SSPC SP COM-2004 Surface Preparation Commentary for Steel and Concrete Substrates《钢基板和混凝土基板的表面处理说明》.pdf
《SSPC SP COM-2004 Surface Preparation Commentary for Steel and Concrete Substrates《钢基板和混凝土基板的表面处理说明》.pdf》由会员分享,可在线阅读,更多相关《SSPC SP COM-2004 Surface Preparation Commentary for Steel and Concrete Substrates《钢基板和混凝土基板的表面处理说明》.pdf(32页珍藏版)》请在麦多课文档分享上搜索。
1、SSPC-SP COMNovember 1, 20042-1SSPC: The Society for Protective CoatingsSURFACE PREPARATION SPECIFICATIONSSurface Preparation Commentary for Steel and Concrete Substrates1. IntroductionThis Surface Preparation Commentary (SP COM) is in-tended to be an aid in selecting the proper surface preparation m
2、ethod, materials, and specifi cation for steel, other metals, and concrete. A compilation of standards, guides, and speci-fi cations related to concrete is available as SSPC publication #04-03 “Surface Preparation and Coating of Concrete.” The SP COM is not part of the actual standards, but is inclu
3、ded to provide a better understanding of the SSPC surface prepara-tion standards. In addition, surface preparation standards other than those published by SSPC are referenced.The SSPC standards, summarized in Table 1, represent a broad consensus of users, suppliers, and public interest groups. Detai
4、ls of the methods used to measure many of the properties discussed in this SP COM are described in SSPC publication 03-14, “The Inspection of Coatings and Linings, A Handbook of Basic Practice for Inspectors, Owners, and Specifi ers, 2nd Ed.”2. Contents1. Introduction2. Contents3. Importance of Surf
5、ace Preparation4. Surface Conditions4.1 New Construction4.2 Maintenance4.3 Surface Contaminants4.3.1 Rust, Stratifi ed Rust, Pack Rust, and Rust Scale4.3.2 Mill Scale4.3.3 Grease and Oil4.3.4 Dirt and Dust4.3.5 Moisture4.3.6 Soluble Salts4.3.7 Paint Chalk4.3.8 Deteriorated Paint4.4 Surface Defects4.
6、4.1 Welds and Weld Spatter4.4.2 Weld Porosity4.4.3 Sharp Edges 4.4.4 Pits4.4.5 Laminations, Slivers4.4.6 Crevices4.4.7 Concrete Defects4.5 Rust Back5. Summary of SSPC Surface Preparation Standards5.1 SSPC-SP 1, “Solvent Cleaning”5.1.1 Petroleum Solvents and Turpentine5.1.2 Alkaline Cleaners5.1.3 Emu
7、lsion Cleaners5.1.4 Steam Cleaning5.1.5 Threshold Limit Values5.1.6 Paint Removal5.2 SSPC-SP 2, “Hand Tool Cleaning”5.2.1 Loose Rust, Mill Scale, and Paint5.2.2 Consensus Reference Photographs5.3 SSPC-SP 3, “Power Tool Cleaning”5.3.1 Loose Rust, Mill Scale, and Paint5.3.2 Consensus Reference Photogr
8、aphs5.4 SSPC-SP 4, “Flame Cleaning of New Steel”5.5 SSPC-SP 5/NACE No. 1, “White Metal Blast Cleaning”5.5.1 Consensus Reference Photographs5.6 SSPC-SP 6/NACE No. 3, “Commercial Blast Cleaning”5.6.1 Reference Photographs5.7 SSPC-SP 7/NACE No. 4, “Brush-Off Blast Cleaning”5.7.1 Consensus Reference Pho
9、tographs5.8 SSPC-SP 8, “Pickling”5.9 SSPC-SP 9, “Weathering Followed by Blast Cleaning”5.10 SSPC-SP 10/NACE No. 2, “Near-White Blast Cleaning”5.10.1 Consensus Reference Photographs5.11 SSPC-SP 11, “Power Tool Cleaning to Bare Metal”5.11.1 Power Tools and Cleaning Media5.11.2 Power Tools with Vacuum
10、Shrouds5.11.3 Consensus Reference Photographs5.12 SSPC-SP 12/NACE No. 5, “Surface Preparation and Cleaning of Metals by Waterjetting Prior to Coating”5.12.1 Surface Cleanliness5.12.2 Flash Rusting5.12.3 Consensus Reference Photographs5.13 SSPC-SP 13/NACE No. 6, “Surface Preparation of Concrete”5.14
11、SSPC-SP 14/NACE No. 8, “Industrial Blast Cleaning”5.14.1 Consensus Reference Photographs5.15 SSPC-SP 15, “Commercial Grade Power Tool Cleaning”5.15.1 Consesnsus Reference Photographs6. Selection of Abrasives, Blast Cleaning Parameters, and Equipment6.1 Abrasive Characteristics6.1.1 Hardness6.1.2 Siz
12、e6.1.3 Shape6.1.4 Bulk Density6.1.5 Friability/Waste Generation6.1.6 RecyclabilitySSPC-SP COMNovember 1, 20042-26.2 Factors Affecting Surface Profi le6.2.1 Profi le Height6.2.2 Profi le Texture (Roughness)6.3 Parameters That Affect Productivity6.3.1 Particle Size6.3.2 Hardness6.3.3 Shape6.3.4 Specif
