1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULDecember 21, 20061SUBJECT 2119OUTLINE OF INVESTIGATIONFORPROTECTIVE SHIELDING GUARDS FOR PLUMBINGIssue Number: 2December 21, 2006Summary of TopicsThis new issue of SU 2119 is being issued through
2、 ULs electronicpublishing system to ensure format uniformity between the PDF andHTML versions of the document. No substantive changes have beenincorporated in the document.The UL Foreword is no longer located within the UL Standard. For informationconcerning the use and application of the requiremen
3、ts contained in thisStandard, the current version of the UL Foreword is located onULStandardsInfoNet at: http:/ 2006 UNDERWRITERS LABORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULDECEMBER 21, 2006SUBJECT 21192No Text on This Pa
4、geUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONTENTSINTRODUCTION1 Scope .42 Units of Measurements 43 Glossary .4PERFORMANCE4 Sharp Edge Test 45 Temperature Test .76 Securement Test 77 Mold Stress Test 78 Impact Test 8MARKING9 General .10
5、DECEMBER 21, 2006 SUBJECT 2119 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULINTRODUCTION1 Scope1.1 These requirements cover plumbing products intended to meet the applicable parts of ANSI/CABOA117.1-1992, Accessible and Usable Buildings an
6、d Facilities and the Code of Federal Regulations No. 36,Appendix A to Part 1191-Americans With Disabilities Act (ADA), as of July 1, 1995, Article 4.19.4 of theAmerican with Disabilities Act.1.2 A product that contains features, characteristics, components, materials, or systems new or differentfrom
7、 those covered by the requirements in this Outline of Investigation, and that involve a risk of fire,electric shock, or injury to persons shall be evaluated using the appropriate requirements are required tomaintain the level of safety as originally anticipated by the intent of this Outline of Inves
8、tigation. A productwhose features, characteristics, components, materials, or systems conflict with specific requirements orprovisions of this Outline of Investigation is not judged to comply with this Outline of Investigation. Whereappropriate, revision of requirements are proposed and adopted in c
9、onformance with the methodsemployed for development, revision, and implementation of this Outline of Investigation.2 Units of Measurements2.1 When a value for measurement is followed by a value in other units in parentheses, the first statedvalue is the requirement.3 Glossary3.1 For the purpose of t
10、his Outline of Investigation, the following definition applies.3.2 Thermoprotection The condition that exists when the thermal transfer of heat or cold has beeninsulated and external temperature of the product has been evaluated.PERFORMANCE4 Sharp Edge Test4.1 Any edges which are able to be contacte
11、d after installation shall be evaluated by 4.2 4.6.4.2 The application of the sharp-edge tester shown in Figure 4.1 or 4.2 to an accessible edge asdescribed in 4.3 4.7 shall not result in the cutting through of the two outer layers of the sensing tapes.This is generated text for figtxt.DECEMBER 21,
12、2006SUBJECT 21194UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULFigure 4.1Preparation of headFigure 4.2Test procedureDECEMBER 21, 2006 SUBJECT 2119 5UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMIS
13、SION FROM UL4.3 The curved face of the tester head shall be covered with three layers of tape in the order indicatedbelow:a) First Layer (Inner Layer) Indicating type, black vinyl foam tape.b) Second Layer (Middle Layer) Sensing Tape No. 2, white vinyl foam tape.c) Third Layer (Outer Layer) Sensing
14、Tape No. 1, tetrafluorethylene tape.4.4 Each tape is to be applied over 180 degrees of the circumference of the test head to preventstretching of the tape.4.5 The tapes are not to be stretched when positioned on the head. See Figure 4.1.4.6 The center of the tape-covered head of the sharp-edge teste
15、r is to be positioned on the edge to betested in the manner illustrated in Figure 4.2. The arm of the tester is to be between stops so that thetape-covered head exerts a 1-1/2 lbf (6.7 N) on the edge. The tester is to be immediately moved alongthe edge a distance of 2 inches (50.8 mm) and then back
16、to its starting position without removal of thetester from the edge. It then is to be withdrawn from the edge. The total distance of engagement betweenthe edge and the tape-covered head is not to exceed 4 inches (101 mm). The time of travel is not to takelonger than 5 seconds nor less than 2 seconds
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT21192006OUTLINEOFINVESTIGATIONFORPROTECTIVESHIELDINGGUARDSFORPLUMBINGISSUE2 管道工程 防护罩 调查 大纲 发布

链接地址:http://www.mydoc123.com/p-1069230.html