SAE J 1469-2009 Air Brake Actuator Test Procedure Truck-Tractor Bus and Trailers《卡车-牵引车 公共汽车和挂车的空气制动传动装置试验规程》.pdf
《SAE J 1469-2009 Air Brake Actuator Test Procedure Truck-Tractor Bus and Trailers《卡车-牵引车 公共汽车和挂车的空气制动传动装置试验规程》.pdf》由会员分享,可在线阅读,更多相关《SAE J 1469-2009 Air Brake Actuator Test Procedure Truck-Tractor Bus and Trailers《卡车-牵引车 公共汽车和挂车的空气制动传动装置试验规程》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、_SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising theref
2、rom, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be reaffirmed, revised, or cancelled. SAE invites your written comments and suggestions. Copyright 2009 SAE International All rights reserved. No part of this publication ma
3、y be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: 724-776-4970 (outside USA)
4、Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.orgSURFACEVEHICLERECOMMENDEDPRACTICEJ1469 FEB2009 Issued 1988-06Revised 2009-02 Superseding J1469 JUN2006 Air Brake Actuator Test Procedure, Truck-Tractor, Bus, and Trailers RATIONALENew changes addressed requests to incr
5、ease the Salt Spray Requirements, add Vacuum Requirements to Boot Seal Validation, allow longer pressure stabilization times during leak testing, add allowable cooling time between mechanical release test cycles, allow optional 5 Gallon Air Tank reservoir for pressure decay leak testing, standardize
6、 incremental measurements to 5 mm (0.20 in), and add Arctic temperature Leakage and Operational testing to allow the SAE J1450 specification to be suspended or cancelled. 1. SCOPE This SAE Recommended Practice provides procedures and methods for testing service, spring applied parking, and combinati
7、on brake actuators with respect to durability, function, and environmental performance. A minimum of five test units designated A, B, C, D, and E are to be used to perform all tests per 1.1 and 1.2. 1.1 Test Procedures Leak rate-parking and service chambers (Section 4) Chamber volume-parking and ser
8、vice chambers (Section 5) Maximum release and hold-off pressure-parking chamber (Section 6) Minimum Pressure ResponseService Chambers (Section 7) Force output and stroke-parking chamber (Section 8) Force output and stroke-service chamber (Section 9) Low temperature leakage-parking and service chambe
9、rs (Section 10) Low temperature maximum release and hold-off pressure (Section 11) Low temperature force output-parking chamber (Section 12) Low temperature operational test-service chamber (Section 13) Corrosion resistance-parking and service chamber (Section 14) Mechanical back-off release mechani
10、sm (Section 15) Proof pressure test-parking and service chambers (Section 16) Cycle test-parking chamber (Section 17) Cycle test-service chamber (Section 18) Elevated temperature cycle test-parking and service chambers (Section 19) Vibration test (Section 20) Arctic temperature leakage service chamb
11、er (Section 21) Arctic temperature operational test service chamber (Section 22) Copyright SAE International Provided by IHS under license with SAENot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SAE J1469 Revised FEB2009 Page 2 of 241.2 Test Sequence Chart The test
12、 sequence as charted in the “Test Sequence Chart” shall be mandatory (see Figure 1). 1.3 Purpose This document provides uniform procedures and methods for laboratory testing of brake actuators used in air brake systems. FIGURE 1 - TEST SEQUENCE CHART NO.ABCDEABCDEABCDE4XXXXXXXXXXXXXXX5XXX6XX7XXPark8
13、XXXXXXXXXXService9XXXXXXXXXX10XXX11XX12XX13XX14XXXMechBack-OffRelease(whenapplicable)15XXXX16XXXPark17XXXXXXService18XXXXXX19XXX20XXX21XXX22XXXTESTSFOR COMBINATIONSTESTUNITDESIGNATIONTESTS FORSERVICECHAMBERS ONLYTESTUNITDESIGNATIONTESTS FORPARKING CHAMBER ONLYTESTUNITDESIGNATIONArtic TempLeakageArti
14、cTemp OperationalTestProcedureSectionCorrosionProof PressureElevatedTemp TestVibrationForce Outoutand StrokeCycle TestLeakageRateChamberVolumeMaxReleasethen pneumatically cycle the parking chamber from the fully released to 75% 5% of its rated stroke (75% 5% stroke to zero stroke and back to 75% 5%
15、stroke position) while maintaining 70 C 3 C (158 F 5 F) by applying 0 to 690 kPa 35 to 0 kPa (0 to 100 lbf/in2 5 to 0 lbf/in2) (gage) air pressure at a rate of 6 cycles/min minimum for 22 h. 19.1.3.3 Repeat procedure specified in 19.1.3.2 four times to accumulate a total of 96 h and a minimum of 30
16、000 cycles. 19.1.3.4 After cycling, leak test the parking chamber per 4.1. 19.2 Service Chamber 19.2.1 Conditions 19.2.1.1 Same as those set forth in 19.1.1 except the test units spring chamber is to be caged pneumatically or mechanically during testing (if applicable). 19.2.2 Test Equipment 19.2.2.
