1、10-08M 04 05 31 - 1 SECTION 04 05 31 MASONRY TUCK POINTING SPEC WRITER NOTES: Delete between /_/if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for tu
2、ck pointing of existing masonry / and stone work /. 1.2 RELATED WORK Mortars: Section 04 05 13, MASONRY MORTARING. 1.3 APPLICABLE PUBLICATIONS A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in the text by basic designation only. B. Am
3、erican Society for Testing and Materials (ASTM): C67-07. Brick and Structural Clay Tile, Sampling and Testing C216-07 Facing Brick (Solid Masonry Units Made From Clay or Shale) C270-07 Mortar for Unit Masonry C. International Masonry Institute: Recommended Practices and Guide Specifications for Cold
4、 Weather Masonry Construction. PART 2 - PRODUCTS SPEC WRITER NOTE: Make product requirements agree with applicable requirements specified in the referenced Applicable Publications. Update and specify in both, only that which applies to the project. 2.1 TUCK POINTING MORTAR As per appendix X3 of ASTM
5、 C270. 2.2 REPLACEMENT MASONRY UNITS A. Face Brick: 1. ASTM C216, Grade SW, Type FBS. Brick shall be classified slightly efflorescent or better when tested in accordance with ASTM C67. 2. Face brick shall match facing brick of the existing building(s) that is being tuck pointed. B. Other Units to ma
6、tch existing. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-08M 04 05 31 - 2 PART 3 - EXECUTION 3.1 CUT OUT OF EXISTING MORTAR JOINTS A. Cut out existing mortar joints (both bed and head joints) and remove by means of a toothing chisel or a spec
7、ial pointers grinder, to a uniform depth of to 19 mm (3/4-inch), or until sound mortar is reached. Take care to not damage edges of existing masonry units to remain. B. Remove dust and debris from the joints by brushing, blowing with air or rinsing with water. Do not rinse when temperature is below
8、freezing. 3.2 JOB CONDITIONS A. Protection: Protect newly pointed joints from rain, until pointed joints are sufficiently hard enough to prevent damage. B. Cold Weather Protection: 1. Tuck pointing may be performed in freezing weather when methods of protection are utilized. 2. Comply with applicabl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0405312008MASONRYTUCKPOINTINGPDF