1、11-09 21 05 11 - 1 SECTION 21 05 11 COMMON WORK RESULTS FOR FIRE SUPPRESSION SPEC WRITER NOTE: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. References to pressure in this section are gage pre
2、ssure unless otherwise noted. 3. The spec writer shall review the Physical Security Design Manual for VA Facilities to determine and include any Mission Critical or Life Safety requirements called out. PART 1 - GENERAL 1.1 DESCRIPTION A. The requirements of this Section apply to all sections of Divi
3、sion 21. B. Definitions: 1. Exposed: Piping and equipment exposed to view in finished rooms. 2. Option or optional: Contractors choice of an alternate material or method. 1.2 RELATED WORK A. Section 01 00 00, GENERAL REQUIREMENTS. B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. C. Exc
4、avation and Backfill: Section 31 20 00, EARTH MOVING. D. Concrete and Grout: Section 03 30 00, CAST-IN-PLACE CONCRETE. E. Building Components for Attachment of Hangers: / Section 05 31 00, STEEL DECKING. / /Section 05 36 00, COMPOSITE METAL DECKING. / F. Section 05 50 00, METAL FABRICATIONS. G. Sect
5、ion 07 84 00, FIRESTOPPING. H. Flashing for Wall and Roof Penetrations: Section 07 60 00, FLASHING AND SHEET METAL. I. Section 07 92 00, JOINT SEALANTS. J. Section 09 91 00, PAINTING. K. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS L. Section 26 05 11, REQUIREMENTS
6、FOR ELECTRICAL INSTALLATIONS M. Section 21 05 12, GENERAL MOTOR REQUIREMENTS FOR FIRE-SUPPRESSION EQUIPMENT. N. Section 26 29 11, LOW-VOLTAGE MOTOR STARTERS. 1.3 QUALITY ASSURANCE A. Products Criteria: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
7、11-09 21 05 11 - 2 1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 3 years. See other specification sections for any exceptions. 2. Equipment Service: Products shall be supported by a serv
8、ice organization which maintains a complete inventory of repair parts and is located reasonably close to the site. 3. Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer. 4. Assembled Units: Manufa
9、cturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product. 5. Nameplates: Nameplate bearing manufacturers name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast
10、 integrally with equipment, stamped or otherwise permanently marked on each item of equipment. 6. Asbestos products or equipment or materials containing asbestos shall not be used. B. Manufacturers Recommendations: Where installation procedures or any part thereof are required to be in accordance wi
11、th the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the Resident Engineer prior to installation. Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish th
12、ese recommendations can be cause for rejection of the material. C. Guaranty: In GENERAL CONDITIONS. SPEC WRITER NOTE: VA circular 005-89-4 dated Aug. 21, 1989, does not allow extended guarantee period services for Controls and Instrumentation. Delete between / _/ unless authorized by VA General Coun
13、sel. /D. Extended Guarantee Period Services: 1. Qualifications: All service technicians assigned to perform work under this contract shall be qualified and factory trained by the Original Equipment Manufacturer (O.E.M.). Each technician shall have at least three years experience of working on compar
14、able systems and shall be a full time employee of the contractor. The contractor shall furnish, for the Department of Veterans Affairs (VA) review and approval, resumes of all service technicians scheduled to service the equipment and systems. The resume shall include details of Provided by IHSNot f
15、or ResaleNo reproduction or networking permitted without license from IHS-,-,-11-09 21 05 11 - 3 experience, training, and educational qualifications and performance evaluations. 2. Replacement Parts: The contractor shall be equipped with all replacement parts of all equipment and systems to be serv
16、iced and the manufacturers standard service and repair procedures. All replacement parts shall be brand new and of current design. The replacement parts shall be O.E.M. items. Obsolete or refurbished parts are unacceptable. “Approved Equal“ parts must have prior approval of the Contracting Officer.
17、Contractor shall furnish evidence of guaranteed supply of parts for the life of the system. 3. Service Supplies: The services shall include, without any additional cost to the government, all replacement parts, special tools and equipment, and consumable materials, that is, lubrication oil, grease,
18、and cleaning materials, as required. The requirement of UL listing, where applicable, shall not be voided by any replacement parts, components, software, or modifications provided by the contractor. 4. Scheduled and Emergency Call Service: The service shall include a scheduled monthly visit to perfo
19、rm systematic examination of equipment and/or systems and a 7 day, 24 hours call back service for emergency service. The emergency service is defined as a situation created by a breakdown or malfunction of any equipment or system warranting urgent attention. A qualified service representative shall
20、respond to the VA request for emergency service within two hours and assess the problem either by telephone or remote diagnostic capability. If the emergency situation cannot be rectified by the VA personnel, on site emergency service shall be provided by sending a qualified service representative w
21、ithin 24 hours. For the rural locations of the VA medical centers, situated over 200 miles from the contractors established service depot, the maximum response time of 48 hours shall be acceptable. The emergency service shall be limited to adjustments and repairs specifically required to protect the
22、 safety of the equipment for which the emergency service was required to be performed. 5. Licensing: The contractor shall be licensed to perform the contracted services. The contractor shall furnish details of all applicable local and state licensing requirements to VA as a part of the qualification
23、 requirements. The licenses shall be current, valid through the term of the contract and in the name of the contractor. 6. Documentation Requirements: The contractor shall maintain a separate log for each item of equipment and each system covered under the Provided by IHSNot for ResaleNo reproductio
24、n or networking permitted without license from IHS-,-,-11-09 21 05 11 - 4 extended guarantee period service contract with the VA Medical Center (VAMC) Engineering Service. The log shall list dates and times of all scheduled and emergency calls. Each emergency call shall be described with details of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2105112009COMMONWORKRESULTSFORFIRESUPPRESSIONPDF

链接地址:http://www.mydoc123.com/p-1074857.html