SANS 10120-2 MH-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section MH Asp.pdf
《SANS 10120-2 MH-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section MH Asp.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-2 MH-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section MH Asp.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 01 20-2 Section MH:1996 Asphalt base and surfacing First revision Part 2 : Project specification, Portion 2 Section MH Contents Page 1 Essential pro
4、ject specification clauses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 Essentialdata 1 3 Additionalclauses . 1 3.1 General . 1 3.2 Normalprojects . l 3.2.1 Typeofaggregate . l 3.2.2 Sandequivalentvalue l 3.2.3
5、Shapeofaggregates . 1 3.2.4 Narrowstrips . 2 3.2.5 Trialsections . :. 2 3.2.6 Joints . “ 2 3.2.7 Mixdesign 2 3.2.8 Densitytesting 2 3.3 Prestigeprojects 2 3.4 Subeconornic projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . .
6、 . . . . . . . . . . 2 This section of the code supersedes SABS 0120-2 : Section MH:1981 Approved by the PRESIDENT OF THE SOUTH AFRICAN BUREAU OF STANDARDS CODE OF PRACTICE SABS 0120-2 : Section MH:1996 SABS 1200 MH : Asphalt base and surfacing NOTES 1) Number the PSMH clauses in portion 2 of the pr
7、oject specification in the sequence in which the clauses to which they relate appear in SABS 1200 MH. 2) The clause number(s) given in brackets at the beginning or after the heading of a clause idare, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 MH. 1 Essentlaf proje
8、ct specification clauses Certain subclauses of the specifications refer to requirements that must be stated in the project specification. Set out as indicated below suitable clauses in portion 2 of the project specification, to provide the essential information. a) (3.5.2) Specify whether dolomite,
9、felsite or norite may be used (see also 3.2.1). b) (5.2) Specify whether a prime coat is required. c) (5.4) Specify whether a tack coat is required. d) (5.5.2) Where open-graded asphalt is required, specify the composition and voids. (See 2.3.1 and 2.5 of section MH of SABS 0120-3). e) (6.3.3) Speci
10、fy the width of base and surfacing unless the information is given on the drawings. 2 Essential data The availability of certain essential data could affect the prices tendered. Except where such data have been given in the schedule or in the tender drawings, set out suitable clauses covering items
11、such as the following, in portion 2 of the project specification: (Clause 1) Specify which type of asphalt is to be used. (3.1) Specify which type of prime is to be used. (3.4) Specify which type and grade of tar are to be used or which grade of bitumen is to be used. (3.5.8 and 4.5) Specify whether
12、 pre-coated chips are to be used and, if so, specify the size of stone to be used. (5.3) Specify whether a curing coat is required. (5.5.6) Specify whether a mineral filler is required. (5.9) If required, specify joints at an angle other than a right angle to the centre-lines. Additional clauses 3.1
13、 General Where it is necessary to amplify or otherwise to vary the terms of SABS 1200 MH to render them suitable for use in projects to be carried out in particular locations or under particular circumstances, include suitable PSMH clauses in portion 2 of the project specification to deal with matte
14、rs in addition to those covered by clauses 1 and 2. 3.2 Normal projects NOTE - To meet requirements imposed by various norms of economic development, projects are classified as normal, prestige, subeconomic, and labour-based projects (see clause 4 of the Introduction to SABS 0120-3). 3.2.1 Type of a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101202MH1996CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART2PROJECTSPECIFICATIONSECTIONMHASPPDF

链接地址:http://www.mydoc123.com/p-1028504.html