1、 SAE/USCAR24-2April 2013USCAR Inflator Technical Requirements and ValidationISBN: 978-0-7680-8013-1 _ The research data, analysis, conclusion, opinions and other contents of this document are solely the product of the authors. Neither the SAE International (SAE) nor the United States Council for Aut
2、omotive Research (USCAR) certifies the compliance of any products with the requirements of nor makes any representations as to the accuracy of the contents of this document nor to its applicability for purpose. It is the sole responsibility of the user of this document to determine whether or not it
3、 is applicable for their purposes. Copyright 2013 USCAR Printed in U.S.A. All rights reserved. QUESTIONS REGARDING THIS DOCUMENT: (248) 273-2470 FAX (248) 273-2494 TO PLACE A DOCUMENT ORDER: (724) 776-4970 FAX (724) 776-0790 AEROSPACE SAE/USCAR-24 REVISION 2 Issued 2004-06 Revised 2013-04 USCAR INFL
4、ATOR TECHNICAL REQUIREMENTS AND VALIDATION SUMMARY OF CONTENTS 1. INTRODUCTION: 6 1.1 Scope: . 6 1.2 Preface Definitions: . 6 1.3 Changes to this Document: . 7 2. APPLICABLE DOCUMENTS: . 7 3. REQUIREMENTS: 8 3.1 General Requirements: . 8 3.1.1 General: . 8 3.1.2 Quality: 8 3.1.3 Production Requireme
5、nts: . 8 3.1.4 Reliability: 8 3.1.5 Heavy Metal Compounds Reporting and Recycleability Requirements: . 8 3.1.6 Informational Requirements: . 8 3.2 Functional Requirements: . 10 3.2.1 General Inflator Requirements: . 10 3.2.2 Inflator Structural Integrity: 10 3.2.3 Effluents: . 11 3.2.4 Inflator Flam
6、ing: 16 3.2.5 Autoignition, High Temperature Oven Performance/Autoignition of Heat Aged Inflators: 18 3.2.6 Sequential Test Series: . 19 3.2.7 Inflator Performance and Variability Limits: . 20 3.2.8 Propellant Stability: 22 3.2.9 Hermeticity: . 23 3.2.10 Dual Stage Inflator(s) - Additional Requireme
7、nts: . 24 4. VALIDATION: 24 4.1 Design Verification/Production Validation Report Format: 25 4.2 Deviations From Test Procedure: . 25 4.3 Design Verification Process: . 25 4.3.1 DV Program Sequence: 25 4.3.2 DV Test Plan: 26 4.4 Production Validation Process: . 26 4.4.1 PV Program Sequence: 26 4.5 Va
8、lidation Tests a) shall not leak per Section 5.2.3.1, Leak Test, b) shall Maintain a bridgewire resistance as specified in the USCAR Initiator Specification of current issue, or as approved by the Responsible Vehicle Engineering Organization. In addition those inflators deployed in a tank, or open a
9、ir: c) shall deploy as intended per Section 5.2.3.7, Closed Tank Test or Section 5.2.3.6, Open Air Test, d) should meet the tank wash requirements as indicated in the Appendix B, DV/PV Validation Test Matrix, and Section 3.2.3.3 Inflator Particulate (Tank wash derived), and e) shall meet all require
10、ments of Section 3.2.7, Inflator Performance and Variability Limits where ballistic curves are obtained. f) Shall not show any loss in the measured strength or ballistic integrity of the propellant as demonstrated by ballistic performance and/or accepted break or crush strength measurement methods o
11、f live tear down inflators. (Limited dusting that does not appreciably affect ballistic performance is excepted) 3.2.6.1 Inflator Thermal Shock Resistance: a) Expose inflators to 200 cycles of -40 C to +90 C thermal shock profile as specified in Section 5.2.4.8.1, Inflator Thermal Shock Resistance T
12、est. 3.2.6.2 Inflator Dynamic Shock Resistance: Expose inflators to the dynamic shock profile specified in Section 5.2.4.8.2, Dynamic Shock Test. 3.2.6.3 Inflator Drop Resistance: Expose Inflators to the drop environments specified in Section 5.2.4.8.6, Drop Test. 3.2.6.4 Inflator Vibration/Temperat
