SAE AIR 6291-2014 Guidelines for Repair Process Evaluation of Aluminum Bonded Structure《铝结合机构的修理过程评估指南》.pdf
《SAE AIR 6291-2014 Guidelines for Repair Process Evaluation of Aluminum Bonded Structure《铝结合机构的修理过程评估指南》.pdf》由会员分享,可在线阅读,更多相关《SAE AIR 6291-2014 Guidelines for Repair Process Evaluation of Aluminum Bonded Structure《铝结合机构的修理过程评估指南》.pdf(73页珍藏版)》请在麦多课文档分享上搜索。
1、_ SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising there
2、from, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions. Copyright 2014 SAE International All rights reserved. No part of this p
3、ublication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: +1 724-776-497
4、0 (outside USA) Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.org SAE values your input. To provide feedback on this Technical Report, please visit http:/www.sae.org/technical/standards/AIR6291 AEROSPACE INFORMATION REPORT AIR6291 Issued 2014-07 Guidelines for Repair
5、 Process Evaluation of Aluminum Bonded Structure RATIONALE This document is intended to satisfy the need for a checklist of best practices in implementation of tooling, process steps, and quality controls that help to make sure that a previously substantiated repair design and process requirements a
6、re met. TABLE OF CONTENTS 1. SCOPE 4 1.1 Purpose . 4 2. APPLICABLE DOCUMENTS 4 2.1 SAE Publications . 4 2.2 Other References 5 3. DEFINITIONS . 5 4. GENERAL . 7 4.1 Overview . 7 4.2 Process Flows . 7 4.2.1 Process Flows Overview . 7 4.2.2 Process Flows Role of Quality Personnel . 7 4.2.3 Process Flo
7、ws Recommended Steps . 7 4.3 Preparation Steps Prior To Repair Accomplishment 9 4.3.1 Determine the Part Characteristics . 9 4.3.2 Determine if the Part Requires Removal 10 4.3.3 Assess the Damage 13 4.3.4 Remove the Part if Necessary 13 4.3.5 Identify the Part Construction 14 4.3.6 Make Sure Facili
8、ties Are Satisfactory . 14 4.3.7 Make Sure Personnel Are Qualified . 14 4.3.8 Remove the Damage 15 4.3.9 Inspect the Part for Corrosion . 17 4.3.10 Confirm Damage is Removed - Select NDI Method . 19 4.3.11 Confirm Damage is Removed - Make Sure NDI Equipment is Acceptable 20 4.3.12 Confirm Damage is
9、Removed - Do the NDI Inspection 20 4.3.13 Select Applicable Repair Method 20 4.3.14 Assess Facilities 22 4.3.15 Procure Materials / Parts / Consumables . 25 4.3.16 Inspect the Materials / Parts . 28 4.3.17 Tooling Quality Check . 33 4.3.18 Schedule Repair Activity . 36 4.4 Repair Accomplishment 37 S
10、AE INTERNATIONAL AIR6291 Page 2 of 73 4.4.1 Repair Accomplishment General Steps 37 4.4.2 Prepare Surfaces for Bonding . 38 4.4.3 Bond-Tool Preparation 43 4.4.4 Bond line Check/Dry Fit Check . 43 4.4.5 Staging of Time and Temperature Sensitive (TATS) Materials 49 4.4.6 Lay Up of Repair . 50 4.4.7 Lay
11、up of Witness Coupons . 52 4.4.8 Bag and Cure of Repair 53 4.5 Post Repair Actions and Finishing Sequences . 55 4.5.1 Post Repair Actions and Finishing Sequences General Steps 55 4.5.2 Remove from Heat Source, Debag and Inspect . 55 4.5.3 NDI and Mechanical Testing . 57 4.5.4 Accomplish Finish Seque
12、nce to Bond Assembly . 58 4.5.5 Reassemble Subcomponent Details and Apply Finish to Assembly 59 4.5.6 Perform Dimensional and Fit Check . 60 4.5.7 Accomplish Weight and Balance Procedures . 60 4.5.8 Fire/Heat protection 60 4.5.9 Acoustic Procedures . 62 4.5.10 Identify Repair and Prepare Records . 6
13、2 5. NOTES 63 APPENDIX A REPAIR TOOLING DIMENSIONAL REPORT EXAMPLE . 64 APPENDIX B THERMAL AND PRESSURE REPORT EXAMPLE . 66 APPENDIX C STANDARD LEAK TEST EXAMPLE 69 APPENDIX D ALUMINUM WITNESS COUPON SUMMARY . 71 FIGURE 1 ROLE INDICATOR KEY FOR MAJOR FLOWCHART SECTIONS . 8 FIGURE 2 REPAIR PREPARATIO
14、N DECISION FLOW 8 FIGURE 3 PART REMOVAL DECISION FLOW. . 10 FIGURE 4 A THERMAL CAMERA IDENTIFIES HEAT ABSORPTION AND CONSEQUENT TEMPERATURE DIFFERENCES BETWEEN LARGE FITTINGS AND ADJACENT BONDED STRUCTURE. . 11 FIGURE 5 EXAMPLE OF A FITTING THAT IS ASSEMBLED TO A WEDGE ASSEMBLY AFTER THE WEDGE IS IN
15、ITIALLY FABRICATED. 12 FIGURE 6 EXAMPLE OF OVERHEATING DURING SKIN REMOVAL 16 FIGURE 7 EXAMPLE OF CORRODED CORE/WEAK BOND/GOOD BOND AREAS . 17 FIGURE 8 EXAMPLE OF CORRODED CORE/WEAK BOND/GOOD BOND AREAS . 18 FIGURE 9 EXAMINING PEELED SKIN AND RESIDUAL CORE FOR EVIDENCE OF CORROSION 19 FIGURE 10 FOAM
16、ING OF ADHESIVE DUE TO THE IMPROPER APPLICATION OF VACUUM PRESSURE. . 20 FIGURE 11 AUTOCLAVE PROCESSED TEST COUPON (LEFT) SHOWS IDEAL ADHESIVE BONDING CONDITION. VACUUM PROCESSED TEST COUPON (RIGHT) SHOWS FAILURES DUE TO FOAMING OF FILM ADHESIVE. 21 FIGURE 12 FACILITIES DETERMINATION PROCESS FLOW. .
