VA 01 74 19-2012 CONSTRUCTION WASTE MANAGEMENT.pdf
《VA 01 74 19-2012 CONSTRUCTION WASTE MANAGEMENT.pdf》由会员分享,可在线阅读,更多相关《VA 01 74 19-2012 CONSTRUCTION WASTE MANAGEMENT.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、06-01-12 01 74 19 - 1 SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT MODIFICATION 06-01-12 CONTENT REVISED IN REFERENCE TO REQUIREMENT FOR RECYCLING OF CONSTRUCTION AND DEMOLITION WASTE. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 01 74
2、19 - 2 SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT PART 1 GENERAL 1.1 DESCRIPTION A. This section specifies the requirements for the management of non-hazardous building construction and demolition waste. B. Waste disposal in landfills shall be minimized to the greatest extent possible. Of the in
3、evitable waste that is generated, as much of the waste material as economically feasible shall be salvaged, recycled or reused. C. Contractor shall use all reasonable means to divert construction and demolition waste from landfills and incinerators, and facilitate their salvage and recycle not limit
4、ed to the following: 1. Waste Management Plan development and implementation. 2. Techniques to minimize waste generation. 3. Sorting and separating of waste materials. 4. Salvage of existing materials and items for reuse or resale. 5. Recycling of materials that cannot be reused or sold. D. At a min
5、imum the following waste categories shall be diverted from landfills: 1. Soil. 2. Inerts (eg, concrete, masonry and asphalt). 3. Clean dimensional wood and palette wood. 4. Green waste (biodegradable landscaping materials). 5. Engineered wood products (plywood, particle board and I-joists, etc). 6.
6、Metal products (eg, steel, wire, beverage containers, copper, etc). 7. Cardboard, paper and packaging. 8. Bitumen roofing materials. 9. Plastics (eg, ABS, PVC). 10. Carpet and/or pad. 11. Gypsum board. 12. Insulation. 13. Paint. 14. Fluorescent lamps. 1.2 RELATED WORK A. Section 02 41 00, DEMOLITION
7、. B. Section 01 00 00, GENERAL REQUIREMENTS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 01 74 19 - 3 C. Lead Paint: Section 02 83 33.13, LEAD BASED PAINT REMOVAL AND DISPOSAL. 1.3 QUALITY ASSURANCE A. Contractor shall practice efficient
8、 waste management when sizing, cutting and installing building products. Processes shall be employed to ensure the generation of as little waste as possible. Construction /Demolition waste includes products of the following: 1. Excess or unusable construction materials. 2. Packaging used for constru
9、ction products. 3. Poor planning and/or layout. 4. Construction error. 5. Over ordering. 6. Weather damage. 7. Contamination. 8. Mishandling. 9. Breakage. B. Establish and maintain the management of non-hazardous building construction and demolition waste set forth herein. Conduct a site assessment
10、to estimate the types of materials that will be generated by demolition and construction. C. Contractor shall develop and implement procedures to recycle construction and demolition waste to a minimum of 50 percent. D. Contractor shall be responsible for implementation of any special programs involv
11、ing rebates or similar incentives related to recycling. Any revenues or savings obtained from salvage or recycling shall accrue to the contractor. E. Contractor shall provide all demolition, removal and legal disposal of materials. Contractor shall ensure that facilities used for recycling, reuse an
12、d disposal shall be permitted for the intended use to the extent required by local, state, federal regulations. The Whole Building Design Guide website http:/www.cwm.wbdg.org provides a Construction Waste Management Database that contains information on companies that haul, collect, and process recy
13、clable debris from construction projects. F. Contractor shall assign a specific area to facilitate separation of materials for reuse, salvage, recycling, and return. Such areas are to be kept neat and clean and clearly marked in order to avoid contamination or mixing of materials. Provided by IHSNot
14、 for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 01 74 19 - 4 G. Contractor shall provide on-site instructions and supervision of separation, handling, salvaging, recycling, reuse and return methods to be used by all parties during waste generating stages. H.
15、Record on daily reports any problems in complying with laws, regulations and ordinances with corrective action taken. 1.4 TERMINOLOGY A. Class III Landfill: A landfill that accepts non-hazardous resources such as household, commercial and industrial waste resulting from construction, remodeling, rep
16、air and demolition operations. B. Clean: Untreated and unpainted; uncontaminated with adhesives, oils, solvents, mastics and like products. C. Construction and Demolition Waste: Includes all non-hazardous resources resulting from construction, remodeling, alterations, repair and demolition operation
17、s. D. Dismantle: The process of parting out a building in such a way as to preserve the usefulness of its materials and components. E. Disposal: Acceptance of solid wastes at a legally operating facility for the purpose of land filling (includes Class III landfills and inert fills). F. Inert Backfil
18、l Site: A location, other than inert fill or other disposal facility, to which inert materials are taken for the purpose of filling an excavation, shoring or other soil engineering operation. G. Inert Fill: A facility that can legally accept inert waste, such as asphalt and concrete exclusively for
19、the purpose of disposal. H. Inert Solids/Inert Waste: Non-liquid solid resources including, but not limited to, soil and concrete that does not contain hazardous waste or soluble pollutants at concentrations in excess of water-quality objectives established by a regional water board, and does not co
20、ntain significant quantities of decomposable solid resources. I. Mixed Debris: Loads that include commingled recyclable and non-recyclable materials generated at the construction site. J. Mixed Debris Recycling Facility: A solid resource processing facility that accepts loads of mixed construction a
21、nd demolition debris for the purpose of recovering re-usable and recyclable materials and disposing non-recyclable materials. K. Permitted Waste Hauler: A company that holds a valid permit to collect and transport solid wastes from individuals or businesses for the purpose of recycling or disposal.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0174192012CONSTRUCTIONWASTEMANAGEMENTPDF