SANS 10120-3 LF-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section LF Erf c.pdf
《SANS 10120-3 LF-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section LF Erf c.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-3 LF-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section LF Erf c.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SARS 0120 : Part 3 Section LF-1983 Erf connections (water) PART 3 : GUIDANCE FOR DESIGN SECTION LF CONTENTS Clause Page Number PRE-TENDER CONSIDERATIONS
4、I Investigations l . Access to properties 1 Meters . i Administration 1 Access 1 Tenders . 1 Dociimentation 1 Project specification clauses and scheduling . 1 Pipes for erf connections . 1 Metcrs 1 DESIGN REQUIREMENTS . 1 General Projects . 1 . . Polyethylene pipes 1 Advantages of radiused erf conne
5、ctions . l Service connections for major consumers 2 Examples of erf connection layouts . 2 APPI, ICABILITY OF OTHER CODES . 2 TEST PROCEDURES 2 QUALITY CONTROL AND OTHER CONSIDERATIONS . 2 DRAWINGS Drawing LY.3.1 . Erf Connection : Typical General Arrangement . 3 Drawing LF.3.2 . Radiused Erf Conne
6、ction : Positioning of Ferrule . 4 Drawing LF.3.3 . Brf Connection to Single Property (Subeconomic) 5 Drawing LF.3.4 . Erf Connection shared by Two Properties (Subeconomic) 6 Drawing LF3.5 . Detajl of Typical Meter/St.op Tap Assembly (subeconomic) 7 June 1983 Approved by the COUNCIL OF TIIE SOUTtl A
7、FRICAN BUREAU OF STANDARDS SADS 0170 : Part 3 Section LP-19113 Erf connections (water) SABS l200 LF : ERF CONNECTTONS (WATER) NOTE: The clause number(s) given at the beginning or aftor the heading of a clause is/arc, unless otherwise stated, the number(s) of the relevant clause(s1 of SABS 1200 LF. P
8、HE-TENUER CONSIDERATIONS Access 1.0 Properties (Subclause 5.2.1). Where the stop tap and meter are to be installed, on private property, ascertain the name(s) of the owner(s) and the occupier(s) of each erf affected. Meters (Subclause 3.5). Ascertain whether the controlling authority has any standar
9、d or prcfercnce as to the type and make of meter to be installed. ADMINISTRATION Access. Under circumstances such as those described in 1.1.1 above, submit a list of occupiers and a suitable number of circular letters to the employer with a request that he obtain permission for a contractor to enter
10、 onto each erf to carry out the work. Draft the circular letters in such a manner that no diff.culties or delays will occur when the contractor delivers the notices reierred to in Subclause 5.2.1 of SABS 1200 LF. Tenders. Ensure that before the start of construction action has been taken in respect
11、of the applicable of the matters set out in Subclause 3.1 of Section 0. DOCUMENTATION Project Specification Clauses and Scheduling. See Section LF of Part 2 of the code. Pipes for Erf Connections (Subclauses 3.1 and 3.3). Where the contractor is not to be allowerl a free hand to select from the mate
12、rials specified in Subclause 3.1 of SABS 1200 LF, ensure that the schedule states clearly the material to be used for the pipes and fittings of erf connections. Where, lecause of the presence of corrosive soils or of risks of spillage in certain industries, more expensive materials are required, set
13、 out the requirements in the project specification (see Subclause 2.l(a) of Section LF of Part 2 of the code). Meters (Subclauses 3.2.2, 5.7.2, and 7.3). Except in the case of new townships, local and other authorities usually prefer to specify and/or supply meters of a make and type already in use
14、in other areas under their control, in order to simplify maintenance and reading pxocedures. Where this is the case a) take action as set out in Subclause 3.2.4 of Section A of Part 2 of the code; b) include in the project specification a clause that will relieve the contractor of responsibility in
15、terms of Subclauses 3.2.2 and 7.3.1 (but not 7.3.2) of SABS 1200 LP and that will suitably amend Subclause 0.2.4 of SABS 1200 LE. (See also Suhclause 2.2 of Section LF of Part 5 of the code.) C) Typically, in addition to providing the data required in terms of Subclause l.l(d) of Section LF of Part
16、2 of the code, a domestic meter (other than a digital display meter) may be specified as follows: Domestic meters shall be of the semi-positive type, shall have a rotary piston and a dry dial or a sealed liquid-filled head, shall be of a cyclometer pattern, and shall conform to the regulations gover
17、ning water meters published in terms of the Trade Metrology Act, 1973 (Acg 77 of 1973). The meters shall be suitable for operating with water at temperatures of up to 50 C and at working pressures of up to 1,0 MPa. DESIGN REQUIREMENTS GENERAL PROJECTS Polyethylene Pipes (Subclause 3.1.4). Polyet-hyl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101203LF1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART3GUIDANCEFORDESIGNSECTIONLFERFCPDF

链接地址:http://www.mydoc123.com/p-1028536.html