UFC 3-400-01 CHANGE 4-2008 ENERGY CONSERVATION [Superseded ARMY ARMY TI 800-01].pdf
《UFC 3-400-01 CHANGE 4-2008 ENERGY CONSERVATION [Superseded ARMY ARMY TI 800-01].pdf》由会员分享,可在线阅读,更多相关《UFC 3-400-01 CHANGE 4-2008 ENERGY CONSERVATION [Superseded ARMY ARMY TI 800-01].pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、UFC 3-400-01 5 July 2002 Including Change 4, August 2008 UNIFIED FACILITIES CRITERIA (UFC) ENERGY CONSERVATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITEDProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-400-01 5 July 2002 Including Chang
2、e 4, August 2008 UNIFIED FACILITIES CRITERIA (UFC) ENERGY CONSERVATION Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activi
3、ty) NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by 1 . /1/) Change No. Date Location 1 Dec 2007 Incorporate EPAct05 requirements in Paras. 1, 2 Delete Paras. 3 5 3 Feb 2008 1-1, 1-3, 1-3.1.2, 2-1.1, 2-1.2, 2-1.3, 2-2, 2-3, 2-4
4、, 2-4.2, 2-5 4 Aug 2008 Revised Paras 1-2,1-3,1-3.1, 1-3.1.1, 1-3.1.2, 2-1.1, 2-1.3, 2-2, 2-3, 2-4.1, 2-4.2, 2-5; Added Paras 1-3.3 and 2-1.4 This UFC supersedes Military Handbook 1190, dated 1 September 1987, Chapter 8, and TI 800-01, dated 20 July 1998, Chapter 11. Provided by IHSNot for ResaleNo
5、reproduction or networking permitted without license from IHS-,-,-UFC 3-400-01 5 July 2002 Including Change 4, August 2008 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization crit
6、eria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT whether in the United States or overseas (CONUS or OCONUS)/4/, whether acquired or leased, by appropriated or non-appropriated funds, or third party financed and constructed. 1
7、-3 CRITERIA. This UFC implements the following public laws and industry standards:/2/ ASHRAE Standard 90.1 4 2007 /4/, Energy Standard for Buildings Except Low-Rise Residential Buildings, American Society of Heating Refrigeration and Air Conditioning Engineers, Inc., Atlanta Georgia 2 Title 10 Code
8、of Federal Regulations, Part 433, Energy Efficient Standards for the Design and Construction of New Federal and Commercial and Multi-Family High Rise Residential Buildings USC Title 10, Part 435, Energy Efficient Standards for New Federal Low Rise Residential Buildings/2/ Title 10 Code of Federal Re
9、gulations, Part 436 Federal Energy Management and Planning Programs, Subpart A Methodology and Procedures for Life Cycle Cost Analysis 2 3 ICC International Energy Conservation Code 42006/4/ /3/ 4/4/ 3 Executive Order 13221 - Energy Efficient Standby Power Devices /3/ Provided by IHSNot for ResaleNo
10、 reproduction or networking permitted without license from IHS-,-,-UFC 3-400-01 5 July 2002 Including Change 4, August 2008 2 4 Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management Energy Independence and Security Act of 2007 /4/ 1-3.1 Applications/Types o
11、f Work Efforts. 4/4/ 1-3.1.1 New 4Buildings/4/. All new 4buildings, including single family housing and low rise (3 stories or less) multi-family residential buildings,/4/ must comply with this UFC. 1-3.1.2 Renovation (including renewal, renovation and sustainment). a. Where renovation costs are gre
12、ater than or equal to 25 percent 4(for Navy projects use a 50 percent threshold)/4/ of the replacement cost of the building, the entire building shall be brought into compliance with the requirements for new construction listed above. The 4renovation/4/ cost of the building is exclusive of the cost
13、to bring the building into compliance. b. Where renovation costs are less than 3 /3/ 25 percent 4(for Navy projects use a 50 percent threshold)/4/ of the replacement cost of the building the entire building shall be brought into compliance with the requirements for new construction referenced above
14、to the maximum extent practical. All new work shall comply with the requirements for new construction referenced above. 1-3.2 Authority Having Jurisdiction (AHJ). The term AHJ as used in this UFC and its references refers to the component office of responsibility, i.e. U.S. Army, HQUSACE/CECW-CE; U.
15、S. Navy, NAVFACENGCOM HQ Code CHE; U.S. Marine Corps, HQMC Code LFF-1; U.S. Air Force, HQ AFCESA/CES; Defense Logistics Agency, DES-SE; National Geospatial-Intelligence, Security and Installations; and for all other DOD components, Deputy Undersecretary of Defense for Installations./2/ 41-3.3 Waiver
16、s. All requests for waiver shall be submitted to the AHJ for approval. Each request for waiver must include appropriate justification, and must be accompanied by the supporting Energy Compliance Analysis and Life Cycle Cost Analysis. /4/ 2-0 GENERAL REQUIREMENTS. 2-1 2BASIC CRITERIA. 2-1.1 New build
17、ings 3including all Army Unaccompanied Enlisted Personnel Housing (UEPH),4 Navy Bachelor Enlisted Quarters (BEQ) and Navy Bachelor Officers Quarters (BOQ),/4/ regardless of height, but excluding other single family and /3/ low Provided by IHSNot for ResaleNo reproduction or networking permitted with
18、out license from IHS-,-,-UFC 3-400-01 5 July 2002 Including Change 4, August 2008 3 rise multi-family residential buildings shall be designed and constructed in accordance with the Energy Policy Act of 2005 as codified in the CFR Title 10 CFR Part 433. Specifically, new buildings shall be designed t
19、o comply with ASHRAE Standard 90.1. In addition, to complying with the standard, 4new/4/ buildings shall also achieve an energy consumption level that is at least 30 percent below the level achieved under ASHRAE Standard 90.1. If a minimum of 30 percent energy consumption savings can not be achieved
20、 in a life cycle cost effective manner, the maximum savings level that is cost effective shall be achieved. Energy consumption levels for both the baseline building and proposed building shall be determined by using the Performance Rating Method found in ASHRAE Standard 90.1 Appendix G except the fo
21、rmula for calculating the Performance Rating in paragraph G1.2 shall read as follows: Percentage improvement = 100 x (Baseline building consumption - Proposed building consumption) / (Baseline building consumption - Receptacle and process loads). Laboratory fume hoods and kitchen ventilation systems
22、 shall be included as part of the HVAC loads subject to the 30 percent savings requirements, rather than as process loads. 2-1.2 New 3 single /3/ family housing and low rise (3 stories or less) multi-family residential buildings shall be designed and constructed in accordance with CFR Title 10 CFR P
23、art 435. Specifically, 4/4/residential buildings shall be designed to comply with the ICC International Energy Conservation Code. In addition, to complying with the code, buildings shall also achieve an energy consumption level that is at least 30 percent below the level achieved under ICC Internati
24、onal Energy Conservation Code. Energy consumption levels for both the baseline building and proposed building shall be determined by using the Simulated Performance Alternative found in the ICC International Energy Conservation Code4/4/. If a minimum of 30 percent energy consumption savings can not
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC340001CHANGE42008ENERGYCONSERVATIONSUPERSEDEDARMYARMYTI80001PDF

链接地址:http://www.mydoc123.com/p-1066933.html