1、*USACE / NAVFAC / AFCEC / NASA UFGS-26 18 23.00 40 (August 2013)-Preparing Activity: NASA SupersedingUFGS-26 18 23.00 40 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2013*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 18 23.00 40ME
2、DIUM-VOLTAGE SURGE ARRESTERS08/13PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 PREDICTIVE TESTING AND INSPECTION TECHNOLOGY REQUIREMENTS1.4 MAINTENANCE MATERIALS SUBMITTALS1.4.1 Installation Instructions, Surge Arresters1.4.2 O INT 1 2011) Standard for Separable Insulated Connector Systems for Power
3、 Distribution Systems Above 600VIEEE C62.11 (2012) Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits (1kV)NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)RCBEA GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance GuideNATIONAL ELECTRICAL MANUFACT
4、URERS ASSOCIATION (NEMA)NEMA LA 1 (2009) Standard for Surge ArrestersNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2011; Errata 2 2012) National Electrical Code1.2 SUBMITTALS*SECTION 26 18 23.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
5、IHS-,-,-NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification technical editors have designated those items that require Government approval, due to thei
6、r complexity or criticality, with a “G.“ Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army project
7、s, use a code of up to three characters within the submittal tags following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organizati
8、on in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item fo
9、r Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that reviews the submittal fo
10、r the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsFabrication Drawings; G; G, _Installation Drawings; G; G, _SD-03 Product DataEquipment and Performance Data; G; G, _Mounting Brackets; G; G, _SD-08 Manufacturers InstructionsInstallatio
11、n Instructions; G; G, _SD-10 Operation and Maintenance DataOperation and Maintenance Manuals; G; G, _SECTION 26 18 23.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.3 PREDICTIVE TESTING AND INSPECTION TECHNOLOGY REQUIREMENTS*NOTE: The
12、Predictive Testing and Inspection (PT&I) tests prescribed in Section 01 86 26.07 40 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS are MANDATORY for all NASA _ assets and systems identified as Critical, Configured, or Mission Essential. If the system is non-critical, non-configured, and not
13、mission essential, use sound engineering discretion to assess the value of adding these additional test and acceptance requirements. See Section 01 86 26.07 40 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS for additional information regarding cost feasibility of PT&I.*This section contains
14、systems and/or equipment components regulated by NASAs Reliability Centered Building and Equipment Acceptance Program. This program requires the use of Predictive Testing and Inspection (PT&I) technologies in conformance with RCBEA GUIDE to ensure building equipment and systems have been installed p
15、roperly and contain no identifiable defects that shorten the design life of a system and/or its components. Satisfactory completion of all acceptance requirements is required to obtain Government approval and acceptance of the Contractors work.Perform PT&I tests and provide submittals as specified i
16、n Section 01 86 26.07 40 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS.1.4 MAINTENANCE MATERIALS SUBMITTALS1.4.1 Installation Instructions, Surge ArrestersSubmit manufacturers instructions for surge arresters including special provisions required to install equipment components and system p
17、ackages. Provide special notices that detail impedances, hazards and safety precautions.1.4.2 O & M Manuals, Surge ArrestersProvide operation and maintenance manuals for surge arresters specified.PART 2 PRODUCTSSubmit surge arrester equipment and performance data, including life, test, system functi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS26182300402013MEDIUMVOLTAGESURGEARRESTERSPDF

链接地址:http://www.mydoc123.com/p-1019656.html