SAE ARP 5660A-2011 Deicing Facility Operational Procedures《除冰设施操作规程》.pdf
《SAE ARP 5660A-2011 Deicing Facility Operational Procedures《除冰设施操作规程》.pdf》由会员分享,可在线阅读,更多相关《SAE ARP 5660A-2011 Deicing Facility Operational Procedures《除冰设施操作规程》.pdf(47页珍藏版)》请在麦多课文档分享上搜索。
1、_SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising theref
2、rom, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be reaffirmed, revised, or cancelled. SAE invites your written comments and suggestions. Copyright 2011 SAE International All rights reserved. No part of this publication ma
3、y be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: +1 724-776-4970 (outside US
4、A) Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.orgSAE values your input. To provide feedback on this Technical Report, please visit http:/www.sae.org/technical/standards/ARP5660AAEROSPACERECOMMENDEDPRACTICEARP5660 REV. A Issued 2009-06 Revised 2011-01Superseding AR
5、P5660 Deicing Facility Operational Procedures RATIONALEARP5660 has been revised to include updated procedures, most notably related to the requirement for visual hold procedures to supplement verbal communication procedures during aircraft “engines-on” deicing/anti-icing on the ground.FOREWORDThis d
6、ocument establishes the minimum recommended practices for the standardization of operational procedures at Designated Deicing Facilities (Central Deicing Facilities/Remote Deicing Facilities), to ensure the safe operation of aircraft, equipment and personnel during ground icing conditions TABLE OF C
7、ONTENTS 1. SCOPE 4 1.1 Purpose . 41.2 Infrastructure . 41.3 Field of Application 4 2. REFERENCES 5 2.1 Applicable Documents 52.2 Abbreviations 72.3 Recommended DDF Terminology 8 3. DDF OPERATING PROCEDURES 9 3.1 Management Plan . 93.2 DDF Operations 103.3 Alternative Contamination Removal 103.4 Spec
8、ific Aircraft Procedures and Precautions 103.5 Critical Surface Check 103.6 Anti-icing Fluid Condition 113.7 Aircraft and vehicle movement procedures 113.8 Fluid application 113.9 Fluid Blending . 113.10 Pre- Dispatch Procedures . 113.11 Preventive Anti-icing . 113.12 Contingency plans 113.13 Weathe
9、r monitoring and reporting sources: 11 4. COMMUNICATIONS 12 SAE ARP5660A Page 2 of 474.1 Communication Protocols . 124.2 Communications Deicers and Facility Operators 124.3 Communications: DDF Essential Information . 14 5. DEICING/ANTI-ICING FLUIDS ENVIRONMENTAL CONSIDERATIONS 16 5.1 Environmental I
10、mpact . 165.2 Environmental Standards and Guidelines 165.3 Collection and Disposal of Effluent from Deicing Operations . 175.4 Drain Valves 175.5 Fluid Run-Off Testing and Reporting 175.6 Environmental Operations 185.7 Glycol Management/Mitigation Plan . 195.8 Environmental Emergency/Spill Response
11、Plan 205.9 Handling Spent Fluid . 205.10 Design Considerations for Management of Spent Fluid . 215.11 Glycol Mitigation Methods . 215.12 New Deicing Fluid . 22 6. TRAINING . 23 6.1 Training Course Content and Training Frequency . 236.2 Regulatory Compliance Requirements . 236.3 Training Program 236.
