1、02-11 238100-1 SECTION 23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT SPEC WRITER NOTE: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies / s
2、elf-contained, / split-systems, / rooftop, / room-type, / and / through-the-wall packaged terminal / air conditioners/and gas-fired furnaces/. B. Definitions: 1. Energy Efficiency Ratio (EER): The ratio of net cooling capacity is Btu/h to total rate of electricity input in watts under designated ope
3、rating conditions (Btu hour/Watt). 2. Seasonal Energy Efficiency Ratio (EER): The ratio of the total cooling output of an air conditioner during its normal annual usage period for cooling in Btu/h divided by total electric energy input in watts during the same period (Btu hour/Watt). 3. Unitary: A U
4、nitary Air Conditioner consists of one or more factory-made assemblies which normally include an evaporator or cooling coil, a compressor and condenser combination, and may include a heating function as well. 4. Where such equipment is provided in more than one assembly the separated assemblies are
5、to be designed to be used together and the requirements of rating are based upon use of matched assemblies. 1.2 RELATED WORK /A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment: Seismic requirements for non-structural equipment./ B. Section 23 05 11, COMMON WORK RESULT
6、S FOR HVAC: General mechanical requirements and items, which are common to more than one section of Division 23. C. Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT: Requirements for different types of vibration isolators and noise ratings in the occupied areas. D. Section
7、 23 07 11, HVAC and BOILER PLANT INSULATION: Requirements for piping insulation. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-02-11 238100-2 E. Section 23 23 00, REFRIGERANT PIPING: Requirements for refrigerant pipes and fittings. F. Section 23 36
8、 00, AIR TERMINAL UNITS and Section 23 82 00, CONVECTION HEATING and COOLING UNITS: Requirements for other similar units. G. Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS: Requirements for air handling units using chilled water and hot water coils. H. Section 23 74 13, PACKAGED, OUTDOO
9、R, CENTRAL-STATION AIR-HANDLING UNITS: Requirements for air handling units using chilled water and hot water coils. I. Section 23 40 00, HVAC AIR CLEANING DEVICES: Requirements for air filtration. J. Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness ch
10、ecklists, and training. /K. Section 23 81 23, COMPUTER-ROOM AIR-CONDITIONERS: Requirements for computer room units./ /L. Section 23 05 93, TESTING, ADJUSTING, and BALANCING FOR HVAC: Requirements for testing and adjusting air balance./ 1.3 QUALITY ASSURANCE A. Refer to specification Section 23 05 11
11、, COMMON WORK RESULTS FOR HVAC. B. Safety Standards: ASHRAE Standard 15, Safety Code for Mechanical Refrigeration. 1.4 SUBMITTALS A. Submit in accordance with specification Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES B. Manufacturers literature and data: 1. Sufficient information, inc
12、luding capacities, pressure drops and piping connections clearly presented, shall be included to determine compliance with drawings and specifications for units noted below: a. Unitary air conditioners: 1) Self-contained units 2) Split systems 3) Rooftop units b. Window air conditioners c. Through-t
13、he-wall packaged terminal air conditioning units d. Gas-Fired Furnaces 2. Unit Dimensions required clearances, operating weights accessories and start-up instructions. 3. Electrical requirements, wiring diagrams, interlocking and control wiring showing factory installed and portions to be field inst
14、alled. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-02-11 238100-3 4. Mounting and flashing of the roof curb to the roofing structure with coordinating requirements for the roof membrane system. C. Certification: Submit proof of specified ARI Cert
15、ification. D. Performance Rating: Submit catalog selection data showing equipment ratings and compliance with required sensible-to-heat-ratio, energy efficiency ratio (EER), and coefficient of performance (COP). E. Operating and Maintenance Manual: Submit three copies of Operating and Maintenance ma
16、nual to Resident Engineer three weeks prior to final inspection. F. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00
17、 COMMISSIONING OF HVAC SYSTEMS. 1.5 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. B. Federal Specifications (Fed. Spec.): A-A-50502-90 Air conditioner (Un
18、itary Heat Pump) Air to Air (3000-300,000 Btu) C. Military Specifications (Mil. Specs.): MIL-PRF-26915D-06.Primer Coating, for Steel Surfaces D. Air-Conditioning, Heating, and Refrigeration Institute (AHRI): 210/240-08Performance Rating of Unitary Air-Conditioning and Air-Source Heat Pump Equipment
19、270-08Sound Rating of Outdoor Unitary Equipment 310/380-04Standard for Packaged Terminal Air-Conditioners and Heat Pumps (CSA-C744-04) 340/360-07Performance Rating of Commercial and Industrial Unitary Air-Conditioning and Heat Pump Equipment 520-04Performance Rating of Positive Displacement Condensi
20、ng Units E. Air Movement and Control Association (AMCA): 210-07Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (ANSI) 410-96Recommended Safety Practices for Users and Installers of Industrial and Commercial Fans F. American National Standards Institute (ANSI): S12.51-02(R2007)A
21、coustics - Determination of Sound Power Levels of Noise Sources Using Sound Pressure - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-02-11 238100-4 Precision Method for Reverberation Rooms (same as ISO 3741:1999) G. American Society of Heating, Ref
22、rigerating, and Air-Conditioning Engineers (ASHRAE): 2008 Handbook.HVAC Systems and Equipment 15-10.Safety Standard for Refrigeration Systems (ANSI) H. American Society of Testing and Materials (ASTM): B117-09.Standard Practice for Operating Salt Spray (Fog) Apparatus I. American Society of Civil En
23、gineers (ASCE) ASCE 7-10.Minimum Design Loads for Buildings and Other Structures J. National Electrical Manufacturers Association (NEMA): MG 1-09 (R2010).Motors and Generators (ANSI) ICS 1-00 (R2005, R2008).Industrial Controls and Systems: General Requirements K. National Fire Protection Association
24、 (NFPA) Publications: 90A-09Standard for the Installation of Air-Conditioning and Ventilating Systems PART 2 - PRODUCTS 2.1 UNITARY AIR CONDITIONERS - GENERAL A. Applicable ARI Standards: 1. Cooling Capacity 39.6 kW (135,000 Btu/h) and More: AHRI 340/ 360. 2. Cooling Capacity Less Than 39.6 kW (135,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2381002011DECENTRALIZEDUNITARYHVACEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-1074933.html