1、UFC 3-270-02 15 March 2001 UNIFIED FACILITIES CRITERIA (UFC) ASPHALT CRACK REPAIR APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-270-02 15 March 2001 UNIFIED FACILITIES CRITERIA (UFC) ASPHALT
2、 CRACK REPAIR Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL
3、ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by 1 . /1/) Change No. Date Location 1 16 May 2006 Revised Foreword The format of this document does not conform to UFC 1-300-1; however, it will be reformatted at the next major revision. 1Provided by IHSNot for ResaleNo reproduction
4、or networking permitted without license from IHS-,-,-UFC 3-270-02 15 March 2001 FOREWORD 1 The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departm
5、ents, the Defense Agencies, and the DoD Field Activities in accordance with USD(AThowever, letter surveys of State DOTs have indicated that Fed. Spec. SS-S-1401C and ASTM D3405 sealants generally perform better in cooler regions than do ASTM D 1190 sealants. It isrecommended that ASTM D 1190 materia
6、ls not be used in areas that receive a high volume ofpedestrian traffic due to the materials tendency to track onto the pavement and stick to the solesof shoes.5.2. DOT Spec. Rubberized asphalt sealants that are not covered by the above specificationscan be used only when an appropriate State DOT or
7、 local municipality material specification isavailable and after the sealant has been approved by the Facilities Engineer. The DOT and localspecifications will often be modified to account for the temperature variations of the region.Asphalt cements that contain synthetic fibers have been used succe
8、ssfully on a limited basis as acrack sealant. State or municipality specifications should also be used for these materials.5.3. Other. The crack sealant material should be tested by a government-approved independentlaboratory for specification conformance before it is used on a project. If the quant
9、ity of sealantfor the project is less than 500 pounds (227 kilograms), then the manufacturers certificate ofcompliance may be accepted in place of testing. The evaluation of local field performance datafrom past sealing projects is often helpful in determining which type of sealant should be used to
10、seal the cracks.9UFC 3-270-0215 March 20015Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-CHAPTER 6CRACK PREPARATION EQUIPMENT6.1. Introduction. The eq
11、uipment used to prepare a crack for sealing will depend on the size ofthe crack. Equipment used to prepare a crack will be discussed in this chapter, and theprocedures for using the equipment will be discussed in Chapter 7.6.2. Equipment Inspection. All crack preparation equipment should be inspecte
12、d before andduring actual construction. Inspection will determine if the equipment is being properlymaintained, if all of the required safety devices are present, if the equipment is damaging thepavement, and if the equipment is being operated correctly and safely.6.3. Equipment. Crack preparation e
13、quipment includes the following:6.3.1. Router. A router is used to create a sealant reservoir by enlarging meandering cracks tothe desired depth and width. A vertical spindle router with a diamond bit (Figure 6.1.) isrecommended to minimize damage to the asphalt pavement; however, an impact router(F
14、igures 6.2. and 6.3.) may be used if it is equipped with carbide-tipped vertical-sided bits.Impact routers that are not equipped with carbide-tipped bits or those equipped with V-shapedbits should not be used because they tend to chip and damage the asphalt pavement. Whenusing a vertical spindle rou
15、ter, the router bit should be belt-driven to help prevent injury to theoperator and damage to the pavement if the bit jams in the crack. If damage to the pavement isobserved, work should be discontinued until corrective action is taken. Such corrective actionmay require replacing worn router bits, c
16、hanging operators, or replacing the equipmentcompletely.6.3.2. Concrete saw. A concrete saw with a water-cooled diamond blade or abrasive disk canbe used to widen straight cracks to the desired width and depth. Concrete saws may be used in116UFC 3-270-0215 March 2001Provided by IHSNot for ResaleNo r
17、eproduction or networking permitted without license from IHS-,-,-place of a router if the blade has a diameter of 6 inches (150 millimeters) or less (Figure 6.4.).The 6-inch- (150-millimeter-) diameter blade allows the saw to follow slightly meandering cracks;however, a saw blade does not follow the
18、 meandering crack as well as a router. If a saw is usedto widen the crack, a high-pressure water stream can be used to remove the debris created bythe saw (Figure 6.5.).6.3.3. Hot compressed-air (HCA) heat lance. The HCA heat lance (Figure 6.6.) is used to warm,dry, and clean the crack when the seal
19、ing operation must be conducted in less than desirableconditions. Such conditions occur following rain or when the pavement temperature is below50 degrees Fahrenheit (10 degrees Celsius). The heat lance can also be used to remove smallamounts of vegetation from cracks. Heat lances are capable of pro
20、ducing heated air at3,000 degrees Fahrenheit (1,650 degrees Celsius) at velocities of up to 3,000 feet per second(915 meters per second); therefore, extreme care must be used by the operator. The heat lanceshould not remain stationary over one spot but should be kept moving to ensure that the asphal
21、tpavement is not overheated. Overheating will cause the pavement to become charred and brittle,resulting in premature sealant bond failure. Heating the cracks using direct flame methodsshould not be permitted. Direct flames harden the asphalt and leave a sooty residue thatprevents adequate bonding o
22、f the sealant to the asphalt pavement.6.3.4. Sandblasting equipment. Sandblasting equipment (Figure 6.7.) is used to remove residueleft by the saw, loosened aggregate left by the router, vegetation, and other debris. If debris isleft in the crack, the sealant will not bond adequately to the asphalt,
23、 causing premature failure.Equipment for sandblasting consists of an air compressor, hoses, and a venturi-type nozzle withan opening not to exceed 1/4 inch (6 millimeters). The air compressor should be equipped withtraps that will keep the compressed air free of oil and moisture. The compressor shou
24、ld becapable of supplying air at 150 cubic feet per second (4 cubic meters per second) andmaintaining a line pressure of 90 pounds per square inch (620 kilopascals). Caution should be12UFC 3-270-0215 March 2001Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC3270022006ASPHALTCRACKREPAIRCHANGE1INCORPORATED 沥青 裂纹 修复 并入 变更 PDF

链接地址:http://www.mydoc123.com/p-1066928.html