1、*USACE / NAVFAC / AFCESA / NASA UFGS-22 05 83.63 (November 2013)-Preparing Activity: NASA UFGS-22 05 83.63 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2013*SECTION TABLE OF CONTENTSDIVISION 22 - PLUMBINGSECTION 22 05 83.63CURED-IN-PLACE PIP
2、E (CIPP) LINING11/13PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 PROJECT/SITE CONDITIONS1.4 WARRANTYPART 2 PRODUCTS2.1 SYSTEM DESCRIPTION2.2 PIPE LINING MATERIALS2.2.1 CIPP Lining Tube2.2.2 Resin2.2.3 CIPP PropertiesPART 3 EXECUTION3.1 INSTALLATION3.1.1 General3.1.2 Deviations3.1.3 Pipe Preparation
3、3.1.4 CIPP Installation Procedure3.1.4.1 Wet Out3.1.4.2 Insertion3.1.4.3 Curing3.1.4.4 Finish3.1.5 Liner Inspection3.2 FIELD QUALITY CONTROL3.3 ADJUSTING AND CLEANING- End of Section Table of Contents -SECTION 22 05 83.63 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted wit
4、hout license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-22 05 83.63 (November 2013)-Preparing Activity: NASA UFGS-22 05 83.63 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2013*SECTION 22 05 83.63CURED-IN-PLACE PIPE (CIPP) LINING11/13*
5、NOTE: This guide specification covers the requirements for cured-in-place pipe lining, including applicable industry standards, installation, and performance verification for facility interior roof drain leader piping from the roof to floor level cold and hot potable water drain electrical conduit g
6、as process piping steam ventilation waste water piping systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements
7、by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specificat
8、ion are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This section addresses the procedures for the reconstruction of pipelines and conduits, 10 to 244 cm 4 to 96 in. diameter, by the pulled-in-place installation of a resin-impregnated, flexible fabric tube
9、 into an existing conduit and secondarily inflated through the inversion of a calibration hose by the use of a hydrostatic head or air pressure. Safety issues relating to the use of this specification should be addressed in a separate section.*SECTION 22 05 83.63 Page 2Provided by IHSNot for ResaleN
10、o reproduction or networking permitted without license from IHS-,-,-*NOTE: Show the following information on the project drawings:1. Exact Duplication in Terminology: Specifications and drawings come from different computer programs. The terminology describing these items, systems, equipment, and ma
11、terials comes from different databases. For this reason, ensure that each piece of equipment, or item, or system is identified absolutely identically in the specification as it is in the drawings. Ensure exact terminology between drawings and specifications, specification sections and drawings secti
12、ons, and drawings to drawings.2. Insert additional items to be shown on the drawings.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph
13、 by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue date
14、s.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred
15、 to within the text by the basic designation only.AMERICAN PETROLEUM INSTITUTE (API)API Spec 13A (2010) Specification for Drilling-Fluid MaterialsAMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C950 (2013) Fiberglass Pressure PipeASTM INTERNATIONAL (ASTM)ASTM D543 (2006) Standard Practices for Evaluatin
16、g SECTION 22 05 83.63 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the Resistance of Plastics to Chemical ReagentsASTM D638 (2010) Standard Test Method for Tensile Properties of PlasticsASTM D790 (2010) Flexural Properties of Unreinforced an
17、d Reinforced Plastics and Electrical Insulating MaterialsASTM F1216 (2009) Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated TubeASTM F1743 (2008) Standard Practice for Rehabilitation of Existing Pipeline and Conduits by Pulled
18、-In-Place Installation of Cured-In-Place Thermosetting Resin Pipe (CIPP)1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification technical ed
19、itors have designated those items that require Government approval, due to their complexity or criticality, with a “G.“ Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or complex in cont
20、ext of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for
21、 Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first brack
22、eted item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a design
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS220583632013CUREDINPLACEPIPECIPPLININGPDF

链接地址:http://www.mydoc123.com/p-1019642.html