UL 2111 CRD-2008 UL Standard for Safety Overheating Protection for Motors - Section Paragraph Reference 7 8 9 14 15 16 Subject Power Interruption During Locked Rotor Tests on Impe.pdf
《UL 2111 CRD-2008 UL Standard for Safety Overheating Protection for Motors - Section Paragraph Reference 7 8 9 14 15 16 Subject Power Interruption During Locked Rotor Tests on Impe.pdf》由会员分享,可在线阅读,更多相关《UL 2111 CRD-2008 UL Standard for Safety Overheating Protection for Motors - Section Paragraph Reference 7 8 9 14 15 16 Subject Power Interruption During Locked Rotor Tests on Impe.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULUNDERWRITERS LABORATORIES CERTIFICATION REQUIREMENT DECISIONThis Certification Requirement Decision is prepared and published by Underwriters Laboratories (UL). Itis normative for the applicable
2、UL Product Certification Program(s); however, it is currently not part ofthe UL Standard(s) referenced below.Product Category (CCN): XEWR, XEIT, XDNW, XDAMStandard Number: UL 2111Edition Date: March 28, 1997Edition Number: 1Section / Paragraph Reference: 7, 8, 9, 14, 15, 16Subject: Power Interruptio
3、n During Locked Rotor Tests on Impedance ProtectedMotors and Motors Containing Automatic Reset Thermal Motor Protectors (TMP)DECISION:Recently, the question was raised, “What is the process to be followed if, due to utility problems, a lockedrotor test is interrupted?”As we know, what is commonly ca
4、lled the Locked Rotor Test is really a combination of two tests: the Locked Rotor Temperature Test (LRTT) 72 Hours and the Locked Rotor Endurance Test (LRET) 15 daysLRTT Interruption of the LRTT for impedance protected motors and motors provided with automaticreset protectors is not permitted (see U
5、L 2111, 7.4 and 14.2.1).LRET Since the LRET is a 15-day test, it is possible (and in some areas of the world, even likely) thatpower to the motor will be interrupted during the 15 days.Consider that, the LRET is really a time and temperature stress on the insulating materials, a stress teston the mo
6、vable parts of the automatic reset protector and a test of the freedom from welding of thecontacts of the automatic reset protector. In each case, the effects are cumulative. In fact, interrupting theLRET represents a somewhat more severe situation for the following reasons:1. The mass of the motor
7、is allowed to cool, all of the materials and components contract andwhen the test is restarted, the materials and components again expand. The cumulative effectsof the time and temperature on the materials are the same but now the added stress of theslight shifting and abrasion that occurs due to th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UL2111CRD2008ULSTANDARDFORSAFETYOVERHEATINGPROTECTIONFORMOTORSSECTIONPARAGRAPHREFERENCE789141516SUBJECTPOWERINTERRUPTIONDURINGLOCKEDROTORTESTSONIMPEPDF

链接地址:http://www.mydoc123.com/p-1067805.html