17、1 Same as specified in 19.1.2. 19.2.3 Test Procedure 19.2.3.1 Connect the service chamber air port to the pneumatic circuit. 19.2.3.2 Soak test unit for 2 h at 70 C 3 C (158 F 5 F), then pneumatically cycle the service chamber from the fully released to the 75% 5% of its rated stroke position (75% 5
18、% stroke to zero stroke and back to 75% 5% stroke position) while maintaining 70 C 3 C (158 F 5 F) by applying 0 to 690 kPa 35 to 0 kPa (0 to 100 lbf/in2 5 to 0 lbf/in2) (gage) air pressure at a rate of six cycles/min minimum. Copyright SAE International Provided by IHS under license with SAENot for
19、 ResaleNo reproduction or networking permitted without license from IHS-,-,-SAE J1469 Revised FEB2009 Page 20 of 2419.2.3.3 Repeat procedure specified in 19.2.3.2 four times to accumulate a total of 96 h and minimum of 30 000 cycles. 19.2.3.4 After cycling, leak test the service chamber per 4.2. 20.
20、 VIBRATION TEST NOTE: This procedure provides uniform test methods for evaluating “Service” and “Combination” air brake actuators for resistance to vibration fatigue damage. 20.1 Conditions 20.1.1 27 C 11 C (80 F 20 F) ambient temperature. 20.1.2 Pneumatically or mechanically cage the test units spr
21、ing chamber (if applicable). 20.1.3 The brake actuator may be tested with its “pushrod” and “service chamber return spring” removed from the assembly. 20.1.4 If the unit is tested with the “pushrod” and “service chamber return spring” installed, pushrod “tie-down” fixturing shall be employed (see Fi
22、gures 6 and 7). 20.2 Test Equipment 20.2.1 WarningAdequate shielding and/or isolation of the test unit shall be provided during vibration testing to protect operators and all personnel and property in the area of testing. 20.2.2 Vibration equipment capable of providing a sinusoidal acceleration inpu
23、t. 20.2.3 Calibrated equipment capable of monitoring the following parameters: 20.2.3.1 Input acceleration (Peak Gs) 20.2.3.2 Vibration test frequency (Hz) FIGURE 6 - MOUNTING Copyright SAE International Provided by IHS under license with SAENot for ResaleNo reproduction or networking permitted with
24、out license from IHS-,-,-SAE J1469 Revised FEB2009 Page 21 of 24FIGURE 7 - MOUNTING 20.2.3.3 Output acceleration (Gs) or “transmissibility” (ratio of the output acceleration at the test unit versus input acceleration at the axle section or base fixturing). 20.2.3.4 Number of total vibration cycles a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEJ14692009AIRBRAKEACTUATORTESTPROCEDURETRUCKTRACTORBUSANDTRAILERS 卡车 牵引车 公共汽车 挂车 空气 制动 传动 装置 试验 规程

链接地址:http://www.mydoc123.com/p-1026342.html