1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 82 43.00 40 (August 2011)-Preparing Activity: NASA SupersedingUFGS-23 82 43.00 40 (February 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AI
2、R CONDITIONINGSECTION 23 82 43.00 40ELECTRIC DUCT HEATERS08/11PART 1 GENERAL1.1 REFERENCES1.2 ADMINISTRATIVE REQUIREMENTS1.2.1 Pre-Installation Meetings1.3 SUBMITTALSPART 2 PRODUCTS2.1 SYSTEM DESCRIPTION2.1.1 Performance Requirements2.2 COMPONENTS2.2.1 Heating Elements And Enclosures2.2.2 ControlsPA
3、RT 3 EXECUTION3.1 INSTALLATION3.2 FIELD QUALITY CONTROL- End of Section Table of Contents -SECTION 23 82 43.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 82 43.00 40 (August 2011)-Preparing Activi
4、ty: NASA SupersedingUFGS-23 82 43.00 40 (February 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION 23 82 43.00 40ELECTRIC DUCT HEATERS08/11*NOTE: This guide specification covers the requirements for electric duct heaters. Ensure that drawin
5、gs indicate capacity, voltage, rating, control-circuit voltage, heating stages, cfm, sizes, and other pertinent data.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this
6、guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggest
7、ions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the t
8、ext by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Referenc
9、e Wizards Check Reference feature to update SECTION 23 82 43.00 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the issue dates.References not used in the text will automatically be deleted from this section of the project specification when
10、 you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.UNDERWRITERS LABORATORIES (UL)UL 1996 (2009; Reprint Dec 2009) El
11、ectric Duct Heaters1.2 ADMINISTRATIVE REQUIREMENTS*NOTE: If Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS is not included in the project specification, applicable requirements therefrom should be inserted and the following paragraph deleted.*Section 26 00 00.00 20 BASIC ELECTRICAL MA
12、TERIALS AND METHODS applies to work specified in this section.1.2.1 Pre-Installation MeetingsThe Contracting Officer will schedule a pre-installation meeting within 30_ days of Contract Award. Provide the following for review and approval:a. Submit fabrication drawings for duct heaters consisting of
13、 fabrication and assembly details to be performed in the factory.b. Submit equipment and performance data for duct heaters including use life, system functional flows, safety features, and mechanical automated details.c. Submit manufacturers instructions for duct heaters including installation drawi
14、ngs showing any special provisions required to install equipment components and system packages. Clearly note impedances, hazards and safety precautions.1.3 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect
15、only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some SECTION 23 82 43.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or n
16、etworking permitted without license from IHS-,-,-submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in cont
17、ext of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for
18、 Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first brack
19、eted item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a design
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS23824300402011ELECTRICDUCTHEATERSPDF

链接地址:http://www.mydoc123.com/p-1019649.html