VA 01 91 00-2011 GENERAL COMMISSIONING REQUIREMENTS.pdf
《VA 01 91 00-2011 GENERAL COMMISSIONING REQUIREMENTS.pdf》由会员分享,可在线阅读,更多相关《VA 01 91 00-2011 GENERAL COMMISSIONING REQUIREMENTS.pdf(61页珍藏版)》请在麦多课文档分享上搜索。
1、05-11 01 91 00 - 1 SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS shall form the basis of the construction phase commissioning process and procedures. The Commissioning Agent shall add, modify, and refi
2、ne the commissioning procedures, as approved by the Department of Veterans Affairs (VA), to suit field conditions and actual manufacturers equipment, incorporate test data and procedure results, and provide detailed scheduling for all commissioning tasks. B. Various sections of the project specifica
3、tions require equipment startup, testing, and adjusting services. Requirements for startup, testing, and adjusting services specified in the Division 7, Division 21, Division 22, Division 23, Division 26, Division 27, Division 28, and Division 31 series sections of these specifications are intended
4、to be provided in coordination with the commissioning services and are not intended to duplicate services. The Contractor shall coordinate the work required by individual specification sections with the commissioning services requirements specified herein. C. Where individual testing, adjusting, or
5、related services are required in the project specifications and not specifically required by this commissioning requirements specification, the specified services shall be provided and copies of documentation, as required by those specifications shall be submitted to the VA and the Commissioning Age
6、nt to be indexed for future reference. D. Where training or educational services for VA are required and specified in other sections of the specifications, including but not limited to Division 7, Division 8, Division 21, Division 22, Division 23, Division 26, Division 27, Division 28, and Division
7、31 series sections of the specification, these services are intended to be provided in addition to the training and educational services specified herein. E. Commissioning is a systematic process of verifying that the building systems perform interactively according to the construction documents and
8、 the VAs operational needs. The commissioning process shall encompass and coordinate the system documentation, equipment startup, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 01 91 00 - 2 control system calibration, testing and balancing, pe
9、rformance testing and training. Commissioning during the construction, and post-occupancy phases is intended to achieve the following specific objectives according to the contract documents: 1. Verify that the applicable equipment and systems are installed in accordance with the contact documents an
10、d according to the manufacturers recommendations. 2. Verify and document proper integrated performance of equipment and systems. 3. Verify that Operations operation and maintenance Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 01 91 00 - 15 t
11、raining sessions; TAB Work; Pre-Functional Checklists, Systems Functional Performance Testing; and project completion. E. Convene commissioning team meetings for the purpose of coordination, communication, and conflict resolution; discuss status of the commissioning processes. Responsibilities inclu
12、de arranging for facilities, preparing agenda and attendance lists, and notifying participants. The Commissioning Agent shall prepare and distribute minutes to commissioning team members and attendees within five workdays of the commissioning meeting. F. Observe construction and report progress, obs
13、ervations and issues. Observe systems and equipment installation for adequate accessibility for maintenance and component replacement or repair, and for general conformance with the Construction Documents. G. Prepare Project specific Pre-Functional Checklists and Systems Functional Performance Test
14、procedures. H. Coordinate Systems Functional Performance Testing schedule with the Contractor. I. Witness selected systems startups. J. Verify selected Pre-Functional Checklists completed and submitted by the Contractor. K. Witness and document Systems Functional Performance Testing. L. Compile test
15、 data, inspection reports, and certificates and include them in the systems manual and commissioning report. Spec Writers Note: Coordinate the specification reference in Para J below with the specific project spec section dealing with O compromises; variances with the Contract Documents; record of c
16、onditions; and, if appropriate, recommendations for resolution. Design Narrative documentation maintained by the Commissioning Agent. 2. Commissioning plan. 3. Pre-Functional Checklists completed by the Contractor, with annotation of the Commissioning Agent review and spot check. 4. Systems Function
17、al Performance Test Procedures, with annotation of test results and test completion. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 01 91 00 - 20 5. Commissioning Issues Log. 6. Listing of deferred and off season test(s) not performed, includi
18、ng the schedule for their completion. I. Addendum to Final Commissioning Report: The Commissioning Agent will prepare an Addendum to the Final Commissioning Report near the end of the Warranty Period. The Addendum will indicate whether systems, subsystems, and equipment are complete and continue to
19、perform according to the Contract Documents. The Addendum to the Final Commissioning Report shall include, but is not limited to, the following: 1. Documentation of deferred and off season test(s) results. 2. Completed Systems Functional Performance Test Procedures for off season test(s). 3. Documen
20、tation that unresolved system performance issues have been resolved. 4. Updated Commissioning Issues Log, including status of unresolved issues. 5. Identification of potential Warranty Claims to be corrected by the Contractor. J. Systems Manual: The Commissioning Agent will gather required informati
21、on and compile the Systems Manual. The Systems Manual will include, but is not limited to, the following: 1. Design Narrative, including system narratives, schematics, single-line diagrams, flow diagrams, equipment schedules, and changes made throughout the Project. 2. Reference to Final Commissioni
22、ng Plan. 3. Reference to Final Commissioning Report. 4. Approved Operation and Maintenance Data as submitted by the Contractor. 1.12 SUBMITTALS A. Preliminary Commissioning Plan Submittal: The Commissioning Agent has prepared a Preliminary Commissioning Plan based on the final Construction Documents
23、. The Preliminary Commissioning Plan is included as an Appendix to this specification section. The Preliminary Commissioning Plan is provided for information only. It contains preliminary information about the following commissioning activities: 1. The Commissioning Team: A list of commissioning tea
24、m members by organization. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 01 91 00 - 21 2. Systems to be commissioned. A detailed list of systems to be commissioned for the project. This list also provides preliminary information on systems/eq
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0191002011GENERALCOMMISSIONINGREQUIREMENTSPDF

链接地址:http://www.mydoc123.com/p-1074663.html