12、4 Examinations. 246.5 Ground/Maintenance Personnel Training . 246.6 Training for Deicing Aircraft of Another Operator . 24 7. DDF EMERGENCY ACTION PLANS . 25 7.1 Fire 257.2 Adverse Weather Conditions 257.3 Communications - Emergencies . 25 8. SNOW REMOVAL 28 8.1 Overview . 288.2 Surface Areas to be
13、considered . 288.3 Snow Removal Responsibilities and Operations 288.4 Snow Removal Methods . 308.5 Communication Protocols . 308.6 Closing Deicing Facilities 308.7 Cleanup. 30 9. SAFETY 31 9.1 General . 319.2 Deicing Vehicles 319.3 Aircraft Operators 329.4 Personnel 329.5 DDF Operators 32 10. EQUIPM
14、ENT . 32 10.1 General Deicing Equipment: . 3210.2 Equipment Maintenance . 3210.3 Fixed Equipment . 3310.4 Mobile Equipment . 33SAE ARP5660A Page 3 of 4710.5 Portable Equipment. 3310.6 Personal Protective Equipment . 33 11. DOCUMENTATION 34 11.1 Record Keeping 3411.2 DDF Operator 35 12. FLUIDS MANAGE
15、MENT 35 12.1 Fluid Management 3512.2 Fresh Fluids 36 13. QUALITY CONTROL 37 13.1 Objectives . 3713.2 Scope 3813.3 OPS Debriefing . 3813.4 Internal Audits . 3813.5 Fluid Testing 38 14. APPROVALS 38 14.1 Regulatory . 3814.2 Airport Authority Permits or Agreements 3814.3 Air Operator(s) Program Accepta
16、nce . 3814.4 Environmental Mitigation Plans . 38 15. GENERAL . 39 15.1 Pre-Storm Planning . 3915.2 Establish Control Boundaries 4015.3 Special Requirements . 4115.4 Information Dissemination 4115.5 Deice Hold Procedures . 4115.6 Facility Operation 41 16. NOTES 41APPENDIX A COMMUNICATION PROTOCOLS .
17、42APPENDIX B SAMPLE PILOT BRIEF SHEET SINGLE SERVICE PROVIDER . 47TABLE 1 PRE-STORM PLANNING CONFERENCE CALL FORMAT . 40TABLE A1 ICEHOUSE COMMUNICATION SAMPLE 42TABLE A2 (A) ICEHOUSE COMMUNICATION SAMPLE 42TABLE A2 (B) ICEHOUSE/PIC COMMUNICATION FLOW - SAMPLE 43TABLE A2 (C) ICEHOUSE / DE-ICIER COMMU
18、NICATION SAMPLE . 44TABLE A3 EMERGENCY COMMUNICATION PROTOCOLS . 46SAE ARP5660A Page 4 of 471. SCOPE 1.1 Purpose The purpose of this document is to provide guidelines for the standardization of safe operating procedures to be used in performing the services and maintenance at Designated Deicing Faci
19、lities (Central Deicing Facilities/Remote Deicing Facilities) that are necessary for proper deicing/anti-icing of aircraft on the ground and performing of associated checks in accordance with the various approved ground icing programs, while considering applicable local environmental, operational an
20、d economic requirements. This document should be used by regulators and airport authorities to develop and standardize approvals and permits for the establishment and operation of a DDF. The coordination of stakeholders is required prior to the approval of design plans for a deicing facility. Operat
21、ing procedures must be agreed to, in writing, by all air operators, airport authorities, regulators and service providers prior to commencing deicing operations. 1.2 Infrastructure During the design phase of a Designated Deicing Facilities (DDF) careful attention must be given to ensure that the inf
22、rastructure is in place to support the operating procedures outlined in this document. Designers of a DDF should refer to ARP4902 for guidance. 1.3 Field of Application 1.3.1 Regulatory Considerations Regulations governing aircraft operations in icing conditions shall be followed. Specific rules for
23、 aircraft are set forth in United States Federal Aviation Regulations (FARs), European Air Safety Agency (JAR/EASA) Regulations, Canadian Air Regulations (CARs), and others. Paraphrased, these rules state that NO ONE SHOULD DISPATCH OR TAKE OFF AN AIRCRAFT WITH FROZEN DEPOSITS ON COMPONENTS OF THE A
24、IRCRAFT THAT ARE CRITICAL TO SAFE FLIGHT.The ultimate responsibility for the determination that the aircraft is “clean” (i.e. no frozen deposits on critical surfaces) andmeets airworthiness requirements rests with the pilot in command of the aircraft. 1.3.2 Agreements and Contracts The information c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEARP5660A2011DEICINGFACILITYOPERATIONALPROCEDURES 除冰 设施 操作规程 PDF

链接地址:http://www.mydoc123.com/p-1023159.html