SAE ARP 6275-2014 Determination of Cost Benefits from Implementing an Integrated Vehicle Health Management System《实施综合车辆健康管理系统的成本效益的测定》.pdf
《SAE ARP 6275-2014 Determination of Cost Benefits from Implementing an Integrated Vehicle Health Management System《实施综合车辆健康管理系统的成本效益的测定》.pdf》由会员分享,可在线阅读,更多相关《SAE ARP 6275-2014 Determination of Cost Benefits from Implementing an Integrated Vehicle Health Management System《实施综合车辆健康管理系统的成本效益的测定》.pdf(34页珍藏版)》请在麦多课文档分享上搜索。
1、_SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising theref
2、rom, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions.Copyright 2014 SAE International All rights reserved. No part of this pub
3、lication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: +1 724-776-4970
4、(outside USA) Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.orgSAE values your input. To provide feedback on this Technical Report, please visit http:/www.sae.org/technical/standards/ARP6275AEROSPACERECOMMENDED PRACTICEARP6275Issued 2014-07 Determination of Cost Bene
5、fits from Implementing an Integrated VehicleHealth Management System RATIONALEThis SAE Aerospace Recommended Practice (ARP) provides insight into the factors to be considered for not only generating a cost benefit analysis but also the justification for implementing an integrated health management s
6、ystem to an air vehicle. With the considerable advancement of prognostics and health management (PHM) tools and capabilities in the past 10 years, more and more operators and fleet managers are asking for ways in which the overall value proposition of installing such a system, be it on in-service eq
7、uipment or still-in-design systems, can be determined. TABLE OF CONTENTS 1. SCOPE 41.1 Purpose . 41.2 Approach . 42. REFERENCES 42.1 Applicable Documents 42.1.1 SAE Publications . 42.1.2 Other Documents 53. ACRONYMS . 54. INTRODUCTION. 64.1 Motivation for Implementing an Integrated Health Management
8、 System . 64.2 Fundamental Considerations Preceding the Cost Benefit Analysis . 75. FACTORS INFLUENCING COST BENEFIT STUDIES AND ANALYSES 85.1 PHM System Complexity 85.2 Usage: The Considerations and Differences between Categories of Operators . 85.3 Legacy versus New Platforms 95.4 Impact on Design
9、 105.5 Performance versus Reliability or Sustainment 105.6 Cost Savings versus Cost Avoidance . 116. COSTS FOR CONSIDERATION IN AN AIRCRAFT PHM COST BENEFIT STUDY 116.1 Impact on Cost and Weight . 116.2 PHM System Scope and Complexity 136.2.1 Data Generation and Acquisition 136.2.2 Data Recording .
10、136.2.3 Data Format Compatibility 136.2.4 On-board versus Off-board. 146.2.5 Vehicle/Platform Integration 146.2.6 Communications (including Satellite and Other Relay Provisions) 146.2.7 Ground Station 14SAE INTERNATIONAL ARP6275 Page 2 of 34 6.2.8 Data Storage and Archiving 146.2.9 Information Deliv
11、ery 156.2.10 Data Security . 156.2.11 Software (including Software Maintenance) . 156.2.12 System Availability 156.2.13 Technical Support and Training for Users 156.2.14 Continuous Upgrades . 156.3 Development Costs . 166.3.1 Requirements Definition 166.4 Build and Qualification Costs 176.5 Producti
12、on Costs . 176.6 Operational Costs . 176.6.1 Labor for Data Handling, Analysis, Storage, Back-Up and Transmission 176.6.2 Data Transmission and Storage Costs . 176.6.3 Additional Fuel Costs 186.6.4 Unnecessary Maintenance Due to PHM System “False Alarms” . 186.7 PHM System Sustainment Costs 186.7.1
13、PHM System Training . 186.7.2 PHM System Upgrades 196.7.3 PHM System Maintenance . 196.8 Aftermarket Impact on Costs 196.8.1 Increased On-wing Component Life . 196.8.2 Removing Components Before They Actually Fail . 197. BENEFITS FOR CONSIDERATION IN AN AIR VEHICLE PHM COST BENEFIT STUDY . 207.1 Fue
