UL 1256-2002 UL Standard for Safety Fire Test of Roof Deck Constructions (Fourth Edition Reprint with Revisions Through and Including August 10 2018)《屋顶板结构的防火试验》.pdf
《UL 1256-2002 UL Standard for Safety Fire Test of Roof Deck Constructions (Fourth Edition Reprint with Revisions Through and Including August 10 2018)《屋顶板结构的防火试验》.pdf》由会员分享,可在线阅读,更多相关《UL 1256-2002 UL Standard for Safety Fire Test of Roof Deck Constructions (Fourth Edition Reprint with Revisions Through and Including August 10 2018)《屋顶板结构的防火试验》.pdf(34页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL 1256 Fire Test of Roof Deck ConstructionsUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM ULUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR
2、FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL Standard for Safety for Fire Test of Roof Deck Constructions, UL 1256 Fourth Edition, Dated October 31, 2002 Summary of Topics Revision pages dated July 17, 2013 were issued to incorporate the following changes in requirements: Clari
3、cation of 1.5 Regarding the Development of the Conditions of Acceptance Clarication of 15.2 that Melting Thermal Plastic Insulation is Not Prohibited Text that has been changed in any manner or impacted by ULs electronic publishing system is marked with a vertical line in the margin. Changes in requ
4、irements are marked with a vertical line in the margin and are followed by an effective date note indicating the date of publication or the date on which the changed requirement becomes effective. The revised requirements are substantially in accordance with Proposal(s) on this subject dated July 20
5、, 2012. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form by any means, electronic, mechanical photocopying, recording, or otherwise without prior permission of UL. UL provides this Standard as is without warranty of any kind
6、, either expressed or implied, including but not limited to, the implied warranties of merchantability or tness for any purpose. In no event will UL be liable for any special, incidental, consequential, indirect or similar damages, including loss of prots, lost savings, loss of data, or any other da
7、mages arising out of the use of or the inability to use this Standard, even if UL or an authorized UL representative has been advised of the possibility of such damage. In no event shall ULs liability for any damage ever exceed the price paid for this Standard, regardless of the form of the claim. U
8、sers of the electronic versions of ULs Standards for Safety agree to defend, indemnify, and hold UL harmless from and against any loss, expense, liability, damage, claim, or judgment (including reasonable attorneys fees) resulting from any error or deviation introduced while purchaser is storing an
9、electronic Standard on the purchasers computer system. The requirements in this Standard are now in effect, except for those paragraphs, sections, tables, gures, and/or other elements of the Standard having future effective dates as indicated in the note following the affected item. The prior text f
10、or requirements that have been revised and that have a future effective date are located after the Standard, and are preceded by a SUPERSEDED REQUIREMENTS notice. JULY 17, 2013 UL 1256 tr1UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL JULY
11、17, 2013 UL 1256 tr2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL OCTOBER 31, 2002 (Title Page Reprinted: July 17, 2013) HISTORICAL NOTE In August, 1953 the General Motors thirty-ve acre Hydro-Matic factory at Livonia,
12、 Michigan was destroyed by re. Unprotected steel construction and the thin steel deck which permitted the asphalt built-up roof covering to melt, drip through joints, and thereby contribute to re spread within the building was one of the factors cited as being responsible for the extent of the loss.
13、 As a means to analyze the potential for contribution of roof covering materials to re spread within a building, a 20 by 100 foot test structure was constructed. This analysis consisted of a series of ve large scale re tests utilizing different roof deck constructions, one of which represented the r
14、oof deck construction used in the General Motors factory. Based upon these large scale re tests, a roof deck construction evaluated for the purpose of establishing limits for underdeck re spread consisted of a steel roof deck, without vapor retarder or adhesive, insulated with 1-inch thick plain veg
15、etable berboard mechanically attached and covered with a 4-ply asphalt built-up roof covering with gravel surfacing. Based on the time and expense associated with conducting the large scale re test described in Part I of this Standard, UL investigated the use of a small scale re test method to corre
16、late the results of the small scale re test to the results of the large scale re test method. The small scale re test method developed from this correlation utilized the Steiner tunnel test chamber described in Part II of this Standard. Since the severity of the re exposure in the large scale re tes
17、t method introduces performance factors which cannot always be measured effectively in the small scale re test method described in Part II, subsequent large scale re tests are conducted by UL on specic new types of roof deck constructions which are judged to require additional datum tests. 1 UL 1256
18、 Standard for Fire Test of Roof Deck Constructions First Edition January, 1985 Second Edition August, 1993 Third Edition March, 1998 Fourth Edition October 31, 2002 This ANSI/UL Standard for Safety consists of the Fourth edition, including revisions through July 17, 2013. The most recent designation
19、 of ANSI/UL 1256 as an American National Standard (ANSI) occurred on July 17, 2013. ANSI approval for a standard does not include the Cover Page, Transmittal Pages, Title Page, or effective date information. ANSI/UL 1256-2013UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBU
20、TION WITHOUT PERMISSION FROM UL The Department of Defense (DoD) has adopted UL 1256 on August 19, 1989. The publication of revised pages or a new edition of this Standard will not invalidate the DoD adoption. Comments or proposals for revisions on any part of the Standard may be submitted to UL at a
21、ny time. Proposals should be submitted via a Proposal Request in ULs On-Line Collaborative Standards Development System (CSDS) at http:/. ULs Standards for Safety are copyrighted by UL. Neither a printed nor electronic copy of a Standard should be altered in any way. All of ULs Standards and all cop
22、yrights, ownerships, and rights regarding those Standards shall remain the sole and exclusive property of UL. COPYRIGHT 2013 UNDERWRITERS LABORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL CONTENTS INTRODUCTION 1 Scope .5 2 Gen
23、eral 6 2.1 Units of measurement .6 2.2 Undated references .6 PART I LARGE SCALE FIRE TEST METHOD FOR EVALUATION OF ROOF DECK CONSTRUCTIONS UNDER INTERIOR FIRE EXPOSURE 3 Test Method 6 4 Fire Test Structure 6 5 Fire Control Equipment 8 6 Instrumentation 12 7 Documentation 13 8 Test Procedure 13 9 Con
24、ditions of Acceptance .14 10 Test Report 15 PART II SMALL SCALE FIRE TEST METHOD UTILIZING STEINER FIRE TEST CHAMBER 11 Fire Test Chamber 15 12 Calibration of Test Equipment 19 13 Test Method .24 14 Test Assembly .25 15 Conditions of Acceptance 28 16 Test Report 29 JULY 17, 2013 FIRE TEST OF ROOF DE
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UL12562002ULSTANDARDFORSAFETYFIRETESTOFROOFDECKCONSTRUCTIONSFOURTHEDITIONREPRINTWITHREVISIONSTHROUGHANDINCLUDINGAUGUST102018

链接地址:http://www.mydoc123.com/p-1067400.html