SANS 10120-5 GF-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section GF P.pdf
《SANS 10120-5 GF-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section GF P.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 GF-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section GF P.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 5 Section GF-1984 Prestressed concrete Clause 1 . 1.1 2 . 2.1 2.2 3 . 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3
4、.1.11 3.1.12 3.1.13 3.1.14 3.1.15 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 4 . PART 5 : CONTRACT ADMINISTRATION SECTION GF CONTENTS Page Number START OF CONSTRUCTION General . IMMEDIATELY AFTER THE HANDING OVER OF THE SITE General Samples DURING CONSTRUCTION et hods of Construction Handling and
5、 lifting Safety Application of loads Tensioning procedure . Post-tensioning Jacking friction losses . construction problems tha Grouting vents . . . . . may require adjustments in des . . . . . . . . sumptions . . Injection of grout . Grouting during cold weather . spraycrete storage . Projecting re
6、inforcement . Keeping stored units free of water . Administration Tendons Anchorages and couplers . Pressure gauges for measuring tensioning force Safety of stagings. etc post-tensioning to permit movement of units strength of grout . Handling and placing . QUALITY CONTROL AND OTHER CONSIDERATIONS J
7、une 1984 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS SABS 0120 : Part 5 Section GF-1984 Prestressed concrete SABS 1200 GF : PRESTRESSED CONCRETE NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are. otherwise stated, the number(s) of the rele
8、vant clause(s) of SABS 1200 GF. START OF CONSTRUCTION unless GENERAL. For the purposes of this part of the code, contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. IMMEDIATELY AFTER THE HANDING OVER OF THE SITE GENERAG. The r
9、ecommendations of Section G should be applied, as relevant. SAMPLES. (Subclauses 3.4 and 3.5). The contractor should ascertain whether samples of anchorages or sheaths or both are required and if so, submit them without delay together with, in the case of anchorages, proof of satisfactory previous u
10、se. DURING CONSTRUCTION METHODS OF CONSTRUCTION Formork/Camber (Subclause 4.7). The specified vertical profile should be achieved by setting the formwork low or high as required, before concreting, to allow for changes in profile caused by deflection of formwork during concreting and by subsequent p
11、restressing and permanent loading. Unless already indicated on the drawings, details of the proposed profile should be calculated by the contractor and should be approved before construction commences. Observations should be made to determine whether the actual deflections correspond with the predic
12、ted deflections. If any significant discrepancies occur, the formwork settings for prestressed members still to be constructed should be adjusted accordingly. . - Handling (Subclause 4.8). Care should be taken to .avoid damage to units and adjoining structures during handling and lifting. Suitable p
13、recautions should be taken with regard to the following when prestressed units are transported: a) Distortion of the transporting vehicle; b) centrifugal force due to cornering; C) oscillation (a slim member might flex vertically or horizontally sufficiently to cause damage); d) the possibility of d
14、amage due to chafing. Safetv (Subclauses 5.2 and 5.4.1). In order to avoid costly delays and disruption of work due to a tendon failure, and for reasons of safety, when prestressing tendons have been stored on site for a prolonged period, the contractor should ensure by tests that the quality of the
15、 prestressing tendons has not been significantly impaired by corrosion, stress corrosion, loss of cross-sectional area or as a result of any mechanical damage. (See DD 81) .) Application of Loads (Subclauses 5.2 and 5.4.5). Transfer of prestressing force, whether partial or full, should be carried o
16、ut only after cube crushing tests have indicated an adequate concrete strength. Except where subsequent re-tensioning is to be applied, the prestressing of the concrete should be delayed as long as possible in order to minimize loss of tension due to concrete shrinkage and creep. In determining the
17、final jacking force and the resulting forces in the prestressing tendons, adequate and proper allowance should be made, in accordance with SABS 01002), for all factors that will contribute towards loss of prestress, for the prestressing system and for the properties of the prestressing steel being u
18、sed. Stressing of the tendons should be carried out with due care by experienced workmen and adequate steps taken to protect the workmen from injury. Proper records should be kept by the contractor of all stressing operations and, in the case of site stressing, a copy of the record (see Subclause 5.
19、4.5.1 (m) of SABS 1200 GF) , which should include wedge slip or slip-in measurements taken during anchoring, anchoring loads and extensions, should be handed to the engineer on each day during which stressing operations are carried out. The engineer will use these records and the prestressing force
20、diagram (see Subclause 5.4.5.1 of SABS 1200 GF) to check whether the tendons comply with the prestressing requirements. (See Subclause 3.2.2 of Section GF of Part 2 and Subclause 1.3.2.2 of Section GF of Part 3 of the code.) For factory stressing or for stressing remote from the works, copies of the
21、 stressing records should be furnished on demand. The engineer may order the contractor to cease any or all stressing operations where proper records are not being kept or where the operations are not being properly or safely carried out, and the contractor should take immediate steps to ensure that
22、, when the work is resumed, it is carried out to the satisfaction of the engineer. Tensioning Procedure (Subclause 5-4-51. A graph of stressing force or gauge readings should be plotted against expected tendon extensions before tensioning operations are commenced. The measured extensions should then
23、 be plotted on this graph as tensioning proceeds. Measurements of extensions should be regarded only as indirect indications of the tensioning force and as a check on that force. Calculations of extensions should be based on values of Youngs modulus provided by the contractor in terms of Subclause 3
24、.3 of SABS 1200 GF. Post-tensionin? (Subclauses 5.4.4 and 5.4.5) 3.1.6.1 In post-tensioning systems, tendons should preferably be inserted before concreting is carried out. 3.1.6.2 If the tendon is to be inserted after concreting, the contractor should dolly the sheath during the concreting process
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205GF1984CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONGFPPDF

链接地址:http://www.mydoc123.com/p-1028603.html