REG UFGS-42 22 16 00 40-2011 RECIPROCATING PROCESS CHILLERS AND COOLERS.pdf
《REG UFGS-42 22 16 00 40-2011 RECIPROCATING PROCESS CHILLERS AND COOLERS.pdf》由会员分享,可在线阅读,更多相关《REG UFGS-42 22 16 00 40-2011 RECIPROCATING PROCESS CHILLERS AND COOLERS.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-42 22 16.00 40 (May 2011)-Preparing Activity: NASA SupersedingUFGS-42 22 16.00 40 (February 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 42 - PROCESS HEATING, COOLING, AND D
2、RYING EQUIPMENTSECTION 42 22 16.00 40RECIPROCATING PROCESS CHILLERS AND COOLERS05/11PART 1 GENERAL1.1 SUMMARY1.2 REFERENCES1.3 SUBMITTALS1.4 SYSTEM DESCRIPTION1.4.1 Mechanical1.4.2 ElectricalPART 2 PRODUCTS2.1 MANUFACTURED CHILLER UNIT2.2 LIQUID CHILLER2.3 COMPONENTS2.3.1 Compressor2.3.1.1 Lubricati
3、ng System2.3.1.2 Capacity-Reduction2.3.1.3 Motor2.3.1.4 Crankcase Heater2.3.2 Condenser2.3.3 Evaporator2.4 ACCESSORIES2.4.1 Refrigerant Circuit2.4.2 Control2.4.2.1 Sequence Panel2.4.2.2 Control Panel2.4.2.3 Operating Controls2.4.3 Alarm Package2.4.4 Hot Gas Bypass2.4.5 Gage Board2.4.6 Vibration Isol
4、atorsPART 3 EXECUTION3.1 INSTALLATION3.2 MANUFACTURERS FIELD SERVICESECTION 42 22 16.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3 DEMONSTRATION- End of Section Table of Contents -SECTION 42 22 16.00 40 Page 2Provided by IHSNot for
5、ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-42 22 16.00 40 (May 2011)-Preparing Activity: NASA SupersedingUFGS-42 22 16.00 40 (February 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October
6、2011*SECTION 42 22 16.00 40RECIPROCATING PROCESS CHILLERS AND COOLERS05/11*NOTE: This specification covers the requirements for water cooled reciprocating water chillers for refrigerating and air conditioning applications.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format S
7、tandard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information a
8、nd requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 SUMMARYIndicate on shop drawings the general ph
9、ysical layout of reciprocating process chiller and cooler components, controls, and internal tubing and wiring details. Submit shop drawings and connection diagrams indicating the relations and connections of the following items:a. Compressorb. Motorc. Control diagramsd. Control panele. CondenserSEC
10、TION 42 22 16.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-f. Evaporatorg. Refrigerant circuith. Alarm systemi. Vibration isolatorsj. Gages1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the gu
11、ide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place t
12、he reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*T
13、he publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)AHRI 550/590 (2003) Performance Rating of Water-Chilling Packages Using
14、the Vapor Compression CycleAMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)ASHRAE EQUIP IP HDBK (2008; Errata 1 2010) Handbook, HVAC Systems and Equipment (IP Edition)ASHRAE EQUIP SI HDBK (2008; Errata 1 2010) Handbook, HVAC Systems and Equipment (SI Edition)ASHRAE
15、HVAC APP SI HDBK (2011) HVAC Applications Handbook, SI EditionINTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)ISO 1940-1 (2003; Cor 2005) Mechanical Vibration - Balance Quality Requirements for Rotors in SECTION 42 22 16.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking perm
16、itted without license from IHS-,-,-a Constant (Rigid) State - Part 1: Specification and Verification of BalanceNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA MG 1 (2009) Motors and GeneratorsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2011; TIA 11-1; Errata 2011) National Electrica
17、l CodeU.S. DEPARTMENT OF ENERGY (DOE)DOE CE-6 (2000) How to Buy an Energy-Efficient Air-Cooled Electric Chiller1.3 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the proje
18、ct. Keep submittals to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed thr
19、ough the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designat
20、ion to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Pro
21、ject Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; subm
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS42221600402011RECIPROCATINGPROCESSCHILLERSANDCOOLERSPDF
链接地址:http://www.mydoc123.com/p-1019675.html