1、UFC 3-310-04 1 May 2012 UNIFIED FACILITIES CRITERIA (UFC) SEISMIC DESIGN OF BUILDINGS APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-310-04 1 May 2012 i UNIFIED FACILITIES CRITERIA (UFC) SEIS
2、MIC DESIGN OF BUILDINGS Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) NAVAL FACILITIES ENGINEERING COMMAND AIR FO
3、RCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by 1 . /1/) Change No. Date Location This UFC supersedes UFC 3-310-04, dated June 22, 2007, with Change 1, dated January 27, 2010. The format of this document does not conform to UFC 1-300-01. Provided by IHSNot for ResaleNo
4、reproduction or networking permitted without license from IHS-,-,-UFC 3-310-04 1 May 2012 ii FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD-3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Milit
5、ary Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD (AT Telecommunications Industry Association TMS The Masonry Society UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specifications USACERL former acronym for ERDC-CERL USGS U.S. Geological Survey
6、 USACE U.S. Army Corps of Engineers UUT Unit Under Test ZIP Zoning Improvement Plan Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-310-04 1 May 2012 2-1 CHAPTER 2 2009 IBC MODIFICATIONS FOR SEISMIC DESIGN FOR DOD BUILDINGS The 2009 Internation
7、al Building Code (2009 IBC) is adopted as the building code for DOD projects. UFC 3-310-04 supplements the requirements of UFC 1-200-01, General Building Requirements, by defining modifications to the 2009 IBC related specifically to seismic design of buildings. In the following narrative, required
8、modifications to the provisions of the 2009 IBC are listed. The modifications are referenced to specific sections in the 2009 IBC that must be modified. Any section in the 2009 IBC that is not specifically referenced shall be applied as it is written in the 2009 IBC. The 2009 IBC adopts by reference
9、 extensive portions of ASCE/SEI 7-05, Minimum Design Loads for Buildings and Other Structures (ASCE 7-05). This UFC modifies some sections in ASCE 7-05 in the same manner as is described for the 2009 IBC. An example section number in this chapter is 2-1603.1.5 or 2-13.6.7. The first number, 2, refer
10、s to Chapter 2 of this UFC. 1603.1.5 refers to 2009 IBC Section 1603.1.5 and 13.6.7 refers to ASCE 7-05 Section 13.6.7. It is expected that designers may highlight or otherwise mark those paragraphs of the 2009 IBC, RP 8, and ASCE 7-05 that are modified by this UFC. The required 2009 IBC, RP 8, and
11、ASCE 7-05 section modifications are one of four actions, according to the following legend: Addition New section added, includes new section number not shown in the 2009 IBC, RP 8, or ASCE 7-05. Deletion Delete referenced 2009 IBC, RP 8, or ASCE 7-05 section. Replacement Delete referenced 2009 IBC,
12、RP 8, or ASCE 7-05 section and replace it with the narrative shown. Supplement Add narrative shown as a supplement to the narrative shown in the referenced section of the 2009 IBC, RP 8,or ASCE 7-05. In a number of instances, provisions of ASCE/SEI 7-10, Minimum Design Loads for Buildings and Other
13、Structures, are adopted herein. These adopted provisions represent substantive changes from ASCE/SEI 7-05 to ASCE/SEI 7-10. With the tri-services adoption of the 2012 International Building Code (2012 IBC), the ASCE/SEI 7-10 provisions will be adopted by reference, and those provisions will no longe
14、r be listed in future editions of this UFC. 2-16 STRUCTURAL DESIGN 2-1603 CONSTRUCTION DOCUMENTS 2-1603.1.5 Supplement Earthquake Design Data. Item 2 covering mapped spectral response accelerations shall be modified to indicate the source of the acceleration data, including source date and author. I
15、f the data are based on site-specific response analysis, that shall be noted. Site-specific source data shall also note whether response spectrum or time-history analyses were performed. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-310-04 1
16、May 2012 2-2 2-1603.1.9 Replacement Systems/Components Requiring Special Inspection for Seismic Resistance. Construction documents or specifications shall be prepared for those systems and components requiring special inspection for seismic resistance, as specified in 2009 IBC Section 1707 and modif
17、ied by Section 2-1707 of this UFC, by the Registered Design Professional responsible for their design. Reference to seismic standards in lieu of detailed drawings is acceptable. 2-1604.5 UFC Supplement Occupancy Category. 2009 IBC Table 1604.5 shall be replaced by UFC 3-301-01 Table 2-2. 2-1612 FLOO
18、D LOADS 2-1612.6 Addition Tsunami. Occupancy Category (OC) I, II, III, and IV facilities are recommended to be designed to mitigate the effects of Tsunami in conformance with Appendix M to the 2012 IBC reproduced below. All mitigation methods will require approval by the AHJ. Approval by the AHJ wil
19、l be required for an Occupancy Category III or IV facility to be located within Tsunami inundation zones. In 2012 IBC Section M101.4 below, replace “Risk Category” with “Occupancy Category.” 2012 IBC SECTION M101 TSUNAMI-GENERATED FLOOD HAZARD M101.1 General. The purpose of this appendix is to provi
20、de tsunami regulatory criteria for those communities that have a tsunami hazard and have elected to develop and adopt a map of their tsunami hazard inundation zone. M101.2 Definitions. The following words and terms shall, for the purposes of this appendix, have the meanings shown herein. TSUNAMI HAZ
21、ARD ZONE MAP. A map adopted by the community that designates the extent of inundation by a design event tsunami. This map shall be based on the tsunami inundation map which is developed and provided to a community by either the applicable State agency or the National Atmospheric and Oceanic Administ
22、ration (NOAA) under the National Tsunami Hazard Mitigation Program, but shall be permitted to utilize a different probability or hazard level. TSUNAMI HAZARD ZONE. The area vulnerable to being flooded or inundated by a design event tsunami as identified on a communitys Tsunami Hazard Zone Map. M101.
23、3 Establishment of Tsunami Hazard Zone. Where applicable, if a community has adopted a Tsunami Hazard Zone Map, that map shall be used to establish a communitys Tsunami Hazard Zone. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-310-04 1 May 2
24、012 2-3 M101.4 Construction within the Tsunami Hazard Zone. Construction of structures designated Risk Category III and IV as specified under Section 1604.5 shall be prohibited within a Tsunami Hazard Zone. Exceptions: 1. A vertical evacuation tsunami refuge shall be permitted to be located in a Tsu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC3310042012SEISMICDESIGNOFBUILDINGSPDF