14、l Savings . 207.1.1 Fewer Mission Aborts, Air turn-backs, Diversions 207.1.2 Increased Propulsive Efficiency and Reduced Platform Drag 207.2 Increased Accuracy in Identifying Faulty Components. 207.3 Trending of Performance Degradation and Early Corrective Action. . 217.4 Business Benefits 217.4.1 W
15、arranty/Guarantee Mitigation . 217.4.2 Reduced Support Services Costs . 217.4.3 Life Limited Parts 217.4.4 Increased Residual Value . 227.5 Reduced Weight of Airframe Systems through Reduced Redundancy and Conservatism . 227.6 Maintenance Savings 227.6.1 Reduced Line Maintenance Labor-Hours/Staffing
16、 227.6.2 Reduced Shop Maintenance Labor-Hours/Staffing 227.6.3 Reduced Number of LRUs Returned for Bench Check/Overhaul and Reduced “Back Shop”Labor-Hours/Staffing . 237.7 Operational Savings 237.7.1 Fewer Delays, Diversions, Air-Turnbacks and Unplanned Component Removals 237.7.2 Greater Platform Av
17、ailability . 237.8 Savings from Reduced Capital Investments . 237.8.1 Reduced Spare Equipment, Parts and Material Stocks . 247.8.2 Reduced Maintenance Facilities and Equipment at All Levels . 247.8.3 Reduced Investment in Production Equipment and Facilities due to Lower Demand for Vehicles,Spares, a
18、nd Material . 247.9 Other Miscellaneous Costs. 247.9.1 Marginally Reduced Dependence on Strategic Materials and Obsolete Components 248. CHALLENGES ASSOCIATED WITH COMPLETING A COST BENEFIT STUDY 258.1 Scope of Cost Benefit Study . 258.2 Data Availability . 258.3 Qualitative Values . 258.4 Desired F
19、idelity . 268.5 Perception of PHM System Value . 268.6 Is a Cost Benefit Study Really Necessary? 268.7 PHM is Too Good to Be True 27SAE INTERNATIONAL ARP6275 Page 3 of 34 9. EXAMPLES OF PHM IMPLEMENTATION AND COST ANALYSIS MODELS 279.1 Implementation of CBM+ on U.S. Army Helicopters . 279.2 IVHM Dev
20、elopment on the Gulfstream G650 Aircraft; Aircraft Health and Trend MonitoringSystem (AHTMS) 289.2.1 Deriving the Business Case 309.3 IVHM Development on the Embraer E-Jets 319.3.1 Business Case 329.4 Integration of a HM model (Reference 2) . 3310. SUMMARY 3311. NOTES 34SAE INTERNATIONAL ARP6275 Pag
21、e 4 of 34 1. SCOPE This ARP provides insights on how to perform a cost benefit analysis (CBA) to determine the return on investment that would result from implementing an integrated Health Management (HM) system on an air vehicle. The word “integrated” refers to the combination or “roll up” of sub-s
22、ystems health management tools to create a platform centric system. The document describes the complexity of features that can be considered in the analysis, the different tools and approaches for conducting a CBA and differentiates between military and commercial applications. This document is inte
23、nded to help those who might not necessarily have a deep technical understanding or familiarity with HM systems but want to either quantify or understand the economic benefits (i.e., the value proposition) that a HM system could provide. Prognostics is a capability within some HM systems that provid
24、es an estimation of remaining useful life (RUL) or time to failure and so Prognostic Health Management (PHM) is used where this predictive element exists. IVHM refers to an integrated vehicle level system deployed on a fleet of platforms and might, but not necessarily, include predictive elements.1.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEARP62752014DETERMINATIONOFCOSTBENEFITSFROMIMPLEMENTINGANINTEGRATEDVEHICLEHEALTHMANAGEMENTSYSTEM 实施

链接地址:http://www.mydoc123.com/p-1023257.html