1、06-01-12 14 91 82 - 1 SECTION 14 91 82 TRASH CHUTES MODIFICATION 06-01-12 UPDATE OF STANDARDS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 14 91 82 - 2 SECTION 14 91 82 TRASH CHUTES SPEC WRITER NOTE: Use this spec section with caution. Ed
2、it spec to conform to latest publications before issuing on a specific project. SPEC WRITER NOTE: Delete between / _ / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. This section spe
3、cifies gravity trash chutes complete and ready for operation. B. Drawings and general provisions of Contract, including General, Supplemental and Special conditions and Division 01 Specification Sections, apply to this Section. 1.2 RELATED WORK A. Section 07 84 00, FIRESTOPPING. B. Section 07 60 00,
4、 FLASHING AND SHEET METAL. C. Section 21 10 00, WATER-BASED FIRE-SUPPRESSION SYSTEMS. D. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. E. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 1.3 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA
5、, AND SAMPLES. B. Complete layout drawings of system, including detail drawings of load stations, roof vent, discharge openings, riser anchoring and electrical riser. C. Shop Drawings of Fabricated Equipment and Manufacturers Literature and Data: Submit as one package: 1. Gravity Chute 2. Roof Vents
6、 3. Flushing Head/Ring 4. Gravity Chute Loading Stations 5. Discharge Openings with Automatic Fire Damper 6. Door Locks D. Manufacturers certificate stating that the loading and discharge doors and frames meet the requirements of Underwriters Laboratory, Inc. for the fire rating specified. Provided
7、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 14 91 82 - 3 1.4 QUALITY ASSURANCE A. Criteria: 1. Manufacturer regularly and presently manufacturers the item submitted as one of their principal products. 2. There is a permanent service organization
8、maintained or trained by the manufacturer which will render satisfactory service to this installation within eight (8) hours of receipt of notification that service is requested. 3. Installer, or supplier of a service, has technical qualifications, experience, and trained personnel and facilities to
9、 perform the specified work. A minimum of three (3) years of experience in the installation of gravity chutes. 4. Manufacturers system has been in satisfactory operation on two (2) installations similar to this system for at least two (2) years. Provide names of these facilities and contact informat
10、ion. B. Product Criteria: 1. Multiple Units: When two (2) or more units of the same type or class of materials or equipment are required, these units are products of one manufacturer. 2. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete resp
11、onsibility for the final assembled product. a. All components of an assembled unit need not be products of the same manufacturer, but component parts which are alike are the products of a single manufacturer. b. Components are compatible with each other and with the total assembly for the intended s
12、ervice. 3. Nameplates: Nameplate bearing manufacturers name or identifiable trademark securely affixed in a conspicuous place on equipment or name or trademark cast integrally with equipment, stamped, or otherwise permanently marked on each item of equipment. C. Design Criteria: 1. The information s
13、hown on the contract drawings is intended to establish basic requirements of the system. Within these limitations, the Contractor is responsible for the final design of the gravity chute and to make whatever modifications of, and additions to the drawings, as may be required to fulfill the performan
14、ce requirements. 2. Contractor is responsible for coordination of chute drawings and installation with all other building systems. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 14 91 82 - 4 3. Space Conditions: Contractor shall pay special
15、 attention to existing structure provided in prior phases of construction. D. Transport trash in plastic bags. E. Employee Instructions: Provide a qualified representative possessing complete knowledge of system and equipment to train employees in operation and maintenance of system. Training period
16、 shall be as follows: 1. Four (4) hours instructing maintenance personnel on the operation and maintenance of system. 2. In addition to verbal instruction, furnish written instructions in triplicate relative to care, adjustment, and operating of all parts of equipment in independently bound folders.
17、 Written instructions shall include complete, correct, and legible wiring diagrams, complete and comprehensive sequence of operations, complete parts lists with descriptive literature and identifications, diagrammatic cuts of equipment and parts. 1.5 MAINTENANCE SERVICE Furnish inspection and mainte
18、nance service on all chute equipment for a period of one (1) year after notification by Department of Veterans Affairs that system is turned over for beneficial use. This service shall consist of examination by competent trained and qualified mechanic; cleaning, oiling, greasing, adjustments and rep
19、lacement of any parts required to place equipment in proper working order, (except for parts requiring replacement due to improper use, accidents or operator negligence). Maintenance is to be preformed monthly. 1.6 WARRANTY A. All labor and materials furnished in connection with the Gravity chutes s
20、hall be subject to terms of “Warranty of Construction“ articles of FAR clause 52.246-21. Upon receipt of notice from the Government of any failure of any portion of materials or workmanship furnished, the failure shall be corrected at no additional cost to the government. B. No device will be accept
21、ed that will not give perfect satisfaction without excessive maintenance and attention. If it becomes evident during the warranty period that the equipment is not functioning properly, or in accordance with specification requirements, or, if in the opinion of the Contracting Officer excessive mainte
22、nance and attention must be employed to keep equipment operating, the Contractor shall remove equipment and install a new device meeting all requirements as part of the work until satisfactory operation on installation is obtained. Period of warranty shall start a new from date of completion of new
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA1491822012TRASHCHUTESPDF