1、03-01-12 01 33 23 - 1 SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SPEC WRITER NOTE: Delete between /- / if not applicable to project. Also delete any other item or paragraph not applicable in the sections and renumber the paragraphs. 1-1. Refer to Articles titled SPECIFICATIONS AND DRA
2、WINGS FOR CONSTRUCTION (FAR 52.236-21) and, SPECIAL NOTES (VAAR 852.236-91), in GENERAL CONDITIONS. 1-2. For the purposes of this contract, samples / (including laboratory samples to be tested) /, test reports, certificates, and manufacturers literature and data shall also be subject to the previous
3、ly referenced requirements. The following text refers to all items collectively as SUBMITTALS. 1-3. Submit for approval, all of the items specifically mentioned under the separate sections of the specification, with information sufficient to evidence full compliance with contract requirements. Mater
4、ials, fabricated articles and the like to be installed in permanent work shall equal those of approved submittals. After an item has been approved, no change in brand or make will be permitted unless: A. Satisfactory written evidence is presented to, and approved by Contracting Officer, that manufac
5、turer cannot make scheduled delivery of approved item or; B. Item delivered has been rejected and substitution of a suitable item is an urgent necessity or; C. Other conditions become apparent which indicates approval of such substitute item to be in best interest of the Government. 1-4. Forward sub
6、mittals in sufficient time to permit proper consideration and approval action by Government. Time submission to assure adequate lead time for procurement of contract - required items. Delays attributable to untimely and rejected submittals / (including any laboratory samples to be tested) / will not
7、 serve as a basis for extending contract time for completion. 1-5. Submittals will be reviewed for compliance with contract requirements by Architect-Engineer, and action thereon will be taken by Resident Engineer on behalf of the Contracting Officer. 1-6. Upon receipt of submittals, Architect-Engin
8、eer will assign a file number thereto. Contractor, in any subsequent correspondence, shall refer to Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-03-01-12 01 33 23 - 2 this file and identification number to expedite replies relative to previously a
9、pproved or disapproved submittals. 1-7. The Government reserves the right to require additional submittals, whether or not particularly mentioned in this contract. If additional submittals beyond those required by the contract are furnished pursuant to request therefor by Contracting Officer, adjust
10、ment in contract price and time will be made in accordance with Articles titled CHANGES (FAR 52.243-4) and CHANGES - SUPPLEMENT (VAAR 852.236-88) of the GENERAL CONDITIONS. 1-8. Schedules called for in specifications and shown on shop drawings shall be submitted for use and information of Department
11、 of Veterans Affairs and Architect-Engineer. However, the Contractor shall assume responsibility for coordinating and verifying schedules. The Contracting Officer and Architect- Engineer assumes no responsibility for checking schedules or layout drawings for exact sizes, exact numbers and detailed p
12、ositioning of items. 1-9. Submittals must be submitted by Contractor only and shipped prepaid. Contracting Officer assumes no responsibility for checking quantities or exact numbers included in such submittals. A. /Submit samples required by Section 09 06 00, SCHEDULE FOR FINISHES, in quadruplicate.
13、 / Submit / other / samples in single units unless otherwise specified. Submit shop drawings, schedules, manufacturers literature and data, and certificates in quadruplicate, except where a greater number is specified. B. Submittals will receive consideration only when covered by a transmittal lette
14、r signed by Contractor. Letter shall be sent via first class mail /FAX / and shall contain the list of items, name of / Medical Center / Cemetery /, name of Contractor, contract number, applicable specification paragraph numbers, applicable drawing numbers (and other information required for exact i
15、dentification of location for each item), manufacturer and brand, ASTM or Federal Specification Number (if any) and such additional information as may be required by specifications for particular item being furnished. In addition, catalogs shall be marked to indicate specific items submitted for app
16、roval. 1. A copy of letter must be enclosed with items, and any items received without identification letter will be considered “unclaimed goods“ and held for a limited time only. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-03-01-12 01 33 23 - 3
17、2. Each sample, certificate, manufacturers literature and data shall be labeled to indicate the name and location of the / Medical Center / Cemetery /, name of Contractor, manufacturer, brand, contract number and ASTM or Federal Specification Number as applicable and location(s) on project. 3. Requi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0133232012SHOPDRAWINGSPRODUCTDATAANDSAMPLESPDF

链接地址:http://www.mydoc123.com/p-1074656.html