SAE USCAR-27-2007 Specification for Testing Gas Discharge Light Source Subsystem《试验气体放电光源子系统规格》.pdf
《SAE USCAR-27-2007 Specification for Testing Gas Discharge Light Source Subsystem《试验气体放电光源子系统规格》.pdf》由会员分享,可在线阅读,更多相关《SAE USCAR-27-2007 Specification for Testing Gas Discharge Light Source Subsystem《试验气体放电光源子系统规格》.pdf(56页珍藏版)》请在麦多课文档分享上搜索。
1、 Specification for Testing Gas Discharge Light Source Subsystem SAE/USCAR-27 October 2007 ISBN: 978-0-7680-1976-6 _ The research data, analysis, conclusion, opinions and other contents of this document are solely the product of the authors. Neither the Society of Automotive Engineers, Inc. (SAE) nor
2、 the United States Council for Automotive Research (USCAR) certifies the compliance of any products with the requirements of nor makes any representations as to the accuracy of the contents of this document nor to its applicability for purpose. It is the sole responsibility of the user of this docum
3、ent to determine whether or not it is applicable for their purposes. Copyright 2007 USCAR Printed in U.S.A. All rights reserved. QUESTIONS REGARDING THIS DOCUMENT: (248) 273-2470 FAX (248) 273-2494 TO PLACE A DOCUMENT ORDER: (724) 776-4970 FAX (724) 776-0790 SAE/USCAR-27 Issued 2007-10 SPECIFICATION
4、 FOR TESTING GAS DISCHARGE LIGHT SOURCE SUBSYSTEM SUMMARY OF CONTENTS 1 SCOPE .3 2 SAFETY PRECAUTIONS3 2.1 HIGH VOLTAGE IDENTIFICATION/LABELING .4 3 REFERENCE STANDARDS.4 4 DIAGRAMS AND DEFINITIONS 6 4.1 APPENDICES.6 5 GENERAL REQUIREMENTS .6 5.1 RECORD RETENTION.6 5.2 SAMPLE DOCUMENTATION AND RETEN
5、TION.7 5.3 POWER SOURCES7 5.4 EQUIPMENT TOLERANCES .8 5.5 MEASUREMENT ACCURACY.8 5.6 TEST REPEATABILITY AND CALIBRATION.9 5.7 TEST DEFAULT CONDITIONS9 5.8 TEST SHARING WITHIN LIGHT SOURCE FAMILIES.9 5.9 TEST FAILURE PROCEDURE.10 5.10 CONTROL PLANS 10 5.11 RELIABILITY PROGRAMS AND METHODS 10 5.12 HAZ
6、ARDOUS MATERIAL RESTRICTION 11 6 ENVIRONMENTAL .13 6.1 TEMPERATURE SOAK13 6.2 THERMAL SHOCK IN AIR (TS)14 6.3 THERMAL SHOCK WATER .16 6.4 POWER TEMPERATURE CYCLE TEST. 18 6.5 SALT FOG/SPRAY.20 SAE/USCAR-27 Issued 2007-10 SPECIFICATION FOR TESTING GAS DISCHARGE LIGHT SOURCE SUBSYSTEM - 2 - 6.6 HUMIDI
7、TY 21 6.7 ALTITUDE 27 6.8 DUST27 6.9 WATER SPRAY29 6.10 FLUID RESISTANCE 30 7 MECHANICAL 31 7.1 STEADY STATE LOADS (CRUSH)31 7.2 VIBRATION 32 7.3 MECHANICAL SHOCK.35 7.4 FREE FALL (DROP).35 8 ELECTRICAL36 8.1 JUMP START (OVER-VOLTAGE) AND REVERSE POLARITY.36 8.2 BATTERY VOLTAGE DROPOUT.37 8.3 SUPERI
8、MPOSED ALTERNATING VOLTAGE .38 8.4 SHORT CIRCUIT39 8.5 OPEN CIRCUIT 40 8.6 ISOLATION.41 8.7 INPUT CURRENT SURGE.42 8.8 STEADY STATE INPUT POWER.42 8.9 LEAKAGE CURRENT.43 8.10 ELECTROMAGNETIC COMPATIBILITY.43 8.11 AUTOMATIC RE-START / SYSTEM INTERLOCK44 8.12 REDUCED VOLTAGE OPERATION.45 8.13 NOISE .4
9、5 8.14 CONNECTOR TESTS.46 9 PHOTOMETRICS .46 9.1 LIFE / LUMEN / COLOR MAINTENANCE however, all interfaces, connectors and wiring must be exposed. SAE/USCAR-27 Issued 2007-10 SPECIFICATION FOR TESTING GAS DISCHARGE LIGHT SOURCE SUBSYSTEM - 14 - 6.1.2 Procedure 1) Mount the GDLS on the fixture using t
10、he devices attachment points. No component of the GDLS shall come into contact with the chamber surfaces. 2) Power the GDLS for 1 minute at 13.5 Vdc. 3) Remove power from GDLS during temperature soak. 4) Set chamber settings to Tmaxand a maximum 50% relativity humidity and allow to stabilize. 5) Soa
11、k at Tmaxfor 96 hours. 6) At the end of the 96 hour soak, power the GDLS for 1 minute at 16.0 Vdc. 7) Remove power from GDLS. 8) Allow to cool to room temperature. 9) Lower the chamber temperature to Tmin. and allow to stabilize. 10) Soak at Tminfor 24 hours. 11) At the end of the 24 hour soak, powe
12、r the GDLS for 1 minute at 9.0 Vdc. 12) Remove power from GDLS. 13) Allow the chamber to reach room temperature. 14) Power the GDLS for 1 minute at 13.5 Vdc. 6.1.3 Acceptance Criteria 1) The GDLS shall not show any evidence of visible fractures, warpage or deformation. 2) The light source shall illu
