1、3-11 01 32 16.13 - 1 SECTION 01 32 16.13 NETWORK ANALYSIS SCHEDULES SPEC WRITER NOTES: 1. Coordinate this section with the paragraphs of FAR 52.232, VAAR 852.236 and Section 01 00 00, GENERAL REQUIREMENTS. Specifically Article, FAR 52.232 5 (PAYMENTS UNDER FIXED-PRICE CONSTRUCTION), Article, VAAR 85
2、2.236 - 83(PAYMENTS UNDER FIXED-PRICE CONSTRUCTION),and Article, OPERATIONS AND STORAGE AREAS, Paragraph “Phasing“ in the Section 01 00 00, GENERAL REQUIREMENTS. 2. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the
3、 paragraphs. PART 1- GENERAL 1.1 DESCRIPTION: A. The Contractor shall develop a Network Analysis System (NAS) plan and schedule demonstrating fulfillment of the contract requirements, shall keep the network up-to-date in accordance with the requirements of this section and shall utilize the plan for
4、 scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) Precedence Diagramming Method (PDM) technique will be utilized to satisfy both time and cost applications. All sche
5、dule data and reports required under this specification section shall be based upon regular total float, not relative total float schedules. 1.2 CONTRACTORS REPRESENTATIVE: A. The Contractor shall designate an authorized representative in the firm who will be responsible for the preparation of the n
6、etwork diagram, review and report progress of the project with and to the Contracting Officers representative. B. The Contractors representative shall have direct project control and complete authority to act on behalf of the Contractor in fulfilling the requirements of this specification section an
7、d such authority shall not be interrupted throughout the duration of the project. SPEC WRITER NOTE: In paragraphs 1.3, A; 1.3,B, and 1.3,C; (i) applies to competitively bid projects, (ii) applies Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3-11 0
8、1 32 16.13 - 2 to 8(a) projects and (iii) applies to RFP solicitations. Edit as required. 1.3 CONTRACTORS CONSULTANT: A. To prepare the network diagram, and compact disk(s), which reflects the Contractors project plan, the Contractor shall engage an independent CPM consultant who is skilled in the t
9、ime and cost application of scheduling using (PDM) network techniques for construction projects, the cost of which is included in the Contractors bid. This consultant shall not have any financial or business ties to the Contractor, and shall not be an affiliate or subsidiary company of the Contracto
10、r, and shall not be employed by an affiliate or subsidiary company of the Contractor. B. / (i) Prior to engaging a consultant, and within 10 calendar days after award of the contract, / (ii) With the initial cost proposal, / (iii) With the initial response to the RFP / the Contractor shall submit to
11、 the Contracting Officer: 1. The name and address of the proposed consultant. 2. Sufficient information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph. 3. A list of prior construction projects, along with selected PDM network
12、 diagram samples on current projects which the proposed consultant has performed complete project scheduling services. These network diagram samples must show complete project planning for a project of similar size and scope as covered under this contract. C. The Contracting Officer has the right to
13、 approve or disapprove employment of the proposed consultant, and will notify the Contractor of the VA decision within seven calendar days from receipt of information. In case of disapproval, the Contractor shall resubmit another consultant within 10 calendar days for renewed consideration. The Cont
14、ractor must have their CPM Consultant approved prior to / (i) submitting any diagram, (ii) completion of contract negotiations, (iii) submission of their best and final offer./ 1.4 COMPUTER PRODUCED SCHEDULES A. The contractor shall provide to the VA, Senior Resident Engineer and CPM Schedule Analys
15、t, monthly computer processing of all computer-produced time/cost schedules and reports generated from monthly project updates. This monthly computer service will include: three copies of up Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3-11 01 32
16、16.13 - 3 to five different reports (inclusive of all pages) available within the user defined reports of Primavera (P3 or P6) to the contracting officers representative; a hard copy listing of all project schedule changes, and associated data, made at the update and an electronic file of this data
17、in Primavera (P3 or P6) batch format; and the resulting monthly updated schedule in a compressed electronic file in Primavera (P3 or P6), (PDM) format. These must be submitted with and substantively support the contractors monthly payment request and the signed lookahead report. The resident enginee
18、r shall identify the five different report formats that the contractor shall provide based upon the monthly schedule updates. B. The contractor is responsible for the correctness and timeliness of the computer-produced reports. The Contractor is also responsible for the accurate and timely submittal
19、 of the updated project schedule and all CPM data necessary to produce the computer reports and payment request that is specified. C. The VA shall report errors in computer-produced reports to the Contractors representative within ten calendar days from receipt of reports. The Contractor will reproc
20、ess the computer-produced reports and associated compact disk(s), when requested by the Contracting Officers representative, to correct errors which affect the payment and schedule for the project. 1.5 THE COMPLETE PROJECT NETWORK DIAGRAM SUBMITTAL A. Within 45 calendar days (60 calendar days on pro
21、jects over $50,000,000) after receipt of Notice to Proceed, the Contractor shall submit for the Contracting Officers review; three blue line copies of the complete network diagram on sheets of paper 765 x 1070 mm (30 x 42 inches) and an electronic file in a compressed Primavera (P3 or P6), (PDM) for
22、mat. The submittal shall also include three copies of a computer-produced activity/event ID schedule showing project duration; phase completion dates; and other data, including event cost. Each activity/event on the computer-produced schedule shall contain as a minimum, but not limited to, activity/
23、event ID, duration, predecessor and successor relationships, trade code, area code, description, budget amount, early start date, early finish date, late start date, late finish date and total float. Work activity/event relationships shall be restricted to finish-to-start and start-to-start without
24、lead or lag constraints. The lead or lag for the SS relationships may only be allowed in limited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3-11 01 32 16.13 - 4 basis if justified in writing and must be approved by the Contracting Officer. Activ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA013216132011NETWORKANALYSISSCHEDULESPDF