SANS 10120-5 LE-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LE S.pdf
《SANS 10120-5 LE-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LE S.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 LE-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LE S.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SAUS 0120 : Part 5 section LE-1982 Stormwater drainage PART 5 : CONTRACT ADMINISTRATION SECTION LE CONTENTS Clause 1 . 1.1 2 . 2.1 2.2 3 . 3.1 3.1.1 3.1.
4、2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 4 . Page Number START OF CONSTRUCTION 1 General 1 . IMMEDIATELY AFTER THE IIANDING OVER OF THE SITE 1 Phasing of Work 1 Skewed Ends 1 . DURING CONSTRUCTION 1 Methods of Construction 1 General 1 Materials . 1 . Stoppihg of mechan
5、ical excavation above final invert 1 Excavation to below bottom of pipes 1 Prevention of unstable conditions 1 Dealing with water during laying and backfilling . 1 Backfilling of trenches 1 Road surfaces 1 . Administration 2 Using unreinforced in lieu of reinforced concrete pipes 2 . Program for des
6、ign details 2 . esting of stormwater drains 2 Measurement and brickwork 2 Corrugated metal culverts 2 . QUALITY CONTROL AND OTIIER CONSIDERATIONS 2 First Revision November 1982 This section of the code supersedes SABS 0120 : Part 5 : Section LE-1980 Approved by the COUNCIL OF TI1E SOUTli AFRICAN BUR
7、EAU OF STANDARDS SABS 0120 : Part 5 Section LE-1982 btormwater drainage SABS 1200 LE : STOHMWATEH DHAINALE NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the numberls) of the relevant clause(s) oL LABS 1200 LE. START OF CONSTRUCTIO
8、N GENERAL. For the purposes of this part of the code contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. IMMEDIATELY AFTER TIIE IlAIJDING OVER OF THE SITE PIIASING OF WORK. The program that is agreed for the sequence of constr
9、uction should be suh that both excavation and construction are free-draining at all tlmes. Stormwater drains are frequently constructed in trenches excavated below ground level, or through completed embankments, or in and through roads. Construction in tlre open is preferable for cast-in-situ culver
10、ts and tlre larger portal or rectangular culverts. The practicability of excavating through tinlshed embankments depends upon the size of the culvert and the embankment arid on local and climatic conditions that should be known to the engineer. lie should make known such information while the progra
11、m is bemg prepared. SWWED ENDS (Subclause 8.2.4(b). Immediately after handing over the site, the engineer should provide the contractor with a schedule of skewed ends, if any. DURING CONSTRUCTION METHODS OF CONSTRUCTION General. Pipes of the tlnest quality and complying with a standard specification
12、 can be ruined by improper handling and by improper bedding and backfilling. In calculating the strength of a pipeline, certain dssumptlons are made 111 the design criteria regarding trench width, type of bedding, and backfilling, and 1t is the purpose of 3.1.2 - 3.1.8 below to describe how optimum
13、conditions can be achieved in practice. Materials. Each plpe used should corrply with the applicable specification, should be protected during transportation and handling from damage caused by impact, dropping, etc., and should be inspected for defects immediately before laying. Faulty pipes or pipe
14、s that have suffered damage sufficient to affect their serviceability should not bc used in the work. Stopping-pf Mechanical Excavation-Above Final Invert. Where a pipe is to be bedded directly on a natural earth bed, i.e. on Class D bedding, the mechanical excavatiou of trenches should be stopped s
15、ufficiently above the final elevation of the bottom of the pipe to enable the pipe barrel to be laid on a firm undisturbed earth Led. If overdigging occurs, all loosened earth should be removed and the trench bottom brought back to grade with well-compacted material. Excavation to Relow Uott_om of P
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205LE1982CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONLESPDF

链接地址:http://www.mydoc123.com/p-1028614.html