SANS 10120-5 LG-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LG P.pdf
《SANS 10120-5 LG-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LG P.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 LG-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LG P.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0110 : Part 5 Section X-1983 Pipe jacking PART 5 : CONTRACT ADMINISTRATION SECTION LG CONTENTS Clause Page Number START OF CONSTRUCTION 1 General .
4、1 . IMMEDIATELY AFTER THE HANDING OVER OF THE SITE 1 Liaison with Third Parties 1 . nsuring the Practicabilty of Jacking 1 Tolerances . 1 DURING CONSTRUCTION 1 Methods of Construction 1 Lead pipe and overbreak 1 . Sealing of pipes 1 Joints at intermediate jacking stations 1 Jacking 1 De-watering 1 .
5、 Excavation of the face 2 Checking line and level 2 Settlements . 2 Steps to reduce jacking forces 2 Pipe to be kept moving during jacking 2 provision for lubrication 2 Earth resistance to jacking loads 2 Maintaining alignment 2 Supervision 2 Tolerances . 2 . Administration 2 . Special equipment for
6、 pipe jacking 2 Thrust pit length 2 Pipes to be of adequate strength Precautions when jacking under or near buildings . Intermediate jacking stations Blasting Occupation details for an alternative “cut and cover“ const QUALITY CONTROL AND OTHER CONSIDERATIONS . Quality Control Disputes . ruct June 1
7、983 Approved by the COUNCIL OF THE SOUTll AFRICAN BUREAU OF STANDARDS SABS 0120 : Part 5 Section LG-1983 Pipe jacking SABS 1200 LG : PIPE JACKING NOTE: The clause numher(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the numnber(s) of the relevant clause(
8、s) of SABS 1200 LG. START OF CONSTRUCTION GENERAL. For the purposes of this part of the code contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. IMMEDIATELY AFTER THE HANDING OVER OF TTIE SITE LIAISON WITH THIRD PAR+IES. In th
9、e case of work on the property of the South African Transport Services, the attention of the contractor should be drawn to the requirements of Clause 6 of the south African Transport Services Specification E7 covering works on, over, under or adjacent to railway lines. In the case of work on the pro
10、perty of any other third party, the contractor should be advised of the particular requirements that must be complied with. The engineer should ensure that all the necessary arrangements have been lilde with the third party. ENSURING THE PRACTICABILITY OF JACKING. The contractor should take all nece
11、ssary steps to ensure that pipes of the internal diameters called for in the schedule can be jacked over the full distances re- quired. If he concludes that because of the actual conditions on site or for any other reason, jacking of thc proposed plpes is impractical, he should ask the engineer for
12、other instructions. Where he had, in his tender, offered pipe jacking as an alternative method of construction, and he now finds that additional solls investigation is necessary, he must bear the cost of such lnvestigatlon as lt should have been allowed for in his tender (see also 3.2.5 below). TCLE
13、RANCES (Subclause 6.2). Where the tolerances given in Subclause 6.2 of SABS 1200 LG are not to apply, the tolerances should be agreed upon between the cngmeer and the contractor before work commences. DURING CONSTRUCTION METIIODS OF CONSTRUCTION 1,ead Pipe and Overbreak (Subclause 2.3). A lead plpe
14、with a rebated front end over which the trailing end of the shield 1s frtted should be the first concrete pipe used. Because there rs no substantial difference between the outside diameter of the shleld and of the pipeline, this should ensure that overbreak is kept to a minimum. Sealing of Pipes (Su
15、bclause 3.1). Joints between pipes may be sealed by the use of modified ogee type ends with a rubber ring confined within the joint, or by other suitable methods. Joints at Intermediate Jacking Stations. The joint between each pair of pipes at an intermediate jacking station should be so designed th
16、at a substantial and permanent caulked seal may be constructed within the joint with the use of an approved material that will withstand a back pressure of up to 200 kPa (20 m head of water). Jacking. The directionally adjustable shleld should be used to keep the head of the lead pipe in alignment.
17、The shield should be continuously checked for level and line and so adjusted as to minimize deviations. Ilard but resilient thrust plates (see Subclause 4.2 of SABS 1200 1.G) should be inserted between the abutting ends of the pipes to transfer the jacking force. Each thrust plate should be in the f
18、orm of a completc circle and of sufficient width to cover the end of each pipe completely. Ik-watering. De-watering of the ground through which the pipes are to be jacked, by well-pointing or other means, is essential if the watertable is above or near to invert level or if the soil is unstable when
19、 inundated. The following two reports illustrate the significance of this requirement: a) Contract XYZ Crossing No. 2 : 490 mm sewer in 1 500 mm ID sleeve: A collapse of the sand embankment into the lead pipe occurred on this job as a result of unsatisfactory de-watering (owing largely to casualness
20、 and inefficiency) during jacking. The resulting sinkhole between the railway tracks was backfilled from the surface. .1n addition, the finished position of the sleeve was off grade-line, being about 220 mm too high at the far side. Fortunately sufficient working space remained to allow the 490 nun
21、pipe to be installed to the critical design grade and to be tied down by mcans of brick walls. NOTE: A repair job, if necessary in future, will necessitate breaking out the brick walls. b) Contract XYZ Crossing No. 3 : 300 mm sewer in 1 200 mm (not 1 125 mm) sleeve: This job went well because effici
22、ent de-watering was carried out. The larger size sleeve was used mainly because it was more readily available. SADS 0120 : Part 5 2 Sectlon LG-l983 Pipe jacklng 3.1.6 Cxcavatlon of the Face1). As the jacking procceds, excavation In front of the pipe should normally be carried out from wlthin the shi
23、eld but the preclse method of excavdtlon will be determined by sol1 conditions. The face may be mlned uslng pricumatic tools or hand tools as may be nccessnry, and the excavated matcrlal loaded 111to sklps for transfer to the thrust pit. The face may need supFortlng by face boards and, when excdvati
24、ng, the mlner should exercise every care. 3.1.7 Checkng Lmc and Level1). Durlng excavation and jacklng frcquent checks on the Line and level should be made from a flxed reference and any adjustments made by using jacks lncorporated in the shield. 3.1.8 Settlements (Subclause 5.4.3.1) 3.1.8.1 In view
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205LG1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONLGPPDF

链接地址:http://www.mydoc123.com/p-1028616.html