1、12-05M 21 12 00 - 1 SECTION 21 12 00 FIRE-SUPPRESSION STANDPIPES SPEC WRITER NOTES: 1. Delete between / - / if not applicable to the project. Also delete any other item or paragraph including NFPA references which are not applicable and renumber the paragraphs. 2. References to pressure in the secti
2、on are gage pressure unless otherwise noted. 3. Use Manual Dry Standpipe for unheated area of the building only. 4. The spec writer shall review the Physical Security Design Manual for VA Facilities to determine and include any Mission Critical or Life Safety requirements called out. PART 1 - GENERA
3、L 1.1 DESCRIPTION Fire-suppression wet / and / manual dry / standpipes. 1.2 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 14 except for specified exceptions. B. Design, materials, equipment and installation, inspection and testing of a complete and ready for oper
4、ation fire-suppression wet / and / manual dry / standpipe system as required by NFPA 14./ /C. Modification of the existing standpipe system as indicated on the drawings and as further required by these specifications. / /D. Expansion or revision of the building system fire alarm system to incorporat
5、e new system alarms and supervisory devises./ /E. Providing of access panels where control or drain valves are located behind plaster or gypsum walls or ceilings./ F. Painting of exposed piping and supports to match surrounding background in stairways and red in unfinished areas. 1.3 RELATED WORK A.
6、 Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Section 33 10 00, WATER UTILITIES. C. Section 07 84 00, FIRESTOPPING, Treatment of penetrations through rated enclosures. D. Section 08 31 13, ACCESS DOORS AND FRAMES: for access panels for plaster or gypsum finishes. E. Section 09 91 0
7、0, PAINTING. F. Section 21 10 00, WATER-BASED FIRE-SUPPRESSION SYSTEMS, for dry sprinklers, fire pumps, etc. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-12-05M 21 12 00 - 2 G. Section 28 31 00, FIRE DETECTION AND ALARM, Connection to fire alarm o
8、f flow switches, pressure switches and valve supervisory switches. H. Section 21 05 11 COMMON WORK RESULTS FOR FIRE SUPPRESSION for general mechanical requirements and items, which are common to more than one section. 1.4 QUALITY ASSURANCE A. Designers Qualifications: Design work and shop drawings s
9、hall be prepared by a licensed engineer practicing in the field of Fire Protection Engineering. SPEC WRITER NOTE: Most states do not have or issue fire standpipe contractors licenses. Therefore, as a minimum, the contractor must hold a contractors license in the state where the work is to be perform
10、ed. B. Installer Reliability: The installer shall possess a valid State of / (insert state in which work is being performed) / contractors license. The installer shall provide documentation of having successfully completed three projects of similar size and scope. C. Materials and Equipment: All equ
11、ipment and devices shall be of a make and type listed by UL and approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. D. Testing: Materials and Testing Certificate as per NFP
12、A 14. Provide certificates for all parts of the system. 1.5 DESIGN CRITERIA A. The design, materials, equipment, installation, and testing of the system shall be in accordance with NFPA 14 the latest edition. B. For hydraulic calculations, calculated demand shall not fall less than 10 percent below
13、the water supply curve. SPEC WRITER NOTE: The A/E shall verify in writing that the responding fire department has a pumper truck with a minimum rating of 3785 l/m (1000 gpm) at 1035 kPa (150 psig). Base design on the available water supply. B. Water Supply: Base water supply on a fire pumper truck b
14、eing able to provide 3785 l/m (1000 gpm) at 1035 kPa (150 psig) and 2650 l/m (700 gpm) at 1380 kPa (200 psig) at the fire department connection. SPEC WRITER NOTE: If the local fire department has fire attack procedures requiring 450 kPa (65 psig) at the hose connections, the design may be adjusted a
15、ccordingly with the written approval of the fire department. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-12-05M 21 12 00 - 3 C. Size standpipes to provide / 450 / 690 / kPa (/ 65 / 100 / psig) at the most remote connections. SPEC WRITER NOTE: Sei
16、smically support piping in zones when required by NFPA 14. /D. Provide seismic protection for all new and existing systems in accordance with zone _ as required by NFPA 14. Also comply with Section 21 05 11, Common Work Results for Fire Suppression for allowable seismic design. / 1.6 SUBMITTALS A. S
17、ubmit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are stamped by a Registered Professional Engineer practicing in the field of Fire Protection Engineering. As Government review is for technical adequacy only, th
18、e installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. / Partial submittals will not be accepted. / Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in n
19、otebooks or binders and provide index referencing the appropriate specification section. Submittals shall include, but not be limited to, the following: 1. Certificates: a. /Designers and/ Installers qualifications and documentation of previous work. b. Materials and Testing certificates as specifie
20、d. 2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to NFPA 14. Include a site plan showing the fire hydrant nearest the fire department connection. 3. Manufacturers Literature and Data Sheets: All pertinent literature and data for the materials and equipment
21、 proposed for the project. Include listing information and installation instructions in data sheets. Clearly identify the item to be used. a. For backflow preventers, provide flow test curves from UL, FM, or the Foundation for Hydraulic Research and Cross-Connection Control to verify pressure loss c
22、alculations. b. Provide for materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheet describes items in addition to that item being submitted, clearly identify proposed item on the sheet. Provided by IHSNot for
23、 ResaleNo reproduction or networking permitted without license from IHS-,-,-12-05M 21 12 00 - 4 4. Calculation Sheets: Submit hydraulic calculations in accordance with NFPA 14. 5. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requir
24、ements in Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Submittals shall include, but not be limited to, the following: a. One complete set of reproducible as-built drawings showing the installed system with the specific interconnections between the waterflow switch or pressure switch
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2112002005FIRESUPPRESSIONSTANDPIPESPDF