17、 22 FIGURE 13 CATASTROPHIC FAILURE OF A FLIGHT CONTROL WEDGE ASSEMBLY THAT WAS REPAIRED USING ALTERNATE (AND INAPPROPRIATE) SURFACE PREPARATION PROCEDURES . 24 FIGURE 14 NON-PAA ALUMINUM HONEYCOMB CORE FOUND DISINTEGRATED AFTER LESS THAN 2 YEARS FLIGHT TIME 27 FIGURE 15 PARTS CHECK PROCESS FLOW. . 2
18、8 FIGURE 16 TOOLING CHECK PROCESS FLOW. . 33 FIGURE 17 EXAMPLE OF A THERMOCOUPLE DIAGRAM 34 FIGURE 18 USAGE OF PLACARDS TO KEEP TRACK OF INSPECTION INTERVALS IS A VISIBLE METHOD OF ENSURING COMPLIANCE TO INSPECTION REQUIREMENTS . 35 FIGURE 19 REPAIR SCHEDULING PROCESS FLOW. . 36 FIGURE 20 REPAIR IMP
19、LEMENTATION DECISION FLOW 37 FIGURE 21 PREPARE SURFACES FOR BONDING FLOW 38 FIGURE 22 FIT CHECK PROCESS FLOW . 44 FIGURE 23 EXAMPLE OF NON-UNIFORM CORE IMPRINT . 45 FIGURE 24 EXAMPLE OF A VERIFICATION FILM TEST CURED OUT AND CIRCLED THICKNESS INDICATIONS IN AREAS THAT APPEAR DARK WHEN EXPOSED TO A L
20、IGHT SOURCE . 46 FIGURE 25 TUNNEL VOIDS SHOWN AT THE INTERFACE BETWEEN A TOOL SIDE SKIN AND SPAR FLANGE FOR A WEDGE ASSEMBLY . 47 SAE INTERNATIONAL AIR6291 Page 3 of 73 FIGURE 26 DESTRUCTIVE ANALYSIS OF A FLAP VANE ASSEMBLY SHOWING THE CURED FILM ADHESIVE BETWEEN THE OUTER SKIN AND INTERNAL CORE AND
21、 DOUBLER . 48 FIGURE 27 CONTAMINATION CONTROL PROCESS FLOW . 50 FIGURE 28 TYPICAL BAGGING SCHEDULE FOR ALUMINUM BONDED REPAIRS 53 FIGURE 29 EXAMPLE OF A THERMOCOUPLE FAILURE DURING REPAIR CURE . 54 FIGURE 30 POST REPAIR ACTIONS AND FINISHING DECISION FLOW . 56 FIGURE 31 EXAMPLE OF CONTINUOUS ADHESIV
22、E FLASH ALONG A BOND LINE EDGE . 57 FIGURE 32 DETAIL OF AN AJ BEING USED TO CHECK FOR ALIGNMENT OF AN ATTACH FITTING FOR A FLIGHT CONTROL ASSEMBLY. . 61 SAE INTERNATIONAL AIR6291 Page 4 of 73 1. SCOPE This SAE Aerospace Information Report (AIR) is intended to be used as a process verification guide
23、for evaluating implementation of key factors in repair of metal bond parts or assemblies in a repair shop environment. This guide is to be used in conjunction with a regulatory approved and substantiated repair, and is intended to promote consistency and reliability. 1.1 Purpose This SAE Aerospace I
24、nformation Report (AIR) is intended to be used as a guide for regulatory and Customer personnel during the evaluation process of a substantiated repair submitted to the aforementioned parties by a repair station acting on behalf of a Customer to carry out a repair to aluminum bonded structure. This
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEAIR62912014GUIDELINESFORREPAIRPROCESSEVALUATIONOFALUMINUMBONDEDSTRUCTURE 结合 机构 修理 过程 评估 指南 PDF

链接地址:http://www.mydoc123.com/p-1020385.html