VA 03 45 00-2011 PRECAST ARCHITECTURAL CONCRETE.pdf
《VA 03 45 00-2011 PRECAST ARCHITECTURAL CONCRETE.pdf》由会员分享,可在线阅读,更多相关《VA 03 45 00-2011 PRECAST ARCHITECTURAL CONCRETE.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、09-11 03 45 00 - 1 SECTION 03 45 00 PRECAST ARCHITECTURAL CONCRETE SPEC WRITER NOTE: Delete between / _/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section includes the perform
2、ance criteria, materials, production, and erection of architectural precast concrete cladding / and load bearing / units. The work performed under this section includes all labor, material, equipment, related services, and supervision required for the manufacture and erection of the architectural pr
3、ecast concrete work shown on the contract drawings. 1.2 RELATED WORK A. Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY SERVICES. B. Concrete: Section 03 30 00, CAST-IN-PLACE CONCRETE. C. Precast pre-stressed structural building elements: Section 03 41 33,
4、PRECAST STRUCTURAL PRETENSIONED CONCRETE. D. Mortar: Section 04 05 13, MASONRY MORTARING/ Section 04 05 16, MASONRY GROUTING / E. Masonry Facing: Section 04 20 00, UNIT MASONRY. F. Cast Stone Facing: Section 04 72 00, CAST STONE MASONRY. G. Insulation for Insulated Panels: Section 07 21 13, THERMAL
5、INSULATION. H. Sealants and Caulking: Section 07 92 00, JOINT SEALANTS. I. Size, type and color of aggregate for exposed aggregate finish and matrix color: Section 09 06 00, SCHEDULE FOR FINISHES. J. Ceramic Tile Facing: Section 09 30 13, CERAMIC TILING. K. Repair of abraded galvanized and painted s
6、urfaces: Section 09 91 00, PAINTING. 1.3 QUALITY ASSURANCE A. Fabricator Qualifications: A firm that complies with PCI MNL 117 and the following requirements and is experienced in producing units similar to those indicated for this Project and with a record of successful in-service performance: 1. /
7、 Assumes responsibility for engineering units to comply with performance requirements. A Comprehensive Engineering Analysis shall be performed by a qualified professional engineer who is legally qualified Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
8、-,-09-11 03 45 00 - 2 to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. / 2. Participates in PCIs Plant Certification program at the time of bidding and is designated a PCI-certified plant for Group A, Category A1- Ar
9、chitectural Cladding and Load Bearing Units. 3. Has sufficient production capacity to produce required units without delaying the work. B. Erector Qualifications: 1. A precast concrete erector Qualified by the Precast/Prestressed Concrete Institute (PCI) prior to beginning work at the project site.
10、Submit a current Certificate of Compliance furnished by PCI designating qualification in / Category A (Architectural Systems) for non-load-bearing members / Category S2 (Complex Structural Systems) for load-bearing members /. 2. / An erector with a minimum of 2 years of experience who has completed
11、architectural precast concrete work similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance and who meets the following requirements: / a. / Retains a PCI Certified Field Auditor, at ere
12、ctors expense, to conduct a field audit of a project in the same category as this Project prior to start of erection. Submits Erectors Post Audit Declaration. / b. / The basis of the audit is the PCI MNL 127. / C. Quality-Control Standard: For manufacturing procedures and testing requirements, quali
13、ty-control recommendations, and dimensional tolerances for types of units required, comply with PCI MNL 117. D. Sample Panels: After sample approval and before fabricating units, produce a minimum of two sample panels approximately / 1.5 sq. m. (16 sq. ft.) / in size for review by Resident Engineer.
14、 Incorporate full scale details of architectural features, finishes, textures, and transitions in the sample panels. Approved sample panel may be used for mockup and range sample. 1. Locate panels where indicated or, if not indicated, as directed by Resident Engineer. 2. Damage part of an exposed-fa
15、ce surface for each finish, color, and texture, and demonstrate adequacy of repair techniques proposed for repair of surface blemishes. 3. After acceptance of repair technique, maintain one sample panel at the manufacturers plant and one at the project site in an undisturbed condition as a standard
16、for judging the completed work. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-11 03 45 00 - 3 4. When back face of precast concrete unit is to be exposed, show samples of the workmanship, color, and texture of the backup concrete as well as the
17、facing. 5. Demolish and remove sample panels only when directed. E. Range Samples: After sample panel approval and before production of units, produce a minimum of three samples, approximately / 1.5 sq. m. (16 sq. ft.) / in size, representing anticipated range of color and texture on projects units.
18、 Following range sample acceptance by the Resident Engineer, maintain samples at the manufacturers plant as color and texture acceptability reference. F. Mockups: After sample approval but before production of units, construct full sized mockups to verify selections made under sample Submittals and
19、to demonstrate aesthetic effects and qualities of materials and execution. Mockup to be representative of the finished work in all respects including glass, aluminum framing, sealants and architectural precast concrete complete with all anchors, connections, flashings, and joint fillers as accepted
20、on the final shop drawings. Build mockups to comply with the following requirements, using materials indicated for the completed work: 1. Build mockups in the location and of the size indicated or, if not indicated, as directed by Resident Engineer. 2. Notify Resident Engineer in advance of dates an
21、d times when mockups will be constructed. 3. Obtain Resident Engineers approval of mockups before starting fabrication. 4. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work. 5. Demolish and remove mockups when directed. G. Preinstallation C
22、onference: Conduct conference at Project site to comply with requirements in Division 01, GENERAL REQUIREMENTS. 1.4 PERFORMANCE REQUIREMENTS A. Structural Performance: Provide units and connections capable of withstanding: the design criteria specified on the drawings, self weights and weights of ma
23、terials supported or attached, for the conditions indicated. 1. Design Standards: Comply with ACI 318 (ACI 318M) and the design recommendations of PCI MNL 120, applicable to types of units indicated. 2. Limit deflection of precast members as follows: Vertical live load Span / 360. Wind load Floor to
24、 floor height times 0.0025. 3. Design for handling, transportation and erection stresses. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-11 03 45 00 - 4 4. / Parking Garage Vehicular Impact Loads: Design spandrel units acting as vehicular barrier
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0345002011PRECASTARCHITECTURALCONCRETEPDF

链接地址:http://www.mydoc123.com/p-1074680.html