1、04-11 23 74 13 - 1 SECTION 23 74 13 PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SPEC WRITER NOTES: 1. Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. References to pressure in this sect
2、ion are gage pressure unless otherwise noted. 3. The spec writer shall review the Physical Security Design Manual for VA Facilities to determine and include any Mission Critical or Life Safety requirements called out. 4. For major new and renovation construction projects, outdoors (located on roof o
3、r grade) air-handling units are not permitted for the high-humidity locations, identified in Chapter 7. Outdoors air-handling units are also not permitted in the hurricane locations for the Mission Critical Facilities, identified in the Physical Security Manual. 5. For NRM (Non-Recurring Maintenance
4、) and minor construction projects, if outdoors air-handling units are permitted due to space constraints, the corrosion treatment specified below should be used for high-humidity locations. PART 1 - GENERAL 1.1 DESCRIPTION A. Roof top air handling units including integral components specified herein
5、. B. Definitions: Roof Top Air Handling Unit(Roof Top Units, RTU): A factory fabricated assembly consisting of fan, coils, filters, and other necessary equipment to perform one or more of the following functions of circulating, cleaning, heating, cooling, humidifying, dehumidifying, and mixing of ai
6、r. Design capacities of units shall be as scheduled on the drawings. 1.2 RELATED WORK /A. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Seismic restraints for equipment. / B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC: General mechanical requirements and items,
7、which are common to more than one section of Division 23. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 74 13 - 2 C. Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT: Sound and vibration requirements. D. Section
8、23 07 11, HVAC and BOILER PLANT INSULATION: Piping and duct insulation. E. Section 23 21 13, HYDRONIC PIPING and Section 23 22 13, STEAM and CONDENSATE HEATING PIPING: Piping and valves. F. Section 23 82 16, AIR COILS: Heating and cooling coils and pressure requirements. G. Section 23 34 00, HVAC FA
9、NS: Return and exhaust fans. H. Section 23 31 00, HVAC DUCTS and CASINGS: Requirements for flexible duct connectors, sound attenuators and sound absorbing duct lining. I. Section 23 40 00, HVAC AIR CLEANING DEVICES: Air filters and filters efficiency. J. Section 23 09 23, DIRECT-DIGITAL CONTROL SYST
10、EM FOR HVAC: HVAC controls. K. Section 23 05 93, TESTING, ADJUSTING, and BALANCING FOR HVAC: Testing, adjusting and balancing of air and water flows. L. Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC and STEAM GENERATION EQUIPMENT: Types of motors. M. Section 26 29 11, LOW-VOLTAGE MOTOR START
11、ERS: Types of motor starters. N. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS: O. Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training. 1.3 QUALITY ASSURANCE A. Refer to Article, Quality Assurance, in Section 23 05 11, COM
12、MON WORK RESULTS FOR HVAC. B. Air Handling Units Certification 1. Air Handling Units with Housed Centrifugal Fans: The air handling units shall be certified in accordance with AHRI 430 and tested/rated in accordance with AHRI 260. 2. Air Handling Units with Plenum Fans: a. Air Handling Units with a
13、single Plenum Fan shall be certified in accordance with AHRI 430 and tested/rated in accordance with AHRI 260. b. Air handling Units with Multiple Fans in an Array shall be tested and rated in accordance with AHRI 430 and AHRI 260. C. Heating, Cooling, and Air Handling Capacity and Performance Stand
14、ards: AHRI 430, AHRI 410, ASHRAE 51, and AMCA 210. D. Performance Criteria: 1. The fan BHP shall include all system effects for all fans and v-belt drive losses for housed centrifugal fans. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 74
15、13 - 3 2. The fan motor shall be selected within the rated nameplate capacity, without relying upon NEMA Standard Service Factor. 3. Select the fan operating point as follows: a. Forward Curve and Axial Flow Fans: Right hand side of peak pressure point. b. Air Foil, Backward Inclined, or Tubular Fan
16、s Including Plenum Fans: At or near the peak static efficiency but at an appropriate distance from the stall line. 4. Operating Limits: AMCA 99 and Manufacturers Recommendations. E. Units shall be factory-fabricated, assembled, and tested by a manufacturer, in business of manufacturing similar air-h
17、andling units for at least five (5) years. SPEC WRITERS NOTES: For larger projects involving more than five air handling units, the A/E shall select a few typical AHUs, in different configurations, for an initial submission. The suggested different configurations are: 1. 100 percent outside air AHUs
18、 with or without heat recovery coils. 2. Re-circulating type of variable air volume AHUs with minimum outside air and economizer cycle features. The remaining submission shall be received only after the initial submission is approved with satisfactory resolution of all comments made during the revie
19、w and approval process. 1.4 SUBMITTALS: A. The contractor shall, in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES, furnish a complete submission for all roof top units covered in the project. The submission shall include all information listed below. Partial and incomple
20、te submissions shall be rejected without reviews. B. Manufacturers Literature and Data: 1. Submittals for RTUs shall include fans, drives, motors, coils, / humidifiers, / sound attenuators /, mixing box with outside/return air dampers, filter housings, / blender sections /, and all other related acc
21、essories. The contractor shall provide custom drawings showing total air handling unit assembly including dimensions, operating weight, access sections, / diffusion plates /, flexible connections, door swings, controls penetrations, electrical disconnect, lights, duplex receptacles, switches, wiring
22、, utility connection points, unit support system, vibration isolators, drain Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-04-11 23 74 13 - 4 pan, pressure drops through each component (filter, coil etc) and rigging points. 2. Submittal drawings of
23、 section or component only, will not be acceptable. Contractor shall also submit performance data including performance test results, charts, curves or certified computer selection data; data sheets; fabrication and insulation details; if the unit cannot be shipped in one piece, the contractor shall
24、 indicate the number of pieces that each unit will have to be broken into to meet shipping and job site rigging requirements. This data shall be submitted in hard copies and in electronic version compatible to AutoCAD version used by the VA at the time of submission. 3. Submit sound power levels in
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2374132011PACKAGEDOUTDOORCENTRALSTATIONAIRHANDLINGUNITSPDF

链接地址:http://www.mydoc123.com/p-1074932.html