《UFC 4-211-02NF CHANGE 4-2010 CORROSION CONTROL AND PAINT FINISHING HANGARS [Superseded NAVY MIL-HDBK-1028 1 C CANC NOTICE 1 NAVY MIL-HDBK-1028 1 C NAVY MIL-HDBK-1028 1 B NAVY MIL-HVY .pdf》由会员分享,可在线阅读,更多相关《UFC 4-211-02NF CHANGE 4-2010 CORROSION CONTROL AND PAINT FINISHING HANGARS [Superseded NAVY MIL-HDBK-1028 1 C CANC NOTICE 1 NAVY MIL-HDBK-1028 1 C NAVY MIL-HDBK-1028 1 B NAVY MIL-HVY .pdf(66页珍藏版)》请在麦多课文档分享上搜索。
1、UFC 4-211-02NF 10 January 2005 Including Change 4, 1 April 2010 UNIFIED FACILITIES CRITERIA (UFC) CORROSION CONTROL AND PAINT FINISHING HANGARS APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 4-
2、211-02NF 10 January 2005 Including Change 4, 1 April 2010 UNIFIED FACILITIES CRITERIA (UFC) CORROSION CONTROL AND PAINT FINISHING HANGARS Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of t
3、he copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by 2 . /2/) Change No. Date Location 1 25 May 2005 Paragraph 2-5.3 2 1 March 2007 Added chapter 4. 3 12 April 2
4、007 4 Deleted Change 2 addition to paragraph 1-1. 1 April 2010 Added Air Force requirements, updated lighting requirement, added clean room requirement; changed document number from 4-211-02N to 4-211-02NF This UFC supersedes, in part, MIL-HDBK-1028/1C, dated April 1999. Provided by IHSNot for Resal
5、eNo reproduction or networking permitted without license from IHS-,-,-UFC 4-211-02NF 10 January 2005 Including Change 4, 1 April 2010 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and moderni
6、zation criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT with each squadron hangar; and the production control offices in the airframes shop, avionics shop, engine maintenance shop, ground support equipment shop, aviation
7、armaments shop and aviation life support systems shop. 1-6 ENERGY CONSERVATION. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 4-211-02NF 10 January 2005 Including Change 4, 1 April 2010 2 Energy conservation is a major consideration in the desi
8、gn of building envelopes, mechanical systems, and electrical systems. Refer to UFC 3-400-01, Energy Conservation. 1-7 ENVIRONMENTAL CONCERNS. The facility must comply with all applicable 2 environmental regulations. /2/ The Whole Building Design Guide web site (http:/www.wbdg.org/) provides informat
9、ion and links to the various laws and guidance documents pertaining to the environment. For site-specific information, contact the base environmental office and the local Facility Engineering Command. 1-8 ANTITERRORISM AND FORCE PROTECTION. The facility must meet all applicable requirements of UFC 4
10、-010-01, DoD Minimum Antiterrorism Standards for Buildings. If a conflict occurs between this UFC and UFC 4-010-01, UFC 4-010-01 governs. 1-9 BUILDING PROTECTION. Protect the facility, including corners of interior partitions and exterior walls, doors, and structural members, from damage by vehicles
11、 and moving loads. Install concrete-filled pipe guards, bumpers, railings, corner guards and similar protective features. 1-10 FIRE PROTECTION. Provide fire protection in accordance with UFC 3-600-01, Fire Protection Engineering for Facilities and 4 UFC 4-211-01N /4/. 2 Also refer to NFPA 410, Stand
12、ard on Aircraft Maintenance, particularly Chapter 7, “Aircraft External Cleaning, Painting and Paint Removal“ and Chapter 10, “Fire Protection;“ NFPA 33, Standard for Spray Application Using Flammable and Combustible Materials; NFPA 70, National Electric Code, especially Article 513, “Aircraft Hanga
13、rs“ and Article 516, “Spray Application, Dipping, and Coating Processes.“ /2/ 4 For Air Force Projects, follow UFC 3-600-01, Fire Protection Engineering for Facilities and ETL 02-15, Fire Protection Criteria - New Aircraft Facilities and ETL 98-8, Fire Protection Criteria - Existing Aircraft Facilit
14、ies. /4/ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 4-211-02NF 10 January 2005 Including Change 4, 1 April 2010 3 CHAPTER 2 - CORROSION CONTROL HANGARS 2-1 FUNCTION. Design the corrosion control hangar to provide space and equipment for the
15、corrosion control processing of aircraft. This corrosion control process can be performed at either a depot level or organizational and intermediate (O/I) level facility as defined in NAVAIR Technical Manual NA01-1A-509, Aircraft Weapons Systems Cleaning and Corrosion Control. Base facilities design
16、ed for depot level maintenance on de-paint/re-paint of the entire aircraft. Base facilities designed for O/I level maintenance on repair of damaged paint systems and de-paint/repaint of components only. This does not include de-painting by plastic media blasting (PMB) equipment. Functions performed
17、in the corrosion control hangar include: a. deicing, b. limited detergent washing and rinsing, c. paint stripping, d. corrosion removal, e. protective coating application and painting, and f. finish curing and drying. Refer to NAVAIR Technical Manual NA01-1A-509 for detailed functions performed in t
18、his facility. 4 For Air Force Facilities, the minimum facility requirements to support unit/base level corrosion control functions are an environmentally controlled area to wash aircraft and hangar space for corrosion treating, corrosion repairing, paint stripping and performing maintenance painting
19、 on entire aircraft. Space must also be provided for the Corrosion Control Shop, which includes a preparation and paint application area for aircraft components and support equipment; paint mixing area; tool and equipment storage; paint storage; personnel hygiene facilities and administrative areas.
20、 /4/ 2-2 LOCATION. Locate the corrosion control hangar in proximity to the maintenance hangars and as close as possible to an aircraft washrack. Access between the corrosion control hangar, the maintenance hangar, and the aircraft washrack is required. Consider the prevailing wind in orienting the b
21、uilding in relation to aprons, taxiways, and parking, to avoid exhaust air dispersal over areas affected by solvent fumes 4and to avoid recirculation into the ventilation system intakes./4/ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 4-211-02
22、NF 10 January 2005 Including Change 4, 1 April 2010 4 Care must also be taken to site the hangar in accordance with the requirements of NAVFAC P-80.3 and UFC 3-260-01, Airfield and Heliport Planning and Design. It should not be sited within any runway safety zone or in a location where it might exte
23、nd into any imaginary surface. 2-3 ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. 4 For Navy Projects,/4/ there are two types of depot level corrosion control hangars. a. Type A corrosion control hangars are designed for carrier aircraft and other small aircraft. b. Type B corrosion control hangars are
24、designed for land-based transport or patrol aircraft. Because both construction and operating costs increase as the volume of the hangar bay increases, design depot level corrosion control hangars for aircraft larger than those accommodated by the Type B hangar and O/I level corrosion control hangar
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC421102NFCHANGE42010CORROSIONCONTROLANDPAINTFINISHINGHANGARSSUPERSEDEDNAVYMILHDBK10281CCANCNOTICE1NAVYMILHDBK10281CNAVYMILHDBK10281BNAVYMILHVYPDF

链接地址:http://www.mydoc123.com/p-1066968.html