13、i c Gravity6.3.5 Nozzle Pressure6.3.6 Nozzle Type6.3.7 Nozzle to Surface Distance6.3.8 Impact Angle6.3.9 Abrasive Metering6.3.10 Abrasive Cleanliness6.3.11 Embedment6.4 Abrasive Types6.4.1 Metallic Abrasives6.4.2 Non-Metallic Abrasives6.5 Blast Equipment6.5.1 Conventional Blasting6.5.2 Vacuum Blasti
14、ng6.5.3 Abrasive Blast Cleaning Above 760 kPa (110 psi)7. Summary of SSPC Abrasive Standards7.1 SSPC-AB 1, “Mineral And Slag Abrasives7.2 SSPC-AB 2, “Cleanliness of Recycled Ferrous Metallic Abrasives”7.3 SSPC-AB 3, “Ferrous Metallic Abrasive”8. Wet Abrasive Blast and Waterjetting Methods8.1 Water C
15、leaning and Waterjetting (Without Abrasive)8.1.1 Degrees of Cleaning8.1.2 Profi le8.1.3 Water Consumption8.1.4 Equipment8.1.5 Flash Rust8.2 Wet Abrasive Blast Cleaning8.2.1 Air/Water/Abrasive Blasting8.2.2 Water/Abrasive Blast Cleaning8.3 Flash Rust and Rust Bloom8.4 Inhibitors and Salt Removers9. O
16、ther Cleaning Methods9.1 Chemical Stripping9.2 Sodium Bicarbonate (Baking Soda) Blast Cleaning9.3 Pliant Media Blasting (Sponge Jetting)9.4 Carbon Dioxide (Dry Ice) Blasting9.5 Electrochemical Stripping10. Film Thickness11. Consensus Reference Photographs11.1 SSPC-VIS 1,” Guide and Reference Photogr
17、aphs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning “11.2 SSPC-VIS 2, “Standard Method of Evaluating Degree of Rusting on Painted Steel Surfaces”11.3 SSPC-VIS 3, “ Guide and Reference Photographs for Steel Surfaces Prepared by Hand and Power Tool Cleaning “11.4 SSPC-VIS 4/NACE VIS 7, “Gu
18、ide and Reference Photographs for Steel Surfaces Prepared by Waterjetting”11.5 SSPC-VIS 5/NACE VIS 9, “Guide and Reference Photographs for Steel Surfaces Prepared by Wet Abrasive Blast Cleaning”11.6 ISO Pictorial Standards11.7 Other Photographic Standards11.8 Project Prepared Standards12. Other SSPC
19、 Surface Preparation Documents in This Volume12.1 SSPC-TR 1/NACE 6G194, “Joint Technology Report on Thermal Precleaning”12.2 SSPC-TR 2/NACE 6G198, “Joint Technical Report on Wet Abrasive Blast Cleaning”12.3 SSPC-TU 2/NACE 6G197, “Informational Report and Technology Update on Design, Installation, an
20、d Maintenance of Coating Systems for Concrete Used in Secondary Containment”12.4 SSPC-TU 4, “Field Methods for Retrieval and Analysis of Soluble Salts on Substrates”12.5 SSPC-TU 6, “Chemical Stripping of Organic Coatings from Steel Structures”13. Non-SSPC Cleaning Standards14. Surface Preparation of
21、 Concrete for Coating14.1 Industry Standards14.2 Methods of Cleaning Concrete15. Surface Preparation of Other Metallic Surfaces15.1 Aluminum15.2 Stainless Steel15.3 Copper Alloys3. Importance of Surface PreparationOften, the surface preparation of steel for painting requires a three step process: 1)
22、 initial pre-cleaning to remove grease, oil, dirt, and other surface contaminants; 2) cleaning with hand/power tools, pressurized water, chemicals, or abrasive blast-ing; 3) creation or verifi cation of the specifi ed anchor pattern profi le. The life of a coating depends as much on the degree and q
23、uality of surface preparation as on the selected coating system, because most coating failures can be attributed to inadequate surface preparation or lack of coating adhesion. Surface preparation, therefore, should receive thorough con-sideration. The primary functions of surface preparation are: To
24、 remove surface contaminants that can induce premature coating failure To provide a clean surface with adequate profi le for good coating adhesion.Where conventional abrasive blast cleaning is not allowed or is impractical, alternative abrasives or methods of cleaning the surface must be employed. C
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SSPCSPCOM2004SURFACEPREPARATIONCOMMENTARYFORSTEELANDCONCRETESUBSTRATES 钢基板 混凝土 表面 处理 说明 PDF

链接地址:http://www.mydoc123.com/p-1054524.html