13、minate continuously each time it is powered. 6.2 THERMAL SHOCK IN AIR (TS). 6.2.1 Purpose The GDLS shall be designed to withstand thermal stresses due to power cycling and rapid changes in ambient temperature without degradation in performance. The Discharge Light Source may be mounted in a lamp hou
14、sing or otherwise protected during this testing; however, all interfaces, connectors and wiring must be exposed. This is an accelerated test to evaluate failure mechanisms, which may be driven by mismatches in coefficients of thermal expansion. 6.2.2 Test and Measurement Apparatus 1. Environmental C
15、hamber (circulating air type) #1 TMin= -40 C 2. Environmental Chamber (circulating air type) #2 TMax= 105 C SAE/USCAR-27 Issued 2007-10 SPECIFICATION FOR TESTING GAS DISCHARGE LIGHT SOURCE SUBSYSTEM - 15 - The environmental chambers shall be capable of maintaining the atmosphere at the appropriate t
16、emperature for the test in any region where the specimen is placed. The absolute humidity in the chambers shall not exceed 20 g/m3 The volume of the chambers and the air velocity shall be such that after insertion of the test specimens, the temperature within the chambers shall be within the specifi
17、ed tolerance after a time of not more than 10% of the exposure time. The air in the chambers shall be circulated. Air velocity measured close to the test specimen shall be not less than 2 m/s. 3. Power Source 4. GDLS Mounting Fixture The GDLS shall be tested using mounting or supports with low therm
18、al conduction, such that for practical purposes the specimen is thermally isolated. When testing several specimens simultaneously they shall be so placed that free circulation should be provided between specimens and between chamber surfaces. The Discharge Light Source may be mounted in a lamp housi
19、ng or otherwise protected during this testing; however, all interfaces, connectors and wiring must be exposed. 6.2.3 Procedure. Reference IEC 60068-2-14 Na. Upon agreement, this test can be performed during the development process without a case (or with a modified case). 1. Test Chamber #1 and #2 s
20、hall be stabilized to TMinand TMaxrespectively, prior to inserting test specimens. 2. The GDLS shall soak at TMinfor 10 minutes and then transferred to test chamber #2. 3. Transfer time between chambers shall not exceed 30 seconds. 4. The GDLS shall soak at TMaxfor 20 minutes. 5. Repeat steps 2 thro
21、ugh 4 for a minimum number of 300 cycles. (refer to Table Combined Thermal Shock / Power Temperature Cycling) 6. Lamp and ballast shall be energized once daily for 10 minutes at 105 C and once daily at 40 C for the last 2 minutes of the 10 minute soak. 7. Test shall be stopped if light source fails
22、to illuminate when energized. 6.2.4 Acceptance Criteria. The light source shall illuminate each time it is operated and at the completion of the test. SAE/USCAR-27 Issued 2007-10 SPECIFICATION FOR TESTING GAS DISCHARGE LIGHT SOURCE SUBSYSTEM - 16 - 6.3 THERMAL SHOCK WATER 6.3.1 Purpose. To verify th
23、e GDLS functionality after exposure to sudden changes in temperature after a cold water splash on a hot system/component. The aim is to simulate driving through water in the wintertime. This applies to GDLS devices that lie in the splash area, (e.g. ballast mounted external to the lamp assembly). 6.
24、3.2 Test and Measurement Apparatus 1. Spray Chamber 2. Spray Nozzle (Reference ISO WD 16750-4 N142) Jet specification: Slot jet, see Figure 13. Width of jet slot: 1.2 mm Length of jet 220 mm Water flow: (1.00 to1.33) l/s 3. Test Fluid de-ionized water with 3% fine Arizona dust according to ISO 12103
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEUSCAR272007SPECIFICATIONFORTESTINGGASDISCHARGELIGHTSOURCESUBSYSTEM 试验 气体 放电 光源 子系统 规格 PDF

链接地址:http://www.mydoc123.com/p-1028394.html