1、10-11 08 63 00 - 1 SECTION 08 63 00 METAL-FRAMED SKYLIGHTS SPEC WRITER NOTE: Delete between /_/ if not applicable to project. Also delete any other item or Article not applicable in Section and renumber paragraph. PART 1 GENERAL 1.1 DESCRIPTION: Section specifies field erected aluminum framed skylig
2、hts. 1.2 RELATED WORK: A. Field installed joint sealants in connection with metal framed skylights: Section 07 92 00, JOINT SEALANTS. B. Glazing: Section 08 80 00, GLAZING. C. Finish Color: Section 09 06 00, SCHEDULE FOR FINISHES. 1.3 QUALITY ASSURANCE: A. Qualifications: 1. Approval is required of
3、products or service of proposed manufacturer, suppliers and installers, and will be based upon submission by Contractor of certification that: a. Manufacturers Qualifications: Manufacturer with five years continuous documented experience in / design / and / fabrication / and / installation / of meta
4、l framed skylights of type and size required for that project. b. Installer Qualifications: An experienced installer with five years continuous documented experience who has specialized in installing metal-framed skylights similar to those indicated for this Project and who is acceptable in writing
5、to manufacturer. c. Manufacturers product submitted has been in satisfactory and efficient use on minimum of three installations similar and equivalent to this project for past three years. d. Testing Agency Qualifications: ISO 9000 Refer to Performance Requirements and Field Quality Control article
6、s for testing requirements. e. Product Options: Information on Drawings and in Specifications establishes requirements for aesthetic effects and performance characteristics of metal-framed skylights. Aesthetic effects are indicated by dimensions, Provided by IHSNot for ResaleNo reproduction or netwo
7、rking permitted without license from IHS-,-,-10-11 08 63 00 - 2 arrangements, alignment, and profiles of components and assemblies as they relate to sightlines, one another, and adjoining construction. Performance characteristics are indicated by criteria subject to verification by one or more metho
8、ds including preconstruction testing, field testing, or in-service performance: 1) Do not modify intended aesthetic effects. If modifications are proposed, submit comprehensive explanatory data for review. f. Welding: Welding shall be performed by certified welders qualified in accordance with AWS D
9、1.2, using procedures, materials and equipment of the type required for this work. SPEC WRITER NOTE: Delete this Article if project size does not warrant a pre-installation conference. /F. Pre-Installation Conference: / / 1. Prior to starting installation of skylight system schedule conference with
10、Contracting Officer to ensure (1) a clear understanding of drawings and specifications; (2) onsite inspection and acceptance of structural and pertinent structural details relating to skylight system; and (3) coordination of work of various trades involved in providing related work. Conference shall
11、 be attended by Contractor; personnel directly responsible for installation of skylight system, flashing and sheet metal work and skylight manufacturer. Conflicts shall be resolved and confirmed in writing. / 1.4 SUBMITTALS: SPEC WRITER NOTE: List below items intended for use in project, necessary f
12、or review prior to manufacture. Refer to Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES for submittal requirements. Include additional submittal requirements for items specified. A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Provided by IHSNot for Resa
13、leNo reproduction or networking permitted without license from IHS-,-,-10-11 08 63 00 - 3 B. Manufacturers Literature and Product Data: 1. Manufacturers standard details and fabrication methods. 2. Data on finishing, components, and accessories. 3. Instructions: Submit detail specifications and inst
14、ructions for installation, and adjustments. 4. Recommendations for maintenance and cleaning of exterior surfaces. C. Shop Drawings: Show elevations of skylights at 1:50 (1/4 inch) scale, metal gages, details of construction, methods of anchorage, glazing details, and details of installation. 1.5 DEL
15、IVERY, STORAGE, AND HANDLING: A. Refer to AAMA CW 10 for care and handling of architectural aluminum from shop to site. B. Inspect materials delivered to site for damage. Unload and store with minimum handling. Provide storage space in dry location with adequate ventilation, free from dust or water,
16、 and easily accessible for inspection and handling. Stack materials on non-absorptive strips or wood platforms. Do not cover frames with tarps, polyethylene film, or similar coverings. Protect finished surfaces during shipping and handling using manufacturers standard method, except that no coatings
17、 or lacquers shall be applied to surfaces to which caulking and glazing compounds must adhere. 1.6 PROJECT CONDITIONS: Field Measurements: Where metal-framed skylights are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication and ind
18、icate measurements on Shop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying Work. 1.7 APPLICABLE PUBLICATIONS: A. Publications listed below form a part of this specification to extent referenced. Publications are referred to in text by basic designation only. B.
19、 American Architectural Manufacturers Association (AAMA): 501-05 . Methods of Test for Exterior Walls 503-08 . Field Testing of Metal Storefronts, Curtain walls and Sloped Glazing Systems Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 08 63 00
20、 - 4 2605-11 Superior Performing Organic Coatings on Architectural Aluminum Extrusions and Panels CW 10-04 . Curtain Wall Manual No. 10 Care and Handling of Architectural Aluminum from Shop to Site CW 13-85 . Curtain Wall Manual #13 Structural Sealant Glazing Systems C. American Society for Testing
21、and Materials (ASTM): A36/A36M-08 Carbon Structural Steel A123/A123M-09 Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products A193/A193M-10 Alloy-Steel and Stainless Steel Bolting Materials for High Temperature Service A307-10 Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength B209-07
22、 Aluminum and Aluminum-Alloy Sheet and Plate B211/B211M-03 Aluminum-Alloy Bar, Rod and Wire B221/B221M-08 Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes B316/B316M-10 Specification for Aluminum and Aluminum-Alloy Rivet and Cold-Heading Wire and Rods C864-05 Dense Elastomeri
23、c Compression Seal Gaskets, Setting Blocks and Spacers C920-11 Elastomeric Joint Sealants E283-04 Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen E330-02(R2010) . Structural Performance of Exterior Windows, C
24、urtain Walls and Doors by Uniform Static Air Pressure Difference E331-00(R2009) . Water Penetration of Exterior Windows, Curtain Walls, and Doors by Uniform Static Air Pressure Difference Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 08 63 00
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0863002011METALFRAMEDSKYLIGHTSPDF