEE The unit shall be guaranteed against all mechanical defects in material, parts or workmanship and shall be repaired or replaced at the Contractors expense within the period of one year from final acceptance. Contractor shall adhere t
15、o a four hour service response time to troubles during the guarantee period. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 81 23 - 3 1.6 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the exte
16、nt referenced. The publications are referenced in the text by the basic designation only. B. Federal Specifications (Fed Spec): 00-A-374C-95 . Air-Conditioners with Remote Condensing Units or Remote Air-cooled and Water-Cooled Condenser Units, Unitary TT-C-490D-93 . Cleaning Methods for Ferrous Surf
17、aces and Pretreatments for Organic Coatings C. Air-Conditioning, Heating and Refrigeration Institute (AHRI) Standards: 210/240-08 . Performance Rating of Unitary Air-Conditioning and Air-Source Heat Pump Equipment 340/360-07 . Performance Rating of Commercial and Industrial Unitary Air Conditioning
18、and Heat Pump Equipment 410-01 . Forced-Circulation Air-Cooling and Air-Heating Coils 460-2005 . Performance Rating of Remote Mechanical-Draft Air-Cooled Refrigerant Condensers 520-04 . Performance Rating of Positive Displacement Condensing Units AHRI-DCPP Directory of Certified Product Performance
19、- Applied Directory of Certified Products D. Air Movement and Control Association (AMCA): 210-07 . Laboratory Methods of Testing Fans for Certified Aerodynamic Performance Rating (ANSI) 410-96 . Recommended Safety Practices for Users and Installers of Industrial and Commercial Fans E. American Socie
20、ty of Heating, Refrigerating, and Air-Conditioning Engineers Inc. (ASHRAE): 15-10 Safety Standard for Refrigeration Systems (ANSI) 90.1-10 Energy Standard for Buildings except Low-Rise Residential Buildings (ANSI Approved; IESNA Co-sponsored) 2008 Handbook HVAC Systems and Equipment 2010 Handbook Re
21、frigeration 52.1-92 Gravimetric and Dust-Spot Procedures for Testing Air-Cleaning Devices used in General Ventilation for Removing Particulate Matter F. American Society of Testing and Materials (ASTM): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,
22、-04-11 23 81 23 - 4 B117-09 Standard Practice for Operating Salt Spray (Fog) Apparatus G. National Electrical Manufacturers Association (NEMA): MG 1-09 (R2010) Motors and Generators (ANSI) H. National Fire Protection Association (NFPA) Publications: 70-11 National Electrical Code 90A-09 . Standard f
23、or the Installation of Air-Conditioning and Ventilating Systems PART 2 - PRODUCTS SPEC WRITER NOTE: Coordinate the Computer Room Air Conditioning Unit location with the OIT (Office of Information Technology) requirements. For remote location outside the computer room, select the equipment and access
24、ories to account for higher static pressure and possible requirement for a larger fan motor. 2.1 FLOOR-MOUNTED UNITS 28 KW (8 TONS) AND LARGER A. Description: Packaged, factory assembled, prewired, and prepiped; consisting of cabinet, fans, filters, humidifier, and controls. B. Cabinet and Frame: We
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2381232011COMPUTERROOMAIRCONDITIONERSPDF

链接地址:http://www.mydoc123.com/p-1074934.html