SANS 2001-BS1-2008 Construction works Part BS1 Site clearance《建设工程 第BS1部分 场地清理》.pdf
《SANS 2001-BS1-2008 Construction works Part BS1 Site clearance《建设工程 第BS1部分 场地清理》.pdf》由会员分享,可在线阅读,更多相关《SANS 2001-BS1-2008 Construction works Part BS1 Site clearance《建设工程 第BS1部分 场地清理》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. ISBN 978-0-626-19230-3 SANS 2001-BS1:2008Edition 1SOUTH AFRICAN NATIONAL STANDARD Construction works Part BS1: Site clearance Published by SABS Standards
4、 Division 1 Dr Lategan Road Groenkloof Private Bag X191 Pretoria 0001Tel: +27 12 428 7911 Fax: +27 12 344 1568 www.sabs.co.za SABS SANS 2001-BS1:2008 Edition 1 Table of changes Change No. Date Scope Acknowledgement The SABS Standards Division wishes to acknowledge the input of the South African Inst
5、itution of Civil Engineering in the development of this document. Foreword This South African standard was approved by National Committee SABS TC 59, Construction standards, in accordance with procedures of the SABS Standards Division, in compliance with annex 3 of the WTO/TBT agreement. This docume
6、nt was published in September 2008. This document supersedes SABS 1200 C:1980 (first edition). SANS 2001 consists of a number of parts in various stages of preparation, under the general title Construction works. Annex A forms an integral part of this document. Annex B is for information only. Intro
7、duction The different parts of SANS 2001 each address a specific component of construction works. The prime purpose in the production of these standards is to create a set of standards that are generally applicable to construction works, and which can be readily modified to make them applicable to p
8、articular works. The SANS 2001 family of standards provides technical descriptions of the standard of materials and workmanship that will be used in the works that are executed or in the performance of the works when completed (or both). These standards do not make reference to the actions of those
9、responsible for executing the works or the parties to a contract, i.e. to the constraints relating to the manner in which contract work is to be performed. Neither do they deal with the commercial arrangements of such contracts. These standards are suitable for use in any “in-house” construction wor
10、k or in all types of engineering and construction works contracts, for example, design by employer, design and build, develop and construct, construction management or management contracts. Standard requirements pertaining to the manner in which works are constructed can be found in the SANS 1921 fa
11、mily of standards. SANS 2001-BS1:2008 Edition 1 1 Contents Page Acknowledgement Foreword Introduction 1 Scope . 3 2 Normative references . 3 3 Definitions 4 4 Requirements . 5 5 Compliance with the requirements 8 Annex A (normative) Preparation of specification data associated with this part of SANS
12、 2001 for inclusion in the scope of work. 9 Annex B (informative) Items that might need to be considered when preparing the scope of work for a particular project. 12 Bibliography 12 SANS 2001-BS1:2008 Edition 1 2 This page is intentionally left blank SANS 2001-BS1:2008 Edition 1 3 Construction work
13、s Part BS1: Site clearance 1 Scope This part of SANS 2001 covers a) the removal of vegetation, fences, guard rails and posts, signage, litter and building rubble, boulders, and surface and subsurface obstructions, and the demolition and removal of structures (including their basements, if any) not d
14、irectly associated with or incidental to any construction site; b) the cleaning out of existing hydraulic structures and the clearing and grubbing of vegetation from the inlets and outlets of these structures; and c) clearing to improve sight distances on roadways. 2 Normative references The followi
15、ng referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. Information on currently valid national and international st
16、andards can be obtained from the SABS Standards Division. SANS 2001-CC1, Construction works Part CC1: Concrete works (structural). SANS 2001-CC2, Construction works Part CC2: Concrete works (minor works). SANS 2001-CM1, Construction works Part CM1: Masonry walling. SANS 2001-DP1, Construction works
17、Part DP1: Earthworks for buried pipelines and prefabricated culverts. SANS 10403:2003, Formatting and compilation of construction procurement documents. TMH1-A7, Standard methods of testing road construction materials Method A7: The determination of the maximum dry density and optimum moisture conte
18、nt of gravel, soil and sand. TMH1-A10(a), Standard methods of testing road construction materials Method A10(a): The determination of the in-place dry density of soil or gravel by the sand replacement method. SANS 2001-BS1:2008 Edition 1 4 TMH1-A10(b), Standard methods of testing road construction m
19、aterials Method A10(b): Tentative method for determining the in-place density and moisture content of soils and gravels by nuclear methods. TMH6-ST6, Special methods for testing roads Method ST6: Measurement of the in situ strength of soils by the Dynamic Cone Penetrometer (DCP). 3 Definitions For t
20、he purposes of this document, the definitions given in SANS 10403 and the following apply. 3.1 cleared surface surface of the ground after clearing of surface vegetation has been completed 3.2 designated area designated site area or site the position of which, in relation to the work to be carried o
21、ut, is shown in the drawings or is specified in the specification data 3.3 dynamic cone penetrometer dcp instrument used to measure the in-situ shear resistance of soil, comprising a drop weight of approximately 10 kg which falls through a height of 460 mm and drives a cone that has a maximum diamet
22、er of 20 mm (and a cone angle of 60 with respect to the horizontal) into the material being used 3.4 finished level level of the finished earthworks as shown in the drawings or specified in the specification data 3.5 grubbing operation of digging out the roots of vegetation 3.6 modified AASHTO maxim
23、um dry density highest density obtainable when compaction is carried out on soil at varied moisture contents at the modified AASHTO compaction effort in accordance with the requirements of TMH1-A7 3.7 original ground level level of the surface of an area before the commencement of clearing 3.8 pavem
24、ent layers of material that support a roadway, and which typically comprise the sub-base, base and surfacing 3.9 road prism that portion of the road construction included between the original ground level and the outer boundaries of the slopes or cuttings SANS 2001-BS1:2008 Edition 1 5 3.10 roadbed
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS2001BS12008CONSTRUCTIONWORKSPARTBS1SITECLEARANCE 建设 工程 BS1 部分 场地 清理 PDF

链接地址:http://www.mydoc123.com/p-1029971.html