1、SSPC-QS 1March 2, 20151SSPC: The Society for Protective CoatingsQuality System No. 1Standard Procedure for Evaluating a Coating Contractors Advanced Quality Management System1. SCOPE1.1 SSPC-QS 1 requires a coating contractor to implement and document advanced quality control and recordkeeping proce
2、dures. As such, the requirements of this standard are intended to supplement the requirements of SSPC-QP 1, SSPC-QP 3, SSPC-QP 6, and SSPC-QP 8. Owners and specifiers who require a higher level of quality control for their projects have the option to require that a contractor quali-fied to QP 1, 3,
3、6, or 8 also present evidence that its quality system meets the requirements of QS 1 on projects where an SSPC-QS 1 certification or an equivalent advanced quality management system is required.1.2 The objective of this standard is to confirm that a contractor has the personnel, organization, qualif
4、ications, procedures, knowledge, and capability to implement the QS 1 quality procedures.1.3 The standard encompasses the in-process inspection of surface preparation, application and cure of protective coatings and linings for new construction and maintenance for industrial, commercial, and marine
5、service.2. DEFINITIONSAuditor: 1) The person or persons performing audits on behalf of the qualifying agency. 2) The body possessing the necessary technical competence to review contractor submit-tals, conduct on-site audits of applicants, and report results in compliance with the requirements of th
6、is procedure and the written requirements of the formal audit program.Calibration: The set of operations that establish, under specified conditions, the relationship between values indicated by a measuring instrument and the corresponding known values of a measurement.Contractor: An individual or fi
7、rm that provides surface preparation and coating application services in the industrial, marine, and heavy or light industrial commercial markets.Corrective Action (CA): The action or actions undertaken to identify and eliminate the root cause of a product or process nonconformance to prevent its re
8、currence. Corrective action is not the repair or rework of identified nonconforming product or process to meet specified requirements.Inspection: Confirmation by examination and provision of evidence that specified requirements have been met. The examination and determination of conformity with spec
9、ific requirements on the basis of professional judgment, and general requirements according to published industry stan-dards, as required in each project specification.Qualifying Agency: The body responsible for sponsorship and operation of an independent certification program to ensure uniform comp
10、liance with provisions of a standard.Quality Control Manual: A document stating the contractors quality policy, quality system and quality practice.Quality System: The organizational structure, responsibilities, procedures, processes, and resources utilized by the contractor for implementing quality
11、 management.Procedure: The written sequence of steps taken by personnel to carry out a particular course of action.Test: A technical operation that consists of the determination of one or more characteristics or performance of a given product, material, equipment, physical phenomenon, process or ser
12、vice, according to a specified procedure.Test Method: A definitive, standardized set of instructions for the identification or measurement or evaluation of one or more qualities, characteristics, or properties of a material.Verification: Confirmation by examination and provision of evidence that spe
13、cified requirements have been met.3. SIGNIFICANCE AND USEContractors meeting the requirements of this standard have demonstrated that they are capable of implementing generally accepted inspection criteria for coating inspection (including surface preparation) and field testing activities normally r
14、equired as a part of coating inspection work. Contrac-tors meeting the requirements of this standard have the capability to provide and maintain the necessary quality systems required for each project requiring implementation of an advanced quality system.4. REFERENCED STANDARDS4.1 The latest issue,
15、 revision, or amendment of the referenced standards in effect on the date of invitation to bid shall govern, unless otherwise specified. 4.2 If there is a conflict between the requirements of any of the cited referenced standards and this procedure, the requirements of this procedure shall prevail.4
16、.3 SSPC STANDARDS:QP 1 Standard Procedure for Evaluating the Qualifications of Industrial/Marine Painting Contractors (Field Application to Complex Industrial Steel Structures SSPC-QS 1March 2, 20152QP 3/AISC 420.10 Certification Standard for Shop Application of Complex Protective Coating SystemsQP
17、6 Standard Procedure for Evaluating Contractors Who Apply Thermal Spray (Metallizing) for Atmospheric Corrosion Protection of Steel and Concrete Structures QP 8 Standard Procedure for Evaluating the Qualifications of Contracting Firms that Install Polymer Coatings or Surfacings on Concrete and Other
18、 Cementitious Surfaces4.4 SSPC PUBLICATIONSDevelopment and Use of Quality Control Forms in Coatings ContractingSSPC Guide for Planning Coatings Inspection4.5 ASTM INTERNATIONAL STANDARD1D3276 Standard Guide for Painting Inspectors (Metal Substrates)5. ORGANIZATION AND MANAGEMENT5.1 The contractor sh
19、all demonstrate that its inspection function is identifiable within the company organization.5.2 The contractor shall:5.2.1 Demonstrate that managerial staff have the necessary expertise, authority and resources to review and verify work performed by field personnel by supplying (1) an organizationa
20、l chart clearly showing lines of authority within the company, (2) written documentation of training and experience of managerial staff, and (3) written evidence that Quality Management reviews inspection and quality control reports written by its field inspection personnel at least weekly during pr
21、oduction operations.5.2.2 Be organized in such a way that demonstrates sufficient independence to ensure that quality considerations are independent of production. Provide written evidence that verification of the inspection result is administered independently of the inspection and production opera
22、tion.5.2.3 Specify and document the responsibility, authority, and interrelationship of all personnel who manage, perform or verify work activity affecting the system. Demonstrate that management personnel review work of field inspection staff and QA personnel to monitor compliance with project spec
23、ifications and any other contract documents.1 ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. For referenced ASTM standards, visit the ASTM website, www.astm.org, or contact ASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standards volume infor-mation,
24、refer to the standards Document Summary page on the ASTM website.5.2.4 Provide inspection, supervision, and management by persons familiar with the inspection or test methods and procedures, the objective of the inspection or test, and the assessment of the results. (See Section 7 for a description
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SSPCQS12015STANDARDPROCEDUREFOREVALUATINGACOATINGCONTRACTORSADVANCEDQUALITYMANAGEMENTSYSTEMPDF

链接地址:http://www.mydoc123.com/p-1054509.html