1、11-11 11 82 19 - 1 SECTION 11 82 19 PACKAGED INCINERATORS SPEC WRITER NOTES: 1. Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable. Deleted paragraphs should be labeled “Omitted”. 2. It is extremely important that the composition and quantity of
2、 waste be accurately determined and specified. 3. Applicable emissions regulations must be carefully researched and specified. PART I - GENERAL 1.1 DESCRIPTION: Factory built, packaged, manual batch feed, pathological /and solid waste/ incinerator with burners, stack, controls, and accessories. 1.2
3、RELATED WORK: SPEC WRITER NOTE: Section 21 05 11, COMMON WORK RESULTS FOR FIRE SUPPRESSION, Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING, Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION, and Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT referen
4、ced below are intended for HVAC and plumbing. They must be revised to suit incinerator applications. A. Stack thimble and flashing: Section 07 60 00, FLASHING AND SHEET METAL. B. Stack painting: Section 09 91 00, PAINTING. C. Section 21 05 11, COMMON WORK RESULTS FOR FIRE SUPPRESSION, Section 22 05
5、11, COMMON WORK RESULTS FOR PLUMBING, and Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION. D. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT. E. Fuel piping: Section 22 05 19, METERS AND GAGES FOR PLUMBING PIPING, Section 22 05 23, GENERAL-DUTY VALVES
6、 FOR PLUMBING PIPING, Section 22 05 33, HEAT TRACING FOR PLUMBING PIPING, Section 22 11 00, FACILITY WATER DISTRIBUTION, Section 22 13 00, FACILITY SANITARY SEWERAGE, Section 22 13 23, SANITARY WASTE INTERCEPTORS, Section 22 14 00, FACILITY STORM DRAINAGE, Section 22 66 00, CHEMICAL-WASTE SYSTEMS FO
7、R LABORATORY AND HEALTHCARE FACILITIES, Section 23 11 23, FACILITY NATURAL-GAS PIPING, and Section 33 51 00, NATURAL-GAS DISTRIBUTION. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-11 11 82 19 - 2 1.3 QUALITY ASSURANCE: A. Coordinate the entire
8、assembly of incinerator, stack, controls, fuel supply. B. Provide written certification that the entire assembly has been coordinated to achieve the required performance and to provide the required features. C. Equipment, installation, and operation shall conform to NFPA 82. Where conflicts exist be
9、tween NFPA 82 and this specification, this specification shall govern. D. Provide written certification that the incinerator complies with permit to construct issued by _. 1.4 SUBMITTALS: A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Incinerator: 1. Arra
10、ngement, description of construction, and outline drawings of incinerator and accessories showing clearances and dimensions. 2. Predicted performance including burn time based on waste composition specified. 3. Calculation of secondary chamber retention time. 4. Piping and stack connection locations
11、 and sizes. 5. Technical data including temperature rating and arrangement of refractory and insulation. 6. Weights of unit and loading diagram of foundation. Evidence that contractor has coordinated support requirements with foundation design. 7. Recommended anchorage to foundation. / Seismic requi
12、rements apply. Submit calculations by professional engineer. Refer to Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. / 8. Predicted external surface temperatures. 9. Certified test report on performance of similar unit burning waste types (0, 1, 3, 4,and 6) which has
13、 composition similar to Article, PROJECT CONDITIONS, this specification: a. Overall burn time and weight reduction. b. Waste quantity and composition per batch. c. Emissions in all categories specified in PART 2. d. Auxiliary fuel use. 10. Catalog data on burners, sound attenuators, fuel trains, mot
14、ors. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-11 11 82 19 - 3 11. Fuel requirements: Flow rate, pressure at inlet to fuel train. 12. Full load power, efficiency, and power factor of all motors greater than one horsepower. 13. Electrical ser
15、vice requirements for all motors and controls. 14. Predicted sound level of all systems. 15. Schematic diagrams of control systems. Catalog cuts on components of control and instrument systems. Description of operation of control system. 16. Arrangement and location of control panels. C. Stack Syste
16、m: 1. Drawings showing system arrangement and dimensions. 2. Weights of subassemblies. 3. Design, construction, pressure and temperature limitations of entire system including expansion joints and dampers. 4. Support point locations and loads for entire system. 1.5 PROJECT CONDITIONS: A. Waste Mater
17、ial to be Incinerated Each Day: 1. Typical Day Number 1: a. General Waste: _ kg, _cubic meters (_pounds, _cubic feet). b. Pathological Waste: _ kg, _cubic meters (_pounds, _cubic feet). SPEC WRITER NOTE: Some manufacturers recommend only one batch per 24 hour day. c. Daily Feeding Schedule: / One ba
18、tch in one eight hour shift each day. / One batch in each of two eight hour shifts each day. / Two batches in one eight hour shift per day. / 2. Typical Day Number 2: a. General Waste: _ kg, _cubic meters, (_pounds, _cubic feet). b. Pathological Waste: _ kg, _cubic meters (_pounds, _cubic feet). c.
19、Daily Feeding Schedule: / One batch in one eight hour shift each day. / One batch in each of two eight hour shifts each day. / Two batches in one eight hour shift per day. / 3. Waste Composition by Weight: SPEC WRITER NOTE: The following waste material composition is given as an Provided by IHSNot f
20、or ResaleNo reproduction or networking permitted without license from IHS-,-,-11-11 11 82 19 - 4 example. Revise as necessary to suit the project conditions. a. General Waste: Solid waste, 65 percent Type 0, 20 percent plastic (including PVC), and 15 percent Type 4. b. Pathological Waste: 95 percent
21、 Type 4, 5 percent plastic. B. Auxiliary Fuel: / Natural gas: Furnished by local utility. High heating value _MJ/cubic meter (_ BTU per cubic foot) at gas company flow metering base pressure and temperature. Pressure at inlet to burner-mounted regulator _ kPag (_psig) minimum, _ kPag (_psig) maximum
22、. / / Fuel oil: Furnished under Government contract. Number 2 burner fuel. / / Liquified Petroleum Gas (LPG): Furnished under Government contract. High heating value _MJ/cubic meter (_ BTU/cubic foot) (propane) at standard conditions (100 kPag, 15.5 degrees C)(14.7 psig, 60 degrees F). Pressure at i
23、nlet to burner - mounted pressure regulator _kPag (_PSIG) maximum. / 1.6 DEFINITIONS: A. Type 0 Waste: Trash, rated 19.8 MJ/kg (8500 BTU per pound). A mixture of highly combustible waste such as paper, cardboard and wood. Contains up to 10 percent by weight of petrochemical waste, 10 percent moistur
24、e, and 5 percent non-combustible solids. B. Type 1 Waste: Rubbish, rated 15.1 MJ/kg (6800 BTU per pound). Combustible waste paper, cartons, rags, wood scraps, floor sweepings. Contains up to 25 percent moisture and up to 10 percent non-combustible solids. C. Type 3 Waste: Garbage, rated 5.8 MJ/kg (2
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA1182192011PACKAGEDINCINERATORSPDF