1、UFC 3-260-11FA 25 May 2005 UNIFIED FACILITIES CRITERIA (UFC) MODEL DESIGN-BUILD (D-B) REQUEST FOR PROPOSAL (RFP) FOR AIRFIELD CONTRACTS APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-260-11FA
2、 25 May 2005 UNIFIED FACILITIES CRITERIA (UFC) MODEL DESIGN-BUILD (DB) REQUEST FOR PROPOSAL (RFP) FOR AIRFIELD CONTRACTSAny copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holde
3、r. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL ENGINEER SUPPORT AGENCY (Preparing Activity) Record of Changes (changes are indicated by 1 . /1/) Change No. Date Location Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IH
4、S-,-,-UFC 3-260-11FA 25 May 2005 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Act
5、ivities in accordance with USD(AT however, it provides applicable Navy publications where additional information can be found. The Navys D-B acquisition template is located at http:/www.wbdg.org/ndbm/, Section G2060. 1-2 REFERENCES. Each chapter of this UFC lists references applicable to the topic o
6、f the chapter. Appendix A contains a comprehensive list of references used in this UFC. null United States Army Corps of Engineers (USACE) Technical Instruction (TI) 800-03, Technical Requirements for Design-Build, 1 July 1998 1 Provided by IHSNot for ResaleNo reproduction or networking permitted wi
7、thout license from IHS-,-,-UFC 3-260-11FA 25 May 2005 null USACE Guidance for Firm Fixed-Price Design-Build Construction Contracts, updated 10 July 2002, available at www.hnd.usace.army.mil/chemde/design-build.asp 1-3 D-B PROCESS. The intent of this document is not to discuss the D-B process but to
8、provide guidance for the preparation of an RFP for an airfield D-B project. Discussion of the D-B contracting process is included in TI 800-03 and Guidance for Firm Fixed-Price Design-Build Construction Contracts The first two chapters of TI 800-03 provide information regarding D-B contracting: null
9、 Chapter 1, General null Chapter 2, The Design-Build Process The technical portions of Guidance for Firm Fixed-Price Design-Build Construction Contracts are based on building projects (vertical construction) more than site work (horizontal construction). However, there are parts that address contrac
10、tual, proposal evaluation, and award criteria that are pertinent to D-B contracts for airfields. These parts are: null Part 1, Introduction null Part 2, Non-Traditional Roles and Responsibilities null Part 3, Cost Limitation Clauses null Part 4, Special Contract Clauses null Part 5, Contract Clauses
11、 for D-B Contracts null Part 6, Basis of Award null Part 11, Proposal Evaluation Criteria 1-4 D-B RFP. Section 2-3 of TI 800-03 states that an RFP for a D-B contract should include proposal submission requirements, project requirements, criteria, and evaluation factors. The RFP should provide the fr
12、amework and requirements necessary for offerors to submit proposals. The major parts of an RFP include: null Instructions to Proposers null Solicitation/Contract Form 1442 null Bidding Schedule null Contract Clauses null Special Contract Requirements null Contract Completion Schedule and Phasing nul
13、l Contract Forms null Proposal Submission Requirements 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-260-11FA 25 May 2005 null Evaluation Factors for Award null Design Criteria null Specification Criteria null Design After Award null Review
14、 Process null Construction Figure 1-1 is a sample table of contents for a D-B RFP for an airfield project. This table of contents can be amended to meet the requirements of an individual project. Figure 1-1. Sample D-B Airfield Project RFP Table Of Contents PROPOSAL REQUIREMENTS, CONTRACT FORMS, AND
15、 CONDITIONS OF THE CONTRACT 00010 SOLICITATION, OFFER & AWARD SF 1422 BIDDING SCHEDULE 00100 INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS 00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS 00120 PROPOSAL EVALUATION AND CONTRACT AWARD 00600 REPRESENTATIONS AND CERTIFICATIONS 00700 CONTRACT CLAUSES 0080
16、0 SPECIAL CONTRACT REQUIREMENTS SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS 01010 STATEMENT OF WORK FOR AIRFIELD DESIGN-BUILD 01016 DETAILED TECHNICAL REQUIREMENTS FOR AIRFIELD DESIGN-BUILD 01018 DESIGN AFTER AWARD FOR AIRFIELD DESIGN-BUILD 01320 PROJECT SCHEDULE 01330 SUBMITTAL REQUIREMENTS 013
17、55 ENVIRONMENTAL PROTECTION 01451 CONTRACTOR QUALITY CONTROL 01500 TEMPORARY CONSTRUCTION FACILITIES 01780 CLOSEOUT SUBMITTALS AND WARRANTY DIVISIONS 02-16 TECHNICAL SPECIFICATIONS (INCLUDE EDITED UNIFIED FACILITY GUIDE SPECIFICATIONS AS REQUIRED) Note: Many of the standard construction contract ite
18、ms included in Section 00700, Contract Clauses, and Section 00800, Special Contract Requirements, do not differ 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-260-11FA 25 May 2005 greatly from a conventional invitation for bid package. Refer
19、 to part 5 of USACEs Guidance for Firm Fixed-Price Design-Build Construction Contracts for a discussion of some modifications for Special Contract Requirements. 1-5 GOVERNMENT/CONTRACTOR D-B ROLES. There are no inherent “design-build” roles and responsibilities simply because a contract is called de
20、sign-build. To increase the probability of a successful D-B contract, it is necessary that both the Government and Contractor have a clear understanding of their respective roles, responsibilities, and risks. The general descriptions of the D-B roles in paragraphs 1-5.1 and 1-5.2 may change to meet
21、the requirements of individual projects. 1-5.1 Government Role null Clearly establish the roles of the Government and Contractor in the RFP. null Express the intent of the design and provide an adequate and complete facility design/construction scope and criteria in the RFP. null Establish execution
22、 requirements (e.g., customer schedule, customer operations, and any constraints on Contractor work, Contractor submittals, permits, special work acceptance requirements) and identify appropriate requirements in the RFP. null Monitor design and construction during the project implementation for cont
23、ract compliance. null Respond quickly to the design and construction needs of the Contractor to avoid slowing down or otherwise impeding the Contractors schedule. null The Government must not assume responsibility for the design adequacy by “approving” design or construction submittals, except to ap
24、prove requested deviations from the contract when acceptable and appropriate. The Governments role changes from reviewing designs and submittals for technical adequacy for design-bid-build projects to reviewing for conformance with the contract on D-B contracts. 1-5.2 D-B Contractor Role 1-5.2.1 Whe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC326011FA2005MODELDESIGNBUILDDBREQUESTFORPROPOSALRFPFORAIRFIELDCONTRACTS 机场 合同 模型 设计 建造 DB 提案 申请 RFPPDF

链接地址:http://www.mydoc123.com/p-1066927.html