UL 2106-2006 UL Standard for Safety Field Erected Boiler Assemblies (Second Edition Reprint with Revisions Through and Including March 9 2015)《室外安装的锅炉组合装置》.pdf
《UL 2106-2006 UL Standard for Safety Field Erected Boiler Assemblies (Second Edition Reprint with Revisions Through and Including March 9 2015)《室外安装的锅炉组合装置》.pdf》由会员分享,可在线阅读,更多相关《UL 2106-2006 UL Standard for Safety Field Erected Boiler Assemblies (Second Edition Reprint with Revisions Through and Including March 9 2015)《室外安装的锅炉组合装置》.pdf(72页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL 2106 Field Erected Boiler AssembliesUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM ULUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTH
2、ER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL Standard for Safety for Field Erected Boiler Assemblies, UL 2106 Second Edition, Dated April 18, 2006 Summary of Topics This revision to UL 2106 is being issued to remove the reference to the withdrawal date of UL 873 and to address unive
3、rsal upkeep of UL Standards for Safety. These revisions are considered to be non-substantive and not subject to ULs STP process. Text that has been changed in any manner or impacted by ULs electronic publishing system is marked with a vertical line in the margin. Changes in requirements are marked w
4、ith a vertical line in the margin and are followed by an effective date note indicating the date of publication or the date on which the changed requirement becomes effective. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form
5、 by any means, electronic, mechanical photocopying, recording, or otherwise without prior permission of UL. UL provides this Standard as is without warranty of any kind, either expressed or implied, including but not limited to, the implied warranties of merchantability or tness for any purpose. In
6、no event will UL be liable for any special, incidental, consequential, indirect or similar damages, including loss of prots, lost savings, loss of data, or any other damages arising out of the use of or the inability to use this Standard, even if UL or an authorized UL representative has been advise
7、d of the possibility of such damage. In no event shall ULs liability for any damage ever exceed the price paid for this Standard, regardless of the form of the claim. Users of the electronic versions of ULs Standards for Safety agree to defend, indemnify, and hold UL harmless from and against any lo
8、ss, expense, liability, damage, claim, or judgment (including reasonable attorneys fees) resulting from any error or deviation introduced while purchaser is storing an electronic Standard on the purchasers computer system. The requirements in this Standard are now in effect, except for those paragra
9、phs, sections, tables, gures, and/or other elements of the Standard having future effective dates as indicated in the note following the affected item. The prior text for requirements that have been revised and that have a future effective date are located after the Standard, and are preceded by a S
10、UPERSEDED REQUIREMENTS notice. MARCH 9, 2015 UL 2106 tr1UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL MARCH 9, 2015 UL 2106 tr2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PER
11、MISSION FROM UL APRIL 18, 2006 (Title Page Reprinted: March 9, 2015) 1 UL 2106 Standard for Field Erected Boiler Assemblies First Edition October, 1994 Second Edition April 18, 2006 This UL Standard for Safety consists of the Second edition including revisions through March 9, 2015. Comments or prop
12、osals for revisions on any part of the Standard may be submitted to UL at any time. Proposals should be submitted via a Proposal Request in ULs On-Line Collaborative Standards Development System (CSDS) at http:/. ULs Standards for Safety are copyrighted by UL. Neither a printed nor electronic copy o
13、f a Standard should be altered in any way. All of ULs Standards and all copyrights, ownerships, and rights regarding those Standards shall remain the sole and exclusive property of UL. COPYRIGHT 2015 UNDERWRITERS LABORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DIS
14、TRIBUTION WITHOUT PERMISSION FROM UL APRIL 18, 2006 FIELD ERECTED BOILER ASSEMBLIES - UL 2106 2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL CONTENTS INTRODUCTION 1 Scope .5 2 General 6 2.1 Terminology .6 2.2 Units of
15、measurement .6 3 Glossary .6 4 Components 9 CONSTRUCTION MECHANICAL 5 Assembly .10 5.1 General 10 5.2 Moving parts 11 6 Servicing 12 7 Casing 13 8 Radiation Shields or Liners 13 9 Combustion Chamber 14 10 Baffles.14 11 Flue Collar .14 12 Damper and Draft Regulator .14 13 Installation of External Con
16、trols and Fittings 15 14 Field Wiring System Connection 16 CONSTRUCTION ELECTRICAL 15 Controls .16 15.1 Application 16 15.2 Limit control .17 15.3 Primary safety control .18 15.4 Liquid level limit controls 18 15.5 Temperature limit controls .19 15.6 Purge and combustion air monitoring controls .19
17、16 Field Wiring 19 16.1 General .19 16.2 Leads and terminals 21 17 Internal Wiring 23 17.1 General .23 17.2 Methods 23 17.3 Short-circuit protection 26 18 Separation of Circuits .27 19 Bonding for Grounding 28 20 Servicing and Adjustment 31 21 Electrical Components .32 22 Mounting of Electrical Comp
18、onents .32 23 Electrical Enclosures 33 23.1 General .33 23.2 Doors and covers 36 24 Motors and Motor Overload Protection 37 25 Overcurrent Protection of High-Voltage Control-Circuit Conductors 42 APRIL 18, 2006 FIELD ERECTED BOILER ASSEMBLIES - UL 2106 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FUR
19、THER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL 25.1 General .42 25.2 Direct-connected high-voltage control circuit .42 25.3 Tapped high-voltage control circuits 42 25.4 Overcurrent-protective devices .43 26 Overcurrent Protection of Transformers 44 26.1 High-voltage transformers .44 26
20、.2 Low-voltage transformers 45 27 Switches and Controllers 46 28 Capacitors .46 29 Electrical Insulating Material 47 30 Spacings High-Voltage Circuits .47 31 Spacings Low-Voltage Circuits 49 32 Accessibility of Uninsulated Live Parts and Film-Coated Wire 49 32.1 General .49 32.2 Boilers having an in
21、put in excess of 400,000 Btu/h .52 32.3 Boilers having an input of 400,000 Btu/h or less .55 PERFORMANCE 33 General 58 34 Dielectric Voltage-Withstand Test .59 MANUFACTURING AND PRODUCTION TESTS 35 General 59 MARKING 36 General 60 INSTRUCTIONS 37 Operating and Installation Instructions .63 APPENDIX
22、A Standards for ComponentsA1 APRIL 18, 2006 FIELD ERECTED BOILER ASSEMBLIES - UL 2106 4UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL INTRODUCTION 1 Scope 1.1 These requirements apply to eld assembled boiler assemblies that are provided wit
23、h or are intended for installation with single fuel-gas, single fuel-oil, or combination gas-oil burning equipment. 1.2 These requirements apply to fuel burning equipment which require ame failure and other safeguards and which are intended primarily for commercial and industrial installation. 1.3 E
24、quipment covered by these requirements may be operated without a competent attendant being constantly on duty at the equipment while the burners are in operation. 1.4 The appliance shall be suitable for installation in accordance with the Standards for Installation of Oil-Burning Equipment, NFPA 31,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UL21062006ULSTANDARDFORSAFETYFIELDERECTEDBOILERASSEMBLIESSECONDEDITIONREPRINTWITHREVISIONSTHROUGHANDINCLUDINGMARCH92015

链接地址:http://www.mydoc123.com/p-1067802.html