13、ure Resistance: a) Expose inflators to the vibration and temperature profiles specified in Section 5.2.4.8.3, Vibration - Temperature Cycle Test. 3.2.6.5 Inflator Salt Spray Resistance: Expose inflators to the salt spray profile specified in Section 5.2.4.8.5, Salt Spray Test. 3.2.6.6 Inflator Humid
14、ity Resistance: a) Expose inflators to the humidity profile specified in Section 5.2.4.8.4, Humidity Resistance Test. SAE/USCAR-24 REVISION 2 Revised 2013-04 USCAR INFLATOR TECHNICAL REQUIREMENTS AND VALIDATION - 20 - 3.2.7 Inflator Performance and Variability Limits: When Inflators are conditioned
15、per Section 5.2.3.7, Closed Tank Test of this document, placed in a closed tank filled with ambient air at room temperature and pressure, and activated using a minimum of the “All-Fire“ current of the initiator in use, the Inflator requirements of this section shall be met. 1. Closed tank inflator c
16、urves per the following shall be provided to the Responsible Vehicle Engineering Organizations by the Inflator Supplier for all validation tests: a) Baseline deployments at each temperature (full and first stage output for dual stage inflators); Scatter plots for each group with overlays of the mean
17、 curve, 3 curves and performance windows. b) Environmentally conditioned inflators deployed at each temperature; Comparison plot for each group with overlays of the mean curve and performance windows. c) Data tables showing performance against the specified windows established in Table 3.2.7.A, Infl
18、ator Variability Limits, and Table 3.2.7.B, Ballistic Variability Limits . 2. The tolerances shown in Table 3.2.7.A, Inflator Variability Limits, and Table 3.2.7.B, Ballistic Variability Limits shall be met at room temperature, hot temperature, and cold temperature by the baseline inflators full and
19、 staged output(s) ( 3 of the mean of the baseline deployment groups at each temperature, shall fall within each defined window excepting TTFG) when deployed as specified in Section 5.2.3.7, Closed Tank Test. (Refer to Appendix F for examples.) TTFG shall be evaluated based on attributes of each indi
20、vidual curve. 3. The tolerances shown in Table 3.2.7.A, Inflator Variability Limits, and Table 3.2.7.B, Ballistic Variability Limits shall be met at room temperature, hot temperature, and cold temperature by each individual inflator curve (for full and first stage deployments for dual stage inflator
21、s) after inflator exposure to environments (the individual ballistic curves of each inflator shall fall within each defined window) as specified in the Section 5, Test Requirements when deployed as specified in Section 5.2.3.7, Closed Tank Test. (Refer to Appendix F for examples.) 4. A program speci
22、fic closed tank mean curve shall be determined by the Responsible Vehicle Engineering Organizations from an appropriate baseline inflator tank deployment series such as the baseline tests of the PV or other as determined by the Responsible vehicle Engineering Organization. For dual stage inflators f
23、ull output and/or first stage output should be chosen for evaluation based on program specific needs by the Responsible vehicle Engineering Organization. Ongoing production Lot Acceptance Tests shall be measured against the tolerances determined from Table 3.2.7.A, Inflator Variability Limits, and T
24、able 3.2.7.B, Ballistic Variability Limits for the vehicle specific baseline mean curve. Each individual Lot Acceptance Tests inflator curve shall fall within each defined window. Where individual inflator curves do not fall with in each established window a minimum of fifteen additional (15) sample
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEUSCAR242013USCARINFLATORTECHNICALREQUIREMENTSANDVALIDATIONREVISION2PDF

链接地址:http://www.mydoc123.com/p-1028391.html