1、06-11 i SECTION 01 00 00 GENERAL REQUIREMENTS TABLE OF CONTENTS 1.1 GENERAL INTENTION 1 1.2 STATEMENT OF BID ITEM(S) . 2 1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR 3 1.4 CONSTRUCTION SECURITY REQUIREMENTS . 3 1.5 FIRE SAFETY 5 1.6 OPERATIONS AND STORAGE AREAS 8 1.7 ALTERATIONS 14 1.8 INFECTION P
2、REVENTION MEASURES . 16 1.9 DISPOSAL AND RETENTION 19 1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS 20 1.11 RESTORATION 21 1.12 PHYSICAL DATA . 22 1.13 PROFESSIONAL SURVEYING SERVICES 23 1.14 LAYOUT OF WORK . 23 1.15 AS-BUILT DRAWINGS 25 1.16 USE OF ROADW
3、AYS 25 1.17 RESIDENT ENGINEERS FIELD OFFICE 26 1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT 29 1.19 TEMPORARY USE OF EXISTING ELEVATORS 30 1.20 TEMPORARY USE OF NEW ELEVATORS 31 1.21 TEMPORARY TOILETS 32 1.22 AVAILABILITY AND USE OF UTILITY SERVICES 33 1.23 NEW TELEPHONE EQUIPMENT . 34
4、1.24 TESTS 35 1.25 INSTRUCTIONS 35 1.26 GOVERNMENT-FURNISHED PROPERTY . 36 1.27 RELOCATED / EQUIPMENT / ITEMS / . 37 1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT 38 1.29 CONSTRUCTION SIGN 39 1.30 SAFETY SIGN 39 1.31 PHOTOGRAPHIC DOCUMENTATION 40 1.32 FINAL ELEVATION Digital Images
5、 433 1.33 HISTORIC PRESERVATION 444 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-11 01 00 00 -1 SECTION 01 00 00 GENERAL REQUIREMENTS SPEC WRITER NOTES: 1. Delete between / - /if not applicable to project. Include following Notice on 8a contrac
6、ts only. 2. /NOTICE: The provisions of this Section, GENERAL REQUIREMENTS, pertain only to the contract between the Small Business Administration and its selected subcontractor(s)./ 3. Verify identification requirements for all construction workers required by the medical center. ADD a statement con
7、cerning Photo ID requirements. 1.1 GENERAL INTENTION A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for _ _ as required by drawings and specifications. SPEC WRITER NOTE: Fo
8、llowing paragraph is applicable for construction at existing hospitals. B. Visits to the site by Bidders may be made only by appointment with the /Medical Center Engineering Officer./ Cemetery Director/. SPEC WRITER NOTE: Include following paragraph only on A/E projects. C. Offices of _, as Architec
9、t-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized represe
10、ntative. SPEC WRITER NOTE: The following paragraph is intended for use on Central Office projects and A/E projects where certain tests are to be performed by a VA retained Testing Laboratory. D. Before placement and installation of work subject to tests by testing laboratory retained by Department o
11、f Veterans Affairs, the Contractor shall notify the Resident Engineer in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise
12、 designated by the Resident Engineer. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-11 01 00 00 -2 E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police,
13、 be identified by project and employer, and restricted from unauthorized access. F. Prior to commencing work, general contractor shall provide proof that a OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors ar
14、e present. SPEC WRITER NOTE: The length of training is based on the project hazards and complexity, State and Federal regulations and VA requirements. G. Training: 1. All employees of general contractor or subcontractors shall have the /10-hour/ /30-hour/ OSHA certified Construction Safety course an
15、d /or other relevant competency training, as determined by VA CP with input from the ICRA team. 2. Submit training records of all such employees for approval before the start of work. SPEC WRITER NOTES: 1. In paragraph below change title, “GENERAL CONSTRUCTION“ as necessary to reflect project title,
16、 such as A/C, Sewers, etc. 2. Unit-price items will only be used when their use is directed by the Project Manager. When using unit-price items, insert FAR clause 52.212-11 in the contract specifications. 1.2 STATEMENT OF BID ITEM(S) A. ITEM I, /GENERAL CONSTRUCTION:/ _:/ Work includes general const
17、ruction, alterations, roads, walks, grading, drainage, mechanical and electrical work, laboratory equipment, utility systems, elevators and dumbwaiters, water storage facilities, /_/ necessary removal of existing structures and construction and certain other items. SPEC WRITER NOTE: If prices are ne
18、eded for Alternate Bid Items, describe Alternate Items below and show items on SOLICITATION, OFFER AND AWARD (SF 1442). COORDINATE with Project Manager. B. ALTERNATE NO.1: _ _ C. ALTERNATE NO. 2:_ _ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-
19、11 01 00 00 -3 SPEC WRITER NOTES: 1. Fill in blank space below with number of sets determined necessary for each project. Minimum of 15 sets. Sets required shall be generally as follows: Station Projects - 15 sets; CFM Projects up to one Million Dollars - 25 sets; CFM Projects above one Million Doll
20、ars - 35 sets; Air Conditioning Projects - 35 sets; New Hospitals - 80 sets. 2. Delete within /-/ when project is 8a contract. 1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR A. AFTER AWARD OF CONTRACT, _ sets of specifications and drawings will be furnished. / These drawings and specifications will
21、consist of those returned by prospective bidders. / B. Additional sets of drawings may be made by the Contractor, at Contractors expense, from reproducible sepia prints furnished by Issuing Office. Such sepia prints shall be returned to the Issuing Office immediately after printing is completed. SPE
22、C WRITER NOTE: Modify following article to suit the project. Coordinate with Medical Center. 1.4 CONSTRUCTION SECURITY REQUIREMENTS A. Security Plan: 1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. 2
23、. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. B. Security Procedures: 1. General Contractors employees shall not enter the project site without appropriate badge. They may also be subject t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0100002011GENERALREQUIREMENTSPDF