UFC 4-020-04A CHANGE 2-2009 ELECTRONIC SECURITY SYSTEMS SECURITY ENGINEERING [Superseded ARMY ARMY TM 5-853-4].pdf
《UFC 4-020-04A CHANGE 2-2009 ELECTRONIC SECURITY SYSTEMS SECURITY ENGINEERING [Superseded ARMY ARMY TM 5-853-4].pdf》由会员分享,可在线阅读,更多相关《UFC 4-020-04A CHANGE 2-2009 ELECTRONIC SECURITY SYSTEMS SECURITY ENGINEERING [Superseded ARMY ARMY TM 5-853-4].pdf(155页珍藏版)》请在麦多课文档分享上搜索。
1、UFC 4-020-04A 1 MARCH 2005 Change 2 22 September 2009 UNIFIED FACILITIES CRITERIA (UFC) ELECTRONIC SECURITY SYSTEMS: SECURITY ENGINEERING APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 4-020-04
2、A 1 MARCH 2005 Change 2 22 September 2009 UNIFIED FACILITIES CRITERIA (UFC) SECURITY ENGINEERING: ELECTRONIC SECURITY SYSTEMS Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright
3、 holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) Record of Changes (changes are indicated by 1 . /1/) Change No. Date Location 1 June 2006 Forward changed. 2 Sep 22 2009 Removed “F” from document number _ This UFC supersedes TM 5-853-4, dated 12 May 1994. The format of this UFC does not co
4、nform to UFC 1-300-01; however, the format will be adjusted to conform at the next revision. The body of this UFC is a document of a different number. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 4-020-04A 1 MARCH 2005 Change 2 22 September 20
5、09 FOREWORD 1 The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with U
6、SD(AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances,
7、 Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the more stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable. UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Servi
8、ces responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Air Force Center for Engineering and the Environment (AFCEE) are responsible for administration of the UFC system. D
9、efense agencies should contact the preparing service for document interpretation and improvements. Technical content of UFC is the responsibility of the cognizant DoD working group. Recommended changes with supporting rationale should be sent to the respective service proponent office by the followi
10、ng electronic form: Criteria Change Request (CCR). The form is also accessible from the Internet sites listed below. UFC are effective upon issuance and are distributed only in electronic media from the following source: Whole Building Design Guide web site http:/dod.wbdg.org/. Hard copies of UFC pr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC402004ACHANGE22009ELECTRONICSECURITYSYSTEMSSECURITYENGINEERINGSUPERSEDEDARMYARMYTM58534PDF

链接地址:http://www.mydoc123.com/